ML20073F431

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1983
ML20073F431
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 03/15/1983
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20073F388 List:
References
NUDOCS 8304150484
Download: ML20073F431 (12)


Text

.

AVERAGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

Turkey Point 3 UNIT DATE 11 arch 15.1983 P. Pace COMPLETED fly (305) 552-3654 TELEP110NE february, 1983 MONDI DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL tMWe Net)

-lMWe-Net) 1 695 696 17 693 O';f /_

2 18 3

695 695' 19 696 690 4

20 693 695 5

2I 697 696 6

22 692 23 8

683; 694 24 60 694 9

25 092 go 26 II 474 697 27 586 090 I,

28

~

13 657 29 I4 657 30 660 15 33 668 16 INSTRUCTIONS On this forinat. !nt the nerage daily unit power lewiin MWe Li for ca:h day in the reportinginanth.Coinpute to the nestest wb.de eqawart.

(9/77) 8304150484 830315 DR ADOCK 05000250 PDR

.=

i Y

l OPIItAl!NG DATA REPORT I

50-250 UUNI(( Marctr 1983 COMPl.ETED llY E._Pa_Le_,

l TEl.EPilONE (305)_.552.-3654 OPER.A..I l.m., S F/GUS Turkey Point 3 Note' Unit 3 operated at

1. Unit Mme
2. Itepmting twind:

FebEMary., 1983 essentially full power except

3. Licensed t hennal Power pnVt):

2200 for the outage listed in the j

760

" Unit Shutdowns and Power "

4. Namepl oe Ra'ing (Guns anver 693 Reductions" report.
5. Design Ele, trical Rating (Net.%DVe):

68U

6. Maximum is pendalde Capacity (Gron MWe):

c 646

7. Masimum I) pendalde Capacity (Net MWe):
8. If Chanyo Oant in Capacity Ratings (items Number 3 Through 7)Since Last Report. Give Reasons:

~~---~~-

9. Power lxsti fo Which flestricted.lf Any (Net MWe):

l

10. Rew,n, I or Re,trictions, if Anv:

[

This Month Yr.-to Date Cumulative i

!!. Ilours in a orting Period 672 1,416 89,721.6 w

I

12. Nunh r Of it.mrs Reat f or Was critical 672-1,3B57 6z,904.d 0-0 844.4-
13. Reactor Re4 ne Shutdown llours
14. Ilours Gene ator On I.ine 627.6 1.311.7 60,816.8
15. Unit Resene shutdown llour, 0

0 121.8

16. Grms I hernul 1:nergy Generated (MWH) 1,365,136 2,871,431 124,289,343
17. Grow I lecirivl Eneigy (;cnerated (MWill 444,215 944,665 39, bub /ud
18. Net Electrical Energy Generated plWil) 423,085 899,881 37,487,433
19. Unit Seivire l'accor 93.4 92.6 b/.6 93.4 94.0 67.9
20. Unit Avilabit;ty Factor
21. Unit Capachy I actor (U3ing MDC Net!

97.5 98.4 64.7 22.' Unit Cap.ority I actor (thing DER Net) 90.9 91.7 60.3 i

6.6

/4 5.6-

23. Unit Fort e.! Outape Rate
24. Shutdown 4 Scheduled User Nest 6 Months ( type.Date.and Duration of Fachl:

i i

b

25. If Shut Down At Lnd Of Report Period. Estimated Date of Startup:
26. Unih in Test StatuslPsior to Commercial Operationt

_ Force:nt Achiesed i

INilIA L CRIIICA1.11 Y

}

INillTL LLI CIRICilY COMMI'RCI Al. OPER A IlON i

(9/77)

-wP UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNIT NAME Turkey Point 3

~

DATE March 15. 1983 REPORT MONTil February. 1983 COMPLETED BY P-Pace TELEPl!ONE (305) 552-3654 "i

-5*

=

en 3 so c

,.s '-;

Licensee 5t i,e Cause & Corrective

=

No.

Date g

3g j

,g 5

Event F?

Do Action to o

H j~

E jgg Report n

<E C j'

present Recurrence 6

2 830209 F

0 A

5 HC llTEXCH Power was reduced in accordance with chemistry guidelines due to in-creasing conductivity.

3 830209 F

44.4 A

1 HC HTEXCH The unit was removed from service to repair a condenser tube leak.

4 830211 F

0 H

5 EB XXXXXX Power was maintained at a reduced level to evaluate the effect or ad-ditional secondary loads on degraded grid voltage analyses.

I 2

3 4

F: Forced Reason:

Me: hod:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee 4

C-Refueling 3-Automatic Scram.

Esent Report (LER) File (NUREG-D-Regulatory Restriction CJ-Other (Explain) 01611 E-Operator Training & License Examination F-Adnumstratne p

5 G-Operational Error (Explain) 4- _ to e a nucer..d Exhibit I - Same Source (9/77)

Il-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE 1

DOCKET NO.

