|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 ML20195G3721999-06-0707 June 1999 Informs That Proposed Indicators Failed QA Assessments for Digital Verification,Validation & Control of Software. Proposed Mod Can Be Completed on-line ML20195B5021999-05-27027 May 1999 Provides Suppl Info to 990203 Request of Beco That NRC Consent to Indirect Transfer of Control of Util Interest in License DPR-35.Request Described Proposed Merger of Bec Energy with Commonwealth Energy Sys ML20207D4681999-05-24024 May 1999 Provides Addl Info to That Included in Beco Ltr 98-123 Dtd 981001,addressing NRC Concerns Described in GL 96-06, Concerning Waterhammer in Reactor Bldg Closed Cooling Water Sys ML20195B9051999-05-20020 May 1999 Forwards Completed Renewal Applications for Listed Operators.Without Encls ML20206J4901999-05-0606 May 1999 Forwards Completed License Renewal Application,Including Forms NRC-398 & 396 for Sc Power,License OP-6328-3 ML20206P0711999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, for K Walz,License SOP-10886-1.Encl Withheld IAW 10CFR2.790(a)(6) ML20206D3621999-04-27027 April 1999 Informs NRC That Final Five Sys self-assessments Required to Fulfill Commitment Made in 980828 Response to Insp Rept 50-293/98-04 Were Completed on 990422.Completion Was Delayed by High Priority Refueling Outage 12 Preparatory Work ML20205R9871999-04-21021 April 1999 Forwards Affidavit of JW Yelverton of Entergy Nuclear Generation Co Supporting Request for Withholding Info from Rept on Audit of Financial Statements for Year Ended 971231. Pages 16 & 18 of Subj Rept Also Encl ML20207B0891999-04-20020 April 1999 Forwards e-mail Message from Constituent,J Riell Re Y2K Compliance of Nuclear Power Plant in Plymouth,Massachusetts. Copy of Article Entitled Nuke Plants May Not Be Y2K Ready Also Encl ML20205P9271999-04-16016 April 1999 Withdraws Motion for Leave to Intervene & Petition for Summary Or,In Alternative,For Hearing.Requests That NRC Adopt Condition of Approval of Transfer of License & License Condition Agreed to Beco & Entergy Nuclear Generation Co ML20206A2741999-04-16016 April 1999 Dockets Encl Ltr Which Was Sent to AL Vietti-Cook Re Condition of Approval of Transfer of License & License Condition for DPR-35.Encl Resolves Issues Between Attorney General of Commonwealth of Massachusetts & Applicants ML20205P9131999-04-16016 April 1999 Submits Applicant Consent to Listed Condition of Approval of Transfer of License & License Condition for License DPR-35 & Affirmatively Request That NRC Adopt Listed Language in Order ML20205Q9231999-04-15015 April 1999 Forwards Proprietary & non-proprietary Addl Info in Support of Request to Transfer of Plant FOL & Matls License to Entergy Nuclear Generation Co.Proprietary Info Withheld,Per 10CFR2.790 ML20205P9631999-04-15015 April 1999 Provides Attachments a & B in Support of Request for Transfer of Plant Operating License & NRC Matl License from Beco to Entergy Nuclear Generation Co as Submitted in Ref 1. Info Provided in Response to Request at 990413 Meeting ML20205H9281999-04-0707 April 1999 Requests Withdrawal of Uwua Locals 369 & 387 Unions Joint Intervention in Listed Matter ML20205F3731999-04-0202 April 1999 Submits Addl Info Provided in Support of Request for Transfer of Pilgrim Nuclear Power Station Operating License & Matls License.State of Ma Order Authorizing Divestiture & Copy of Financial Arrangement Encl ML20204H3771999-03-26026 March 1999 Informs That Local 387,Utility Workers Union of America,AFL- Cio Voted to Approve New Contract with Entergy Nuclear Generation Co & Voted to Accept Boston Edison Divestiture Agreement ML20205D4231999-03-24024 March 1999 Forwards Decommissioning Funding Rept for Pilgrim Nuclear Power Station,In Accordance with 10CFR50.75(f)(1) 1999-09-09
[Table view] |
Text
.
