Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
I l t I l
l
. \
DPERATIN6 DATA REFORT I DOCKET NO 50-413 j DATE Se:tember 15, 1994 P.A. Williees CPERATING STATUS COMPLETED BY TELEPHONE 704-382-5346
- 1. Unit Nase: Catauta 1 l
- 2. Reperting Period: August 1,1994-August 31,1994
- 3. Licensed Thersal Power (MWt): 3411
- 4. Nameplate Rating (Brass MWe): 1305* Notes # Nameplate Rating
- 5. Design Electrical Rating (Net MWe): 1145 (Bross MWe) calculated as j 6. Haxists Dependable Capacity (Stoss MWe): 1192 1450.000 MVA x .90 power i ?. Maxisus Dependable Capacity (Net MWel: !!29 factor per Page lii, ;
- 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURES-0020. i Repert. Give Reasons:
I l
- 9. Fcwer Level To Which Restricted, If Any (Net MWel:
- 10. Reason For Restricticas, If any:
l l
This Month Yr.-to-Date Cusulative
!!. Heurs In Reporting Period 744.0 5831.0 80424.0
- 12. Nusber Of Heurs Reactor Was Critical 744.0 5804.6 61582.6
- 13. Reacter Reserve Shutdown Heurs --0-- --0-- --0--
l 14. Heurs Generater On-Line 744.0 5793.1 60446.5
- 15. Unit Reserve Shutcown Heurs --0-- --0-- --0--
- 16. Stoss Thereal Energy Generated (MWH) 2493673 19179943 196422379
- 17. Gross Electrical Energy Generated IMWH) 825091 6834255 69198390 IB Net Electrical Energy Secerated (MWH) 63EB77 6474264 65018993
- 19. Unit Service factor 100.0 99.3 75.2
- 20. Unit Availability factor 100.0 99.3 75.2
- 21. Unit Capacity Fatter (Using MEC Neti 99.9 98.3 71.3
- 22. Unit Capacity factor (Using DER Net) 90.5 97.0 70.6 c3 ll nit Forced Outage Rate 0.0 0.6 9.4
- 24. Stutdown Echeduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - February 07, 1995 - 61 days
- 25. If Shut Down At End Of Report Period. Estieated Date of Startup:
l 26. Units in Test Status (Prict to Cossercial Operation): Forecast Achieved INITIAL CRITICALITY Ih!TIAL ELECTRICITY COMERCIAL OFERATION 9409230147 9409.t5 PDR ADOCK 05000413 R P DR, ,
I l
OPERATINS DATA REPORT DOCKET NO 50-413 UNIT Cata ba 1 DATE 5eptesber 15. 1994 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 l
i MONTH Acoust,1994 ;
j DE AVEEA6E DAILY PDWER LEVEL If AVERASE DAILY P0iiER LEVEL-(MWe-hett (MWe-Net) )
)
i !!27 17 1128 l l
i 2 1125 18 1127 l
l 3 1093 19 1133
! 4 1123 20 1131 5 1124 21 1131 6 1130 22 1135 l
7 1132 23 1136 1 l
E 1132 24 1135 I
9 !!30 25 1135 10 1127 26 1100 11 1126 27 !!32 12 1128 28 1133 ,
13 1129 29 1132 14 !!25 30 1130 15 1129 31 1125 16 1130
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-413 UNIT NAME carant5a 1 - -
DATE us/13/
REPORT MONTH August 1994 COMPLETED BY x. a. liiams TELEPHONE trueJ-JUZ-DJ4b (1) 2) g_ (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYE CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 6-P 94 3 F --
A --
EB TRANSF PARTIAL LOSS OF COOLING TOWER FANS RESULTING FROM LOSS OF LOAD CENTER 1HTA (1) (2) (3) (4)
F Forced S Scheduled Reason- Method:
1-Manual Exhibit G - Instructions for Preparation of, Data A-Equipment FailureB-Maintenance or test (Explain)
C-Refueling 2-Manual Scram 3-Automatic Scram Entry Sheets For Licensee Event Report (LER D-Regulatory Restriction , , 4-Other (Explain) File (NMEG-0161) )
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) e__-____-_________--_--_-_-. _-__ _____-_. .- . .- - _ - . - -_ _. ._ __ _ __ - _ _ _ _ __ _ ______ - _ -
I 5
?
i DOCKET: 50-413 !
UNIT: Catawba 1-Date:- 09/15/94
?
1&RRATIVE
SUMMARY
10tmi: August 1994 Catawba Unit 1 began the month of August operating at 100% full power. The unit .
u .iirax:mi decreasing power on 08/03/94 at' 1120 and held at 80% power- frm 1245 to l 1352 due to partial loss of cooling tower fans resulting fr m loss of load center .