50-250 i

UNIT Turkey Point 3 DATE March 15, 1983 ace COMPLETED BY TELEPHONE (305) 552-3654 d

REPORT 110 NTH

_ Februa ry, 1983 i

Unit 3 operated at essentially full power except during the period of February 9 - 11. One leaking condenser plug was plugged and other tubes were plugged as preventive maintenance.

Major safety related maintenance activities included:

A reactor excore instrument recorder was calibrated.

A charging oump was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

f l

e

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-251 1

Turkey Point 4 j

UNIT DA1E _ March 15. 1983 COMPLETED itY P. Pace

-(305) 552-3654 TELEP110NE MONTil February. 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

-(MWe-Net) 1 I _e

~~~

2 g

3 g9 4

5

~~~

6 22 7

23 8

,24 9

~~-

25 10 gg g _.,

28 29 14 30 15 31 l

INSTRUCTIONS l

l On this funnai. tw the aserage daily unit power lesel in MWe Net for ca:h day in the reporting month. Compute to l

the nearest whnte egawatt.

i 19/77)

J 9

e

t 1

OPEllATING DATA REPORT 1

1 DOCKETNo.

50-251 DATE March 15, 1983 Pa CONIPLE TED ilY TEl.EPilONE - 08i)se552-3654l OPER A lING STA1llS

1. Unit N one:

Turkey Point 4 Notes Steam Generator

2. Itepartin; rcriod: _. february 1983 Repa'ir Program in progress.

i

3. Licemeil I hermal Power (N1Wt):

2200

4. Nameplate !!.iting (Grow SIWeI:

760 693

5. Design ilutrical Rating (Net SlWe):

l 680

6. blasimum Dependable Capacity (Gross SIWE):

646

7. Stasimum Degndahle Capacity (Net AlWe):
8. If Ch:mp heur in Capacity liatings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power t.cul ro which itestricted.lf Any (Net 31We):
10. Reamm i or Restrictions. lf Any:

t I

This 51onth Yr to Date Cumulatise j

11. Ilours la 11eporting Period 672 1416 83,449
12. Number of flours Iteactor Was Critical 0

0 59,855.3

13. Reactor I;esene Shutdown linun 0

0 lbb.b

14. Ilours Generator On.Line 0

0 57,896 0

0 31.2

15. Unit Itevne Shutdown !!,ours
16. Gross Thernul I nergy Generated (31Wil) 0 0

121,918,244

17. Gross Electrical Energy Generated plWil) 0

. 0 38,775,572 i

18. Net Electric.d Energy C.enerated plWH)

-897

-1973 36',730,622

19. Unit Senire I actor 0

0 69.4

20. Unit Asaitainhty raetor 0

0 69.4

21. Unit Capacity Factor IUsing SIDC Nc0 0

0 68.1 0

U b3.5

22. Unit Capae:ty Factor IUsing DER Net)
23. Unit Forced Outage Rate 0

0 3.9

24. Shutdowns Scheduled User Nest 6 MonthsIType.Date.and Duration of Each1:
25. If Shut Down At 1.nd Of neport Period Estimated Date of Startup:

April, 1983

26. Units in frst Status IPrior io Connnercial Operation):

Forecast Achieved INillA L CRI TICA til Y INI TI A L ELEC1 RICil Y CO\\l\\tFitCI A L OPER A IlON i

f i

+

07/77:

I

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-251 UNIT NAME Turkey Point 4 DATE

'S er h 14, 10A1 COMPLETED BY P-Para i

REPORT MONTil Fahrna rv _ 1983 TELEPHONE fansi ;;9_164a 3

=

ee

.'5 so 5"o Cause & Correctise

.2 e E

5.2 'A Licensee

.7,

-o

=

No.

Date g

g j

j5 Event

??

$.3 Act' ion to

~ 5 :g Report =

tR C E'

Prevent Recurrence

$5 5

u O

18 821009 S

E72 H

4 HB llTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.

J 1

i i

2 3

4 F: Forced Reason:

Method:

Exhibit G - histra,trans S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee J

C-Refueling 3-Automatic Scram.

Event Report (LERI File (NUREG-D Regulatory Restriction CJ.Other (Explain) 0161)

E4)perator Training & License Examination F-Administrative 9,

5 G-Operational Error (Explain) 4-Ao o ezscuc.,..d Exhibit I - Same Source (9/77) 11-01her (Explain)

SUMMARY

OF OPERATING EXPERIENCE i

DOCKET NO 50-251

)

UNIT Turkey Point 4 DATE March 15, 1983 ace COMPLETED BY (305) 552-3654 TELEP110NE

]

REPORT tiONTII Februa ry,1983 Unit 4 continued the Steam Generator Repair Program.

Other major safety related maintenance activities included:

Two Boric Acid heat tracing circuits were adjusted or repaired.

A 120-140 V DC Static Inverter was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are l

continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing? Refer to correspondence between FPL and NRC for additional i

informa tion.