1 a
G Boston Edison Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 E. T. Boulette, PhD senior Vice President-Nuclear BECo Ltr. #94-104 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Inservice Inspection Plan for Pilarim Station's 1994 Mid-Cycle Outaae in accordance with ASME Section XI, Winter 1980 Agenda, Article IWA-1400(c), Boston Edison Company submits the Inservice Inspection (ISI) Plan for the 1994 Mid-Cycle Outage (MCO10).
The ISI examinations listed in the enclosed plan are scheduled as part of the third period of the Pilgrim Nuclear Power Station Second Ten Year Inspection Interval. Code required examinations to be performed during MCO 10 include nondestructive and visual examinations on safety-related piping welds, attachments, bolting and pipe supports.
In addition, augmented ISI examinations scheduled for MCO 10 include the following:
9 exams for the detection of intergranular stress corrosion cracking (IGSCC) in accordance e
with NRC Generic Letter 88-01.
Ultrasonic and visual examination of Salt Service Water piping in accordance with BECo e
specification M-591, including a pipe crawler visual inspection of buried "B" loop discharge pipe.
h hdLN E. T. Boulette, PhD ETB/GGW/ Rap 94/nas/94lSI
' inclosure A: ISI Plan for PNPS 1994 Mid-Cycle Outage #10 cc: See next page e c. o 9409230157 940914 PDR ADOCK 05000293 pg' J
D PDR g
g i
I cc:
Mr. R. Eaton, Project Manager Divi' ion of Reactor Projects - 1/II s
Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 i
U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road i
King of Prussia, PA 19406 j
Senior Resident inspector Pilgrim Nuclear Power Station Mr. John McCabe -
Acting Manager of Engineering Department of Public Safety 1 Ashburton Place Room 1301 Boston, MA 02108 Mr. V. lyer Authorized Nuclear Inservice Inspector PNPS Factory Mutual Engineering Mr. Kevin McTague Authorized Nuclear inservice Inspection Supervisor (anils)
Boston District Office 1151 Boston-Providence Turnpike Norwood, MA 02062 I
ENCLOSURE (A)
INSERVICE INSPECTION PLAN FOR PNPS 1994 MID CYCLE OUTAGE # 10 COMPONENT DESCRIPTION CODE ITEM SYSTEM EXAM ON LINE.
6-A-6HL1(4)
SUPPORT LUG B10.10 FW MT N
6-N4A-5HL1(4)
SUPPORT LUG B10.10 FW MT N
6-N48-5HL1(4)
SUPPORT LUG B10.10 FW MT N
1-B-8HL2(8)
SUPPORT LUG B10.10 MS MT N
1-C-4HL1(4)
SUPPORT LUG B10.10 MS MT N
1-D-4HLi(4)
SUPPORT LUG B10.10 MS MT N
14-A-5 ELBOW TO PIPE B9.11 CS MT UT N
14-A-7 ELBOW TO PIPE B9.11 CS MT UT N
14-B-10 PIPE TO ELBOW B9.11 CS MT UT N
14-8-5 ELBOW TO PIPE-89.11 CS MT UT N
14-8-7 ELBOW TO PIPE B9.11 CS MT UT N
14R-B-16 PENETRATION TO ELB.
89.11 CS UT N
14R-B-21 A PIPE TO PIPE B9.11 CS UT N
1-D-14 VALVE TO PIPE 89.11 MS MT UT N
1-D-15 FLUED HEAD TO PIPE 89.11 MS MT UT N
10R-IB-1 PIPE TO TEE 89.11 RHR PT UT N
10R-IB-2 ELBOW TO PIPE B9.11 RHR PT UT N
10R-IB-3 PlPE TO ELBOW 89.11 RHR PT UT N
GB-14-22HL1(4)
SUPPORT LUGS C3.40 CS MT Y
DB-23-51HL1(4)
SUPPORT LUGS C3.40 HPCI MT Y
GB-10-19HL1(4)
SUPPORT LUGS C3.40 RHR MT Y
3-WSD-17 PIPE TO PIPE C5.11 CRD MT Y
3-WSD-21 PIPE TO REDUCER ELB.
C5.11 CRD MT Y
GB-141-1C ELBOW TO PIPE C5.11 CS MT Y
GB-14-1-1 D PIPE TO ELBOW C5.11 CS MT Y
GB-14-3-4D PIPE TO WELDOLET C5.11 CS MT Y
GB-14-3-4E REDUCER TO PIPE C5.11 CS MT Y
GB-14-F2 ELBOW TO PIPE C5.11 CS MT Y
GB-14-F34 PIPE TO VALVE C5.11 CS MT Y
GB-14-F38 VALVE TO PIPE C5.11 CS MT Y
GB-14-F39 PIPE TO VALVE C5.11 CS MT Y
GB-14-F3A PIPE TO PIPE C5.11 -
CS MT Y
HD-14-2-1 G PIPE TO FLANGE C5.11 CS MT Y
HL-14-F11 PIPE TO VALVE C5.11 CS MT Y
l GB-10-9-4A-B ELBOW TO PIPE C5.11 RH,R MT Y
GB-10-9-4C-C
- PIPE TO ELBOW C5.11 RHM MT Y
GB-10-10-2C TEE TO ELBOW C5.11 RHR MT N
GB-10-10-2E TEE TO PIPE C5.11 RHR MT N
GB-10-12-2D WELDOLET TO P!PE C5.11 RHR MT Y
GB-10-2-1 A-D ELBOW TO ELBOW C5.11 RHR MT N
GB-10-F29 ELBOW TO PIPE C5.11 RHR MT N
Page1
l COMPONENT DESCRIPTION CODE ITEM SYSTEM EXAM ON LINEl GB-10-F30 ELBOW TO PIPE _
C5.11 RHR MT N
1 GB-10-F32 ELBOW TO PIPE C5.11 RHR MT N
GB-10-F59A PIPE TO VALVE C5.11 RHR MT N
GL-10-F61 VALVE TO WELDOLET C5.11 RHR MT N
HL-10-1-1B ELBOW TO PIPE C5.11 RHR MT Y
DB/DC-14-3001-4-1 PIPE TO PlPE C5.21 CS UT N
H-3-1-15 RIGID SUPPORT F(1-3)
CRD VT-3 Y
H-3-1-16 RIGID SUPPORT F(1-3)
CRD VT-3 Y
H-3-1-17 RIGID SUPPORT F(1-3)
CRD VT-3 Y
H-3-1-29 STRUT F(1-3)
CRD VT-3 Y
H-3-1-30 RESTRAINT F(1-3)
CRD VT-3 Y
H-3-1-41 STRUT F(1-3)
CRD VT-3 Y
l H-3-1-47 RESTRAINT F(1-3)
CRD VT-3 Y
H-14-1-33 RIGID HANGER F(1-3)
CS VT-3 Y
H-14-1-55 RIGID HANGER F(1-3)
CS VT-3 Y
H-14-1-9 RIGID HANGER F(1-3)
CS VT-3 Y
H-23-1-28S RIGID HANGER F(1-3)
HPCI VT-3 N
f H-23-1-7 RIGID HANGER F(1-3)
HPCI VT-3 N
H-23-1-16 RIGID HANGER F(1-3)
HPCI VT-3 Y
H-23-1-17 RIGID HANGER F(1-3)
HPCI VT-3 Y'
f H-26-1-135 RIGID HANGER F(1-3)
HPCI VT-3 N
H-23-1-3 RIGlD HANGER F(1-3)
HPCI VT Y l
H-1-1-23 RIGID HANGER F(1-3)
MS VT-3 N
H-1-1-37 RIGID HANGER F(1 3)
MS VT-3 N
H-30-1-32SH RIGID HANGER F(1-3)
RBCCW VT-3 Y
H-30-1-33SR RIGID HANGER F(1-3)
RBCCW VT-3 Y
H-30-1-53 RIGlD HANGER F(1-3)
RBCCW VT-3 N
H-30-1-54 RIGID HANGER F(1-3)
RBCCW VT-3 N
t H 30-1-58 RIGID HANGER F(1-3)
RBCCW VT-3 Y
l i
H-26-1-1 RIGID HANGER F(1-3)
