AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
Turkey Point 3 UNIT DATE 11 arch 15.1983 P. Pace COMPLETED fly (305) 552-3654 TELEP110NE february, 1983 MONDI DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL tMWe Net)
-lMWe-Net) 1 695 696 17 693 O';f /_
2 18 3
695 695' 19 696 690 4
20 693 695 5
2I 697 696 6
22 692 23 8
683; 694 24 60 694 9
25 092 go 26 II 474 697 27 586 090 I,
28
~
13 657 29 I4 657 30 660 15 33 668 16 INSTRUCTIONS On this forinat. !nt the nerage daily unit power lewiin MWe Li for ca:h day in the reportinginanth.Coinpute to the nestest wb.de eqawart.
(9/77) 8304150484 830315 DR ADOCK 05000250 PDR
.=
i Y
l OPIItAl!NG DATA REPORT I
50-250 UUNI(( Marctr 1983 COMPl.ETED llY E._Pa_Le_,
l TEl.EPilONE (305)_.552.-3654 OPER.A..I l.m., S F/GUS Turkey Point 3 Note' Unit 3 operated at
- 1. Unit Mme
- 2. Itepmting twind:
FebEMary., 1983 essentially full power except
- 3. Licensed t hennal Power pnVt):
2200 for the outage listed in the j
760
" Unit Shutdowns and Power "
- 4. Namepl oe Ra'ing (Guns anver 693 Reductions" report.
- 5. Design Ele, trical Rating (Net.%DVe):
68U
- 6. Maximum is pendalde Capacity (Gron MWe):
c 646
- 7. Masimum I) pendalde Capacity (Net MWe):
- 8. If Chanyo Oant in Capacity Ratings (items Number 3 Through 7)Since Last Report. Give Reasons:
~~---~~-
- 9. Power lxsti fo Which flestricted.lf Any (Net MWe):
l
- 10. Rew,n, I or Re,trictions, if Anv:
[
This Month Yr.-to Date Cumulative i
!!. Ilours in a orting Period 672 1,416 89,721.6 w
I
- 12. Nunh r Of it.mrs Reat f or Was critical 672-1,3B57 6z,904.d 0-0 844.4-
- 13. Reactor Re4 ne Shutdown llours
- 14. Ilours Gene ator On I.ine 627.6 1.311.7 60,816.8
- 15. Unit Resene shutdown llour, 0
0 121.8
- 16. Grms I hernul 1:nergy Generated (MWH) 1,365,136 2,871,431 124,289,343
- 17. Grow I lecirivl Eneigy (;cnerated (MWill 444,215 944,665 39, bub /ud
- 18. Net Electrical Energy Generated plWil) 423,085 899,881 37,487,433
- 19. Unit Seivire l'accor 93.4 92.6 b/.6 93.4 94.0 67.9
- 20. Unit Avilabit;ty Factor
- 21. Unit Capachy I actor (U3ing MDC Net!
97.5 98.4 64.7 22.' Unit Cap.ority I actor (thing DER Net) 90.9 91.7 60.3 i
6.6
/4 5.6-
- 23. Unit Fort e.! Outape Rate
- 24. Shutdown 4 Scheduled User Nest 6 Months ( type.Date.and Duration of Fachl:
i i
b
- 25. If Shut Down At Lnd Of Report Period. Estimated Date of Startup:
- 26. Unih in Test StatuslPsior to Commercial Operationt
_ Force:nt Achiesed i
INilIA L CRIIICA1.11 Y
}
INillTL LLI CIRICilY COMMI'RCI Al. OPER A IlON i
(9/77)
-wP UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNIT NAME Turkey Point 3
~
DATE March 15. 1983 REPORT MONTil February. 1983 COMPLETED BY P-Pace TELEPl!ONE (305) 552-3654 "i
-5*
=
en 3 so c
,.s '-;
Licensee 5t i,e Cause & Corrective
=
No.
Date g
3g j
,g 5
Event F?
Do Action to o
H j~
E jgg Report n
<E C j'
present Recurrence 6
2 830209 F
0 A
5 HC llTEXCH Power was reduced in accordance with chemistry guidelines due to in-creasing conductivity.
3 830209 F
44.4 A
1 HC HTEXCH The unit was removed from service to repair a condenser tube leak.
4 830211 F
0 H
5 EB XXXXXX Power was maintained at a reduced level to evaluate the effect or ad-ditional secondary loads on degraded grid voltage analyses.
I 2
3 4
F: Forced Reason:
Me: hod:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee 4
C-Refueling 3-Automatic Scram.
Esent Report (LER) File (NUREG-D-Regulatory Restriction CJ-Other (Explain) 01611 E-Operator Training & License Examination F-Adnumstratne p
5 G-Operational Error (Explain) 4- _ to e a nucer..d Exhibit I - Same Source (9/77)
Il-Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE 1
DOCKET NO.
50-250 i
UNIT Turkey Point 3 DATE March 15, 1983 ace COMPLETED BY TELEPHONE (305) 552-3654 d
REPORT 110 NTH
_ Februa ry, 1983 i
Unit 3 operated at essentially full power except during the period of February 9 - 11. One leaking condenser plug was plugged and other tubes were plugged as preventive maintenance.