I f

4

.i l

l I

e 1

i y

y m,

9

,,..,-.i


y

.._,_,-,,,__,,,c,

,-,,,..,--.-,y--

3 w-,

,y,-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St_ 1ucie 1 DA1E _ March 15, 1983 COMPLETED BY P. Pace TELEPilONE - (305) 552-3654 MONTil February, 1983 DAY AVER AGE D I PO ER LEVEL day AVER AGE DAILY POWER LEVEL

- (MWe-Neti I

841 841 1.,

2 840 841

,g 3

773 841' 39 4

831 840 840 838 5

6 840 835 22 839 833 7

3 8J2 831 8

9 842 830 5

841 726 10 11 839 37 12 840 g

841 13 29 843 I4 0

842 31 16 841 c

INSTRUCTIONS On this fonnie. Int the aser. ige daily unit power leselin MWe Nel for es:h d3F I" th* reporting :n.inth. Compute io l

ihe nearest wh<>!c tvpware, l

l (9/77)

(

4 OPEll AllNG DAT A ItEPOlti 50-335 llocKEr No.11arcn 15,1983 Dra g COMPl.EI ED llY P. Pace -

1 El.l?PilONE (3Ub) b52-3654 OPFit A I IN(. STA'I US St. Lucie 1 Notes Unit 1 operated at I " U"" b.""

FebTUap03 essentially full power until

2. Itepmting i,triod:

starting a refueling outage.

3.1.icenwd Ibconal Power (MWt):

9700 890

4. Nameplah Itating (Grow MWe):
5. Design I.lutricalItating(Net MWe):

l 830 862

6. Plasimino liependal.le Capacity (Grow MWe):
7. Masimum li pendalite Capacity (Net MWe):

817

8. If Changes Occur in Capacity Itatings (Items Number 3 Throu3h 7) Since I.ast iteport. Give Itcasons:
9. Pimer Leul l'o which Itestricted,1f Any (Net MWe):
10. Itcauens l'n, Itest:ictions,If Any:

This Month Yr..to Date Cumulalise II. Irours 1.i Ro.orting Period 672 1416 54,264 622.9 13bb.9 44,466.i

12. Number Of 81mirs Iteactor Was Critical
13. Iteactor itewne Simtdown ilour, 0

0 205.3

14. Ilours Geneotor On Line 622.2 1350.9 43,576.2
15. Unit itesen: Shutdow n llour, 0

0 39.3

16. Giou Thermd Fuergy Generated (MWil) 1,659,557 3,532,422 luu,00t,was i
17. Grow I'lettrical Energy Generated (MWill b46,89U 1,1bu,zuu 45,a73,675-
18. Net Electrical I.ncrgy Generated (MWill 518,439 1,099,537 33,363,728
19. Unit Seniac l' actor 92.6 65.4 80.3
20. Unit Asaihinhty factor 92.6 '

9b.4 uu.4

21. Unit Capadty I actor (Using MDC Net) 94.4 95.0 78'~$
22. Unit Cap aty Factor (Using DLit Net) 93.0 93.6 76.3
23. Unit l' ort ed Outage Itate 0

1.1 q,o

24. Shutdown.Sebeduled User Neu (, Months (lyPe.Datesmd Duration of BM

'l

25. If Shut On n At I.nd Of Report Period.1:stimated Date of Startup:

April 30, 1983

26. Unik in Teu Stalm (Prior to Conunerei.d Operationi:

Forecan wa INilIA L Citi1ICAlll'Y INi il A l.1.1.1.CT Ricli Y CO\\l\\ll 1(CI Al. OPER A1 ION (9/77i

50-335 UNITS!!UTDOWNS ANDPOWER REDUCTIONS DOCKET NO.

x. Lucie i UNIT NAME DATE March 15, 1963 COMPLETED BY P. Pace REPORT MONTit Febru a rv. 1983 TELEPilONE (305) 552-3654 e.

E 5 ?

3

^$5 Licensee

,E-r, je, Cause & Correctise No.

Date i

~g 5

1~$

Esent

~?

g3 Action to f:

jgg Report :

mR L

Prevent Recurrence H

g 6

3 830226 S

49.8 C

1 RC FUELXX Unit I was removed from service for refueling and scheduled maintenance.

t I

2 3

4 F: Forced Reason:

W:.tod:

Ex1uba G - 1. truenms S: Scheduled A Equipment Failure (Explain)

1. Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Ect > Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5

G Operational Error (Explain) c_ 4eao e st;,w.,..cl Exhibit I - Same Source (9/77) 11-01her (Explain)

r

SUMMARY

OF OPERATING EXPERIENCE C

DOCKET NO.

50-335 UNIT St. Lucie Unit 1 DATE March 15, 1983 COMPLETED BY P. Pace TEI,EPHONE (305) 552-3654 REPORT 110 NTH Februar.y, 1983 St. Lucie Unit I was removed from s'ervice on February 26, 1983, for a re-fueling and maintenance outage.

Other major safety related maintenance included:

Two containment spray valves were repaired.

A liigh Pressure Safety Injection Pump mechanical seal was replaced.

A Low Pressure Safety Injection Pump mechanical seal was replaced.

A charging pump accumulator was replaced, s

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Comapny commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional in formation.

In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.

.