ML20073E690

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1983
ML20073E690
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/03/1983
From: Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20073E695 List:
References
NUDOCS 8304150279
Download: ML20073E690 (2)


Text

j 1

PACIFIC OAS AND E LE C T RI C C O M PANY DIABLO CANYON POWER PLANT 3p g g i

3 PO. Box 56 Avila Beach, California 93424 *(805) 595-7351 R.C. THORNBERRY PLANT MANAGER tiarch 3,1983 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:

Docket No. 50-275 License No. DPR-76 fionthly Operating Report for February, 1983 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for February 1983. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.

Sincerely, ee7 W R. C. THORNBERRY RCT:1rh Enclosures cc: Mr. R. H. Engelken Office of Inspection and Enforcement Region V - USNRC 9 974 8304150279 830303 PDR ADOCK 0500027 R

1

MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE 1

This report describes the operating and major maintenance experience for the month of February 1983. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is no significant operating experience or major safety related.

maintenance to report.

No challenges to the PORV's or safety valves have been made.

Furthermore, no changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

3 4

L