Major safety related maintenance activities included:
A reactor excore instrument recorder was calibrated.
A charging oump was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
f l
e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-251 1
Turkey Point 4 j
UNIT DA1E _ March 15. 1983 COMPLETED itY P. Pace
-(305) 552-3654 TELEP110NE MONTil February. 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
-(MWe-Net) 1 I _e
~~~
2 g
3 g9 4
5
~~~
6 22 7
23 8
,24 9
~~-
25 10 gg g _.,
28 29 14 30 15 31 l
INSTRUCTIONS l
l On this funnai. tw the aserage daily unit power lesel in MWe Net for ca:h day in the reporting month. Compute to l
the nearest whnte egawatt.
i 19/77)
J 9
e
t 1
OPEllATING DATA REPORT 1
1 DOCKETNo.
50-251 DATE March 15, 1983 Pa CONIPLE TED ilY TEl.EPilONE - 08i)se552-3654l OPER A lING STA1llS
- 1. Unit N one:
Turkey Point 4 Notes Steam Generator
- 2. Itepartin; rcriod: _. february 1983 Repa'ir Program in progress.
i
- 3. Licemeil I hermal Power (N1Wt):
2200
- 4. Nameplate !!.iting (Grow SIWeI:
760 693
- 5. Design ilutrical Rating (Net SlWe):
l 680
- 6. blasimum Dependable Capacity (Gross SIWE):
646
- 7. Stasimum Degndahle Capacity (Net AlWe):
- 8. If Ch:mp heur in Capacity liatings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power t.cul ro which itestricted.lf Any (Net 31We):
- 10. Reamm i or Restrictions. lf Any:
t I
This 51onth Yr to Date Cumulatise j
- 11. Ilours la 11eporting Period 672 1416 83,449
- 12. Number of flours Iteactor Was Critical 0
0 59,855.3
- 13. Reactor I;esene Shutdown linun 0
0 lbb.b
- 14. Ilours Generator On.Line 0
0 57,896 0
0 31.2
- 15. Unit Itevne Shutdown !!,ours
- 16. Gross Thernul I nergy Generated (31Wil) 0 0
121,918,244
- 17. Gross Electrical Energy Generated plWil) 0
. 0 38,775,572 i
- 18. Net Electric.d Energy C.enerated plWH)
-897
-1973 36',730,622
- 19. Unit Senire I actor 0
0 69.4
- 20. Unit Asaitainhty raetor 0
0 69.4
- 21. Unit Capacity Factor IUsing SIDC Nc0 0
0 68.1 0
U b3.5
- 22. Unit Capae:ty Factor IUsing DER Net)
- 23. Unit Forced Outage Rate 0
0 3.9
- 24. Shutdowns Scheduled User Nest 6 MonthsIType.Date.and Duration of Each1:
- 25. If Shut Down At 1.nd Of neport Period Estimated Date of Startup:
April, 1983
- 26. Units in frst Status IPrior io Connnercial Operation):
Forecast Achieved INillA L CRI TICA til Y INI TI A L ELEC1 RICil Y CO\\l\\tFitCI A L OPER A IlON i
f i
+
07/77:
I
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-251 UNIT NAME Turkey Point 4 DATE
'S er h 14, 10A1 COMPLETED BY P-Para i
REPORT MONTil Fahrna rv _ 1983 TELEPHONE fansi ;;9_164a 3
=
ee
.'5 so 5"o Cause & Correctise
.2 e E
5.2 'A Licensee
.7,
-o
=
No.
Date g
g j
j5 Event
??
$.3 Act' ion to
~ 5 :g Report =
tR C E'
Prevent Recurrence
$5 5
u O
18 821009 S
E72 H
4 HB llTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.
J 1
i i
2 3
4 F: Forced Reason:
Method:
Exhibit G - histra,trans S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee J
C-Refueling 3-Automatic Scram.
Event Report (LERI File (NUREG-D Regulatory Restriction CJ.Other (Explain) 0161)
E4)perator Training & License Examination F-Administrative 9,
5 G-Operational Error (Explain) 4-Ao o ezscuc.,..d Exhibit I - Same Source (9/77) 11-01her (Explain)
SUMMARY
OF OPERATING EXPERIENCE i
DOCKET NO 50-251
)
UNIT Turkey Point 4 DATE March 15, 1983 ace COMPLETED BY (305) 552-3654 TELEP110NE
]
REPORT tiONTII Februa ry,1983 Unit 4 continued the Steam Generator Repair Program.
Other major safety related maintenance activities included:
Two Boric Acid heat tracing circuits were adjusted or repaired.
A 120-140 V DC Static Inverter was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are l
continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing? Refer to correspondence between FPL and NRC for additional i
informa tion.
