Monthly Operating Repts for Aug 1994 for Limerick Generating Station
ML20072U986
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/31/1994
From: Kelley S, Muntz J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9409190126
Download: ML20072U986 (11)


Text

.

'n '

Um rick Centratin3 $trtlin n

v.

=

T g

  • J ;; ; * -

PECO ENERGY

. Sanatoga, PA 19464/J920 t

2 T.S.6.9.1.6 L

1 L

i

. September 12, 1994 Docket Nos. 50-352 50-353 License NosNPF-39 NPF-85' U. S.' Nuclear Regulatory Commission Attn:

Document Control' Desk-i Washington, DC. 20555

Subject:

Limerick Generating Station Monthlf Operating Report For Units 1 and 2 i

Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of August, 1994' forwarded pursuant to Technical Specification 6.9.1.6.

i very truly yours, 9 r%d hff 3

James A. Muntz Director - Site Engineering f

sjk

-f Enclosures j

cc:

T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)

N. S. Perry, USNRC Senior Resident Inspector LGS (w/ enclosures)

D. R. Helwig, Vice President, Limerick Generating Station f

f rr s c

- V W k[ g ),

9409190126 940831 I*

PDR ADOCK 05000352.

jr p

R-ii I.

Docket No. 50-352 Attachment to Monthly Operating Report for August 1994 i

Limerick Generating Station Unit 1 August 1 through August 31, 1994 I.

Narrative Summary of Operatina Experiences Unit 1 began the month of August at a nominal 100% of rated thermal power (RTP).

Power was reduced a number of times during the month of August ao a rssult of high turbine backpressure.

On August 13, 1994, at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />, power was reduced to 92%

RTP for Main Turbine valve testing.

Power was restored to 100% RTP at 0920 hours0.0106 days <br />0.256 hours <br />0.00152 weeks <br />3.5006e-4 months <br />.

l On August 16, 1994, at 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br />, power was reduced to 98%

RTP per Load Dispatcher request due to minimum generation l

requirements.

Power was restored to 100% RTP at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.

l l

On August 28, 1994, at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />, power was reduced to 92%

l RTP for Main Turbine valve testing.

Power was restored to l

i 100% RTP at 1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br />.

Unit 1 ended this operating period at 100% of RTP.

II.

Challenoes to Main Steam Safety Relief Valves

]

There were no challenges to the Main Steam Safety Relief Valves during the month of August.

l i

I i

l ie-m

CVERQG2 DQILY UNIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE SEPTEMBER 12.1994 COMPANY PECO ENERGY COMPANY STEVEN J.

KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 MONTH AUGUST 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 1040 17 1008 2

1036 18 1035 3

1041 19 1044 4

1037 20 1039 5

1045 21 1037 6

1057 22 1049 7

1051 23 1051 8

1050 24 1053 9

1049 25 1048 10 1047 26 1044 11 1052 27' 1041 12 1042 28 1033 13 1027 29 1045 14 1034 30 1051 15 1050 31 1047 16 1092

I

-OPERQTING DQTA REPOR?

DOCKET NO. 50 - 352

_ _ _ = - _ _ = - - - - - - -

DATE SEPTEMBER 12.1994 COMPLETED BY PECO ENERGY COMPANY

--.... =

STEVEN J.

KELLEY a

REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 OPERATING STATUS 1.

UNIT NAME: LIMERICK UNIT 1 l NOTES: THERE WERE NO LOAD DROPS

2. REPORTING PERIOD:

AUGUST. 1994 GREATER THAN 20% THIS

- = - _.

3.

LICENSED THERMAL POWER (MWT):

3293 MONTH.

4 NAMEPLATE RATING (GROSS MWE):

1138

5. OESIGN ELECTRICAL RATING (NET MWE):

1055

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1055 8.

IF CHANGES OCCUR -IN CAPACITY RATING 5 (ITEMS NUMBER 3 THROUGH-7) SINCE LAST REPORT. GIVE REASONS:

9.

POWER LEVEL TO WHILH RESTRICTED. IF ANY (NET MWE):

+

10. REASONS FOR RESTRICTIONS. IF ANY:

,THIS MONTH VR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 5.831

-75.215 1

12. NUM8ER OF HOURS REACTOR WAS CRITICAL 744.0 4.980.2 61.179.3'
13. REACTOR RESERVE SHUTDOWN HOURS 0.0.

0.0 0.0 r

14 HOURS GENERATOR ON-LINE" 744.0 4.923.7 60,108]

15. UNIT RESERVE SHUTDOWN HOURS.

0.0-0.0-0.0

=-

16.. GROSS THERMAL ENERGY GENERATED (MWH) 2.447.551 15.424.140 184,874.899-

17. GROSS ELECTRICAL' ENERGY GENERATED (MWH) 803.210 5.023.500 60.065.540
18. NET ELECTRICAL ENERGY GENERATED (MWH) 776.962 4.845.147 57.631.137 PAGE 1 OF.

um..

-.__m,m, _ _

  • _ _ _ _ _ _ -

o

...-~-.w

-, -... -.. -. - ~.. - - - - - ~ ~..

.m

-m

-m-.<---_,-,

s

OPERATING DQTO REPORT (CONTINUED)

DOCCIET NO. 00 - 352 o-

)-

'DATE SEPTEMBER 12.1994 THIS MONTH YR-TO-DATE

. CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 84.4

~ 79.9

20. UNIT AVAILABILITY FACTOR 100.0 84.4 79.9 s
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.0 78.8 72.6-
22. UNIT CAPACITY FACTOR (USING DER NET) 99.0 78.8 72.6
23. UNIT FORCED OUTAGE RATE:

0.0 1.1 4.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):-

FORECAST ACHIEVED INITIAL CRITICALITY

.12/19/84 12/22/84

~

INITIAL ELECTRICITY

. MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 I

t

}

4 i

PAGE 2 OF'2-I l

i i

+

. - ~.. _,., - _ _ _,,,

...._.i..,...;....-

.._..;._..m_

.._ _. a., _. -. -.

..as.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 UNIT NAL'E LIMERICK UNIT 1 DATE SEPTEMBER 12.1994 REPORT MONTH AUGUST. 1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J.

KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763

= - - -

l METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE l TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE l (1)

(HOURS)

(2)

REACTOR (3)

REPORT a (4)

(5)

PREVENT RECURRENCE 1

28 940813 l S 000.0 B

4 N/A HA INSTRU REACTOR POWER WAS REDUCED TO 92% FOR l

MAIN TURBINE VALVE TESTING.

I 29 940814 l 5 000.0 M

4 N/A HF TURBIN REACTOR POWER WAS REDUCED TO 98%

l DUE TO HIGH TURBINE BACKPRESSURE.

l 30 940816 l S 000.0 H

4 N/A RB VESSEL REACTOR POWER WAS REDUCED TO 98% DUE l

TO MINIMUM GENERATION REOUIREMENTS.

I 31 940928 l 5 000.0 B

4 N/A HA INSTRU REACTOR POWER WAS REDUCED TO 92% FOR l

MAIN TURBINE VALVE TESTING.

I I

I l

l (1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D-REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

{

E - OPERATOR TRAINING + LICENSE EXAMINATION 1

F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H-OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE

Docket No. 50-353 Attachment to Monthly Operating Report for August 1994 Limerick Generating Station Unit 2 August 1 through August 31, 1994 I.

Narrative Summarv of Operatina Exneriences Limerick Unit 2 began the month of August-at a nominal 100%

of Rated Thermal Power (RTP).

Power was reduced a number of times during the month of August as a result of high turbine backpressure.

On August 7, 1994, at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, power was reduced to 90%

RTP for a control rod pattern adjustment.

Power was restored to 100% RTP at 0839 hours0.00971 days <br />0.233 hours <br />0.00139 weeks <br />3.192395e-4 months <br />.

On August 13, 1994, at.1814 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.90227e-4 months <br />, power.was reduced to 97%

RTP per procedure as a result of an unexpected increase in power.

The power increase was the result of a 500 Kv transmission line trip during a storm which caused a slight increase to the 2A Recirculation Pