Forwards Record of 830322 Telcon Between Teledyne,Util & S&W Re Clarification of Review Item ICR 5633-10 Re Anchor Darling Valves.S&W Documentation Will Be Inspected
ML20073C886
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/07/1983
From: King J
TELEDYNE ENGINEERING SERVICES
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20073C874 List:
References
5633-58, NUDOCS 8304130333
Download: ML20073C886 (2)


Text

' '

"RTELEDYNE ENGINEERING SEFNICES 133 SECOND AVENUE W ALTH AM. MASSACHUSETTS 02254 4617) 890-3350 T4x (710i 324-7580 April 7, 1983 5633-58 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20114

Subject:

Independent Design Review for the Shoreham Nuclear Power Station

Reference:

TES Letter No. 5633-43 to the USNRC dated February 11, 1983

Dear Mr. Denton:

In accordance with the procedures defined in the referenced letter we are forwarding a r. :ord of the telephone conference call of March 22, 1983 between Teledyne Engineering Services, LILC0 and SWEC personnel.

The purpose of this call was for clarification of TES review item ICR No. 5633-10, classified as Additional Concerns.

If you have any questions or comments, please do not hesitate to contact Mr. Donald F. Landers or the writer.

Very truly yours, TELEDYNE ENGINEERING SERVICES Assis

% 9M>

James P. King t Project Manager JPK/lh Attachment cc: D. F. Landers (TES)

J. A. Flaherty (TES)

J. H. Malonson (TES)

TES Document Control 8304130333 830407 PDR ADOCK 05000322 A PDR ENGINEERS AND METALLURGISTS

'A'F WNE ENGINEERING SERVICES TELEPHONE CALL RECORD TES Project No. 5633 Independent Design Review for Shoreham Nuclear Power Station Conference Call: March 22, 1983 Initiated Call: LILC0: E. Montgomery SWEC: R. Foley, R. Hankinson, R. Obadiahk, J. Spazuko Received Call: TES: D. Landers, J. Flaherty, J. Tsacoyeanes, J. King, W. McBrine, L. Barron Summary of Telecon Purpose of call was for clarification of TES review item ICR No.

5633-10, issued on March 15, 1983, and classified as Additional Concerns.

LILC0/SWEC personnel questioned the need for TES to look at the requested additional SWEC valve review documentation. TES reiterated the reason is to insure the adequacy of the design process, that the original SWEC valve review omission was an isolated case, and not a result of applicable SWEC valve review procedures.

It was agreed that TES reviewers J. Tsacoyeanes and W. McBrine would visit SWEC the following day and look at the following documentation:

SWEC procedure EMTP 8.22, SWEC review of valve manufacturers reports other than Anchor-Darling, and the SWEC review forms (Attachment 4.2 of EAP 9.2) for the six Anchor-Darling valves listed in ICR No. 5633-10.

JPK/lh