RCIC VT Y H-26-1 2 GUlDE F(1-3)
RCIC VT-3 Y
.f H-26-1-3 RIGID HANGER F(1-3)
RCIC VT-3 Y
H-26-1-4 GUIDE F(1-3)
RCIC VT-3 Y
H-26-1-5 GUIDE F(1-3)
RCIC VT-3 Y
H-26-1-6 GUIDE F(1-3)
RClO VT-3 Y
l H-10-1-56 RIGID SUPPORT F(1-3)
RHR VT-3 Y
H-10-1-SG17 LATERAL RESTRAINT F(13)
RHR VT-3 Y
H-10-1-30SR LATERAL RESTRAINT F(1-3)
RHR VT-3 Y
.[
H-10-1-55 RIGID SUPPORT F(1-3)
RHR VT-3 Y
H-10-1-99S LATERAL RESTRAINT F(1-3)
RHR VT-3 Y
H-10-1-108S LATERAL RESTRAINT F(1-3)
RHR VT-3 N
H-10-1-107S RIGID HANGER F(1-3)
RHR VT-3 N
H 10-1-11 RIGID HANGER F(1-3)
RHR VT-3 N
l l
l t
Page 2
7 i
j
~COMPONENT
- DESCRIPTION CODE ITEM SYSTEM EXAM ON LINE H-10-1-105S LATERAL RESTRAINT F(1-3)
RHR VT-3 N
H-29-1-15 RIGID HANGER F(1-3)
SSW VT-3 N
H-29-1-21 RIGID HANGER F(1-3)
SSW VT-3 N
H-29-1-24 RIGID HANGER F(1-3)
SSW VT-3 N-H-6-1-101 SPRING HANGER F(1-4)
FW VT-3/4 N
H-6-1-105 SPRING HANGER F(1-4)
FW VT-3/4 N
H-6-1-107 SPRING HANGER F(1-4)
FW VT-3/4 N-H-6-1-SS-1 SNUBBER F(1-4)
FW VT-3/4 N
H-6-1-SS-7 SNUBBER F(1-4)
FW VT-3/4 N
H-6-1-SS-9 SNUBBER F(1-4)
FW VT-3/4
-N H-23-1-11 SPRING HANGER F(1-4)
HPCI VT-3/4 N
H-23-1-6 SPRING HANGER F(1-4)
HPCI VT-3/4 N
H-23-1-8 SPRING HANGER F(1-4)
HPCI VT-3/4 N
l H-23-1-9 SPRING HANGER F(1-4)
HPCI VT-3/4 N
H-23-1-15SS SNUBBER F(1-4)
HPCI VT-3/4 N
H-1-1-HA4 SPRING HANGER F(1-4)
MS VT-3/4 N
H-1-1-HC1 SPRING HANGER F(1-4)
MS VT-3/4 N
H-1-1-HC3 SPRING HANGER F(1-4)
MS VT-3/4 N
I H-1-1 HD1 SPRING HANGER F(1-4)
MS VT-3/4 N
H-1-1-HD4 SPRING HANGER F(1-4)
MS VT-3/4 N
H-1-1-SA2 SNUBBER F(1-4)
MS VT-3/4 N
H-1-1 SB1 SNUBBER F(1-4)
MS VT-3/4 N
i H-1-1-SB2 SNUBBER F(1-4)
MS VT-3/4 N
E
{
H-30-1-104 RIGID HANGER F(1-4)
RBCCW VT-3 Y
H-30-1-46 RIGID HANGER F(1-4)
RBCCW VT-3 Y
H-10-1-170 SPRING HANGER F(1-4)
RHR VT-3/4 N
H-10-1-172 SPRING HANGER F(1-4)
RHR VT-3/4 N
H-10-1-92S SPRING HANGER F(1-4)
RHR VT-3/4 Y
i H-10-1-12 SPRING HANGER F(1-4)
RHR VT-3/4 N
H-10-1-18 SPRING HANGER F(1-4)
RHR VT-3/4 N
j i
H-10-1-LT1 SPRING HANGER F(1-4)
RHR VT-3/4 N
l l H-10-1-LT2 SPRING HANGER F(1-4)
RHR VT-3/4 N
j RAP /ref i
i I
i I
i Page 3
.