I f
4
.i l
l I
e 1
i y
y m,
9
,,..,-.i
y
.._,_,-,,,__,,,c,
,-,,,..,--.-,y--
3 w-,
,y,-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St_ 1ucie 1 DA1E _ March 15, 1983 COMPLETED BY P. Pace TELEPilONE - (305) 552-3654 MONTil February, 1983 DAY AVER AGE D I PO ER LEVEL day AVER AGE DAILY POWER LEVEL
- (MWe-Neti I
841 841 1.,
2 840 841
,g 3
773 841' 39 4
831 840 840 838 5
6 840 835 22 839 833 7
3 8J2 831 8
9 842 830 5
841 726 10 11 839 37 12 840 g
841 13 29 843 I4 0
842 31 16 841 c
INSTRUCTIONS On this fonnie. Int the aser. ige daily unit power leselin MWe Nel for es:h d3F I" th* reporting :n.inth. Compute io l
ihe nearest wh<>!c tvpware, l
l (9/77)
(
4 OPEll AllNG DAT A ItEPOlti 50-335 llocKEr No.11arcn 15,1983 Dra g COMPl.EI ED llY P. Pace -
1 El.l?PilONE (3Ub) b52-3654 OPFit A I IN(. STA'I US St. Lucie 1 Notes Unit 1 operated at I " U"" b.""
FebTUap03 essentially full power until
- 2. Itepmting i,triod:
starting a refueling outage.
3.1.icenwd Ibconal Power (MWt):
9700 890
- 4. Nameplah Itating (Grow MWe):
- 5. Design I.lutricalItating(Net MWe):
l 830 862
- 6. Plasimino liependal.le Capacity (Grow MWe):
- 7. Masimum li pendalite Capacity (Net MWe):
817
- 8. If Changes Occur in Capacity Itatings (Items Number 3 Throu3h 7) Since I.ast iteport. Give Itcasons:
- 9. Pimer Leul l'o which Itestricted,1f Any (Net MWe):
- 10. Itcauens l'n, Itest:ictions,If Any:
This Month Yr..to Date Cumulalise II. Irours 1.i Ro.orting Period 672 1416 54,264 622.9 13bb.9 44,466.i
- 12. Number Of 81mirs Iteactor Was Critical
- 13. Iteactor itewne Simtdown ilour, 0
0 205.3
- 14. Ilours Geneotor On Line 622.2 1350.9 43,576.2
- 15. Unit itesen: Shutdow n llour, 0
0 39.3
- 16. Giou Thermd Fuergy Generated (MWil) 1,659,557 3,532,422 luu,00t,was i
- 17. Grow I'lettrical Energy Generated (MWill b46,89U 1,1bu,zuu 45,a73,675-
- 18. Net Electrical I.ncrgy Generated (MWill 518,439 1,099,537 33,363,728
- 19. Unit Seniac l' actor 92.6 65.4 80.3
- 20. Unit Asaihinhty factor 92.6 '
9b.4 uu.4
- 21. Unit Capadty I actor (Using MDC Net) 94.4 95.0 78'~$
- 22. Unit Cap aty Factor (Using DLit Net) 93.0 93.6 76.3
- 23. Unit l' ort ed Outage Itate 0
1.1 q,o
- 24. Shutdown.Sebeduled User Neu (, Months (lyPe.Datesmd Duration of BM
'l
- 25. If Shut On n At I.nd Of Report Period.1:stimated Date of Startup:
April 30, 1983
- 26. Unik in Teu Stalm (Prior to Conunerei.d Operationi:
Forecan wa INilIA L Citi1ICAlll'Y INi il A l.1.1.1.CT Ricli Y CO\\l\\ll 1(CI Al. OPER A1 ION (9/77i
50-335 UNITS!!UTDOWNS ANDPOWER REDUCTIONS DOCKET NO.
- x. Lucie i UNIT NAME DATE March 15, 1963 COMPLETED BY P. Pace REPORT MONTit Febru a rv. 1983 TELEPilONE (305) 552-3654 e.
E 5 ?
3
^$5 Licensee
,E-r, je, Cause & Correctise No.
Date i
~g 5
1~$
Esent
~?
g3 Action to f:
jgg Report :
mR L
Prevent Recurrence H
g 6
3 830226 S
49.8 C
1 RC FUELXX Unit I was removed from service for refueling and scheduled maintenance.
t I
2 3
4 F: Forced Reason:
W:.tod:
Ex1uba G - 1. truenms S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Ect > Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G Operational Error (Explain) c_ 4eao e st;,w.,..cl Exhibit I - Same Source (9/77) 11-01her (Explain)
r
SUMMARY
OF OPERATING EXPERIENCE C
DOCKET NO.
50-335 UNIT St. Lucie Unit 1 DATE March 15, 1983 COMPLETED BY P. Pace TEI,EPHONE (305) 552-3654 REPORT 110 NTH Februar.y, 1983 St. Lucie Unit I was removed from s'ervice on February 26, 1983, for a re-fueling and maintenance outage.
Other major safety related maintenance included:
Two containment spray valves were repaired.
A liigh Pressure Safety Injection Pump mechanical seal was replaced.
A Low Pressure Safety Injection Pump mechanical seal was replaced.
A charging pump accumulator was replaced, s
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Comapny commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional in formation.
In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.
.