Forwards Final Classification of Independent Design Review Item ICR 5633-10 Re Anchor Darling 10-inch Globe Valves. Results of Review of Util Responses Encl
ML20073C869
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/07/1983
From: Landers D
TELEDYNE ENGINEERING SERVICES
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20073C874 List:
References
5633-62, NUDOCS 8304130330
Download: ML20073C869 (5)


Text

r .

.- 'RTELEDYNE ENGNEERING SEFMCES 130 SECOND AVENUE W ALTH AM. M ASSACHUSE TTS 02254

  1. 6? 7) 83}3350 TWX (710) 324-7580 April 7, 1983 5633-62

$(6-392 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20114

Subject:

Independent Design Review for the Shoreham Nuclear Power Station

Dear Mr. Denton:

Please find enclosed the final classification of ICR No. 5633-10 from the subject design review.

TES has received responses from LILC0 to this item originally classified as a Finding and the results of our review of this response is enclosed.

If you have any questions or conments, please do not hesitate to contact Mr. James P. King or the writer.

Very truly yours, TELEDYNE ENGINEERING SERVICES Y*' S Donald F. Landers Senior Vice-President DFL/lh Enclosures cc: J. A. Flaherty (TES)

J. P. King (TES)

J. H. Malonson (TES)

TES Document Control 8304130330 830407 PDR ADOCK 05000322 A PDR ENGINEERS AND METALLURGISTS

{X] Transmittal - Please Sign and Return Acknowledgement TN Request for Information (RFI)

When Requested Assign Control Number Pagedof I O Receipt (TES Use Only) Control No.

()ciginator D. F. Landers Transmit To: H. R. Denton Project No. 5633 USNRC Date 4/7/83 7920 Norfolk Ave.

Client PO 363981 Bethesda, MD 20112 Transinitted t 'oder Separate Cover To: M. 1111119an (LILCO)

NOTE: Furnish complete identification for iteins transmitted (below).

O O

OTY IYPE ITEM IDENT NO. REV DF SCRIPTION - Titla and Number of Sheets /Paqos 6 ICR-5633-10 1 ACKNOWLEDGEMENT OF RECf IPT I Y TITLE - DATE UlSPOSITION FOR PREVIOUS REVISIONS O Return to TES O Mark Void Docctroy O L'ncontrolled

_N._ O._.T._E. .T..O.A_D.DR.E.S_SE_E. : Unless stated otherwise the listed items are furnished to you as Controlled p

TELEDYNE ENGINEERING SERVICES 130 Second Avenue Waltham, Massachusetts 02254 At tent ion: Document Control, Project 5633

!)lS TRil3U TION: I anel 2-Addressee 3-Document Control 4-Originator / Project Manager 4/01

'st'TF1 FDYNE ENGINEERING SERVICES l l

TELEDYfJE ENGINEERING SERWCES INDEPENDENT DESIGN REVIEW CONTROL 1.ED DOCUMENT

'"~ 01)

SHDREHAM NUCLEAR POWER STATION DATE 4 . '7 ,9 3 ICR NO.

5633-10 Rev. 1

Reference:

RRF No. 5633- 27 Date: 4/6/83 PMR No. 5633- 27 Final Classification of Item: Closed

% Wy- 1J Reviewer Sign re 0 ::

Ccmmittee Chairman Signatur 3.F mamAu Project Manager Signature l

j _

1eTri prT/NE ICR No. 5633-10, Rev. 1 1.0 St# NARY Referenced Documents:

(1) TES ICR No. 5633-10 (March 15, 1983)

(2). TES Trip Report No. 1683 (March 22, 1983) i (3) SWEC EMTP d.22-0, Engineering Mechanics Seismic Report Standard Review Procedure During the original review of the seismic analysis report for Anchor Darling 10" Globe Valve, IE21 M0V-035, the TES reviewer noted that:

(1) Cantilever bending mode not computed (2) Some Class 1 allcwables were used in the evaluation for the

, Class 2 valve (3) Yoke section properties calculations contained mathematical errors LILC0/SWEC in their response stated that:

(1) Vendor technical documents are checked and reviewed for compliance with applicable specifications and documents and the results of the review are reported on a SWEC form delineating additions and corrections required for approvals.

(2) The cantilever mode was computed by SWEC for all 27 Category I valves supplied by vendor. The results of this analysis show all frequencies were above the minimum of 33 Hz.

(3) Vendor used Class 2 allowables for yoke and based non-code bolt material (A574) allowable values on Code procedures (1/4 Su).

i 1

SPTF1 FnYNE ENGINEERING SERVICES ICR No. 5633-10, Rev. 1 ,

2.0 RESOLUTION The Reference (1) disposition raised questions relative to SWEC procedures establishing review methods of vendor calculations and implementation of those procedures relative to Shoreham, and requested certain documents be made available for further TES review.

The Reference (3) procedure provides general guidelines to the SWEC reviewer of vendor seismic qualification reports. A checklist (Form 5040.51B) provides broad guidance for items to be checked, such as, consistency with specification requirements, appropriateness of analytical techniques, assumptions, etc. More specific review aspects are determined by the reviewer whose assignment is based on SWEC internal assessment of the reviewers qualifications.

The Reference (2) trip report documents the purpose and scope of the subsequent TES review and summarizes the information obtained. The review seeked to establish whether the " apparent" omission of the cantilever mode frequency check by the SWEC reviewer was indicative of an inherent deficiency in the SWEC design process as applied to Shoreham, which may have directly caused or contributed to the omission.

This subsequent review indicated that such a deficiency does not exist.

TES considers the Reference (3) approach to be sufficient for general application in the design process and not a direct cause of the original finding. However, the circumstances would indicate that an oversight in the specific review aspects occurred by failure to consider and/or record the lower cantilever mode frequency. The significance of this oversight has been assessed in Reference (1) to the satisfaction of TES and this item should be closed.

i f er -