1HIA. The unit returned to 100% full power on 08/03/94 at 1806 and operated at or !
l near 100% full power the remainder of the month. ' ;
l 7
l e
i e
e 1
i l
Prepared by: R. A. Williams Telephone: (704)-382-5346 l
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: February 1995
- 3. Scheduled restart following refueling: April 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
i
- 7. Number of Fuel assemblies (a) in the core: 121 l (b) in the spent fuel pool: 4Hi
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: September 15, 1994 Name of
Contact:
R. A. Williams Phone: (7041-382-5346
)
1 l
l DPERATlh5 DATA REPORT l
l
, DOCKET NO 50-414 i
DATE Sectember 15,1994 CPERAT!NG STATUS COMPLETED BY R.A. Willians i TELEPHONE 704-382-5346
- 1. linit hane: Catawba 2 I
- 2. Reporting Feriod: August 1, 1994-August 31,1994 )
- 3. L: ceased Thermal Poner (MWt): 3411 l
- 4. Naaeplate Rating (Bross M e): 1305* Notes
- 5. Design Electrical Rating (Net Me): 1145 (Bress MWe) calculated as
- 6. Maxiscs Dependable Capacity (Stoss MWel: !!92 1450.000 MVA x .90 power
- 7. Maximus Dependable Capacity (Net MWe): !!29 factor per Page iii, j B. If Changes Occur in Capacity Ratings (Itees N uber 3 Through 7) Since Last NUREG-0020. l Report. Give Reasons:
- 9. Fower Level To Which Restricted, if Any (Net MWel:
- 10. Reason For Restrictions, If any:
l This Month Yr.-to-Date Cusulative l
t l 11. Hours In Reporting Period 744.0 5831.0 70440.0
!!. Number Of Hours Reacter Was Critical 717.7 4241.9 54182.8
- 13. Reactor Reserve Shutdown Hours -+- --0-- --0--
- 14. Hours Senerator On-Line 717.5 4165.2 53244.7
- 15. Unit Reserve Shutdcun Hours --0-- --0-- --0--
- 16. Gross Thersal Energy Generated (MWH) 2437430 13403393 170292432
- 17. Gross Electrical Energy Generated (MWH) 860531 4771037 60348296 j
- 12. Net Electrical Energy Generated OfWH) 916377 4497997 56758054
- 19. U::it Service factor 96.4 71.4 75.6
- 20. Unit Availability Factor 96.4 71.4 75.6
- 21. Unit Capacity Facter (Using MDC Net) 97.2 68.3 71.2
- 22. Unit Capacity Factor (Using DER Net) 95.8 67.4 70.4
- 23. Unit Fcrced Outage Rate 3.6 2.0 9.1
- 24. Shutdown Schedcled Dyer Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Dcwn At End Of Report Feriod. Estimated Date of Startup: September 01, 1994 l
- 26. Units In Test Status (Prior to Costercial Operation): Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY CCMNERCIAL 0FERATION
. l l
l OPERATINS DATA REPORT l I
DOCKET ND 50-414 UNIT Catawba 2 DATE Septeeber 15, 1994 .
COMPLETED BY R.A. Williaes TELEPHONE 704-392-5346 l
t 90 NTH Aucust. 1994 1
E D AVERASE DAILY POWER LEVEL EAl AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) I i
1 1143 17 1138 )
l 2 1142 18 !!41 j 3 1099 19 1144 ,
1 4 1135 20 1142 i
5 1139 1140 l 21 6 1146 22 1146 7 1147 23 1145 8 1146 24 1144 9 1132 25 1144 10 !!39 26 1141 -
l 11 1139 27 1141 l
! 12 1139 28 1142 13 !!39 29 1139 14 !!36 30 1015 15 1140 31 0 l
16 1142 I
l i
. ~.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME varanna z -
DATE u9/13/94___
REPORT MONTH August 1994 COMPLETED BY M. a. w1111ams TELEPHONE truej-asz-oJen (1) 2) g_ (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO i
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 17-P 94 3 F --
A --
EB TRANSF PARTIAL LOSS OF COOLING TOWER FANS RESULTING FROM LOSS OF LOAD CENTER 1HTA 18-P 94 3 S --
B --
HB VALVEX TURBINE CONTROL' VALVE MOVEMENT TEST 6 94- 8-30 F 26.48 A 3 EB XXXXXX REACTOR TRIP DUE TO SLIDING i INCORRECT LINK ,
l 1
(1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment B-Maintenance Failure or test (Explain) 1-Manual for Preparation of, Data C-Refueling 2-Manual Scram Entry Sneets For Licensee Event Report (LER 3-Automatic Scram D-Regulatory R9striction , 4-Other (Explain) File (NWEG-0161) )
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
L
_________m_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . - -
- _ _.___-s. _
, s l
DOCKEf: 50-414 ;
I UNIT: Catawba 2 Date: 09/15/94 )
i NAl<RATIVE
SUMMARY
IONIH: August-1994 i Catawba Unit 2 began the month of August operating at 100% full power. %e unit m ua2d decreasing power on 08/03/94 at'1120 and held at 76% power frun 1249 to 1352 due to partial loss of cooling tower fans resulting from loss of load center
! IlffA. 'Ihe held at 90% power from 1442 to 1504 for. control valve movement test (test was not performed). 'Ihe unit returned to 100% full power on 08/03/94 at 1833. _ 'Ihe unit experienced an autanatic reactor trip due to sliding incorrect link on 08/30/94 at 2131. %e unit was in the outage the remainder of *he month.
i i
Prepared by: R. A. Williams Telephone: (704)-382-5346
i MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba. Unit 2
- 2. Scheduled next refueling shutdown: October 1995
- 3. Scheduled restart following refueling: November 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 444
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: Sectember 2011 DUKE POWER COMPANY DATE: September 15. 1994 Name of
Contact:
R. A. Williams Phone: (704)-382-5346 l
l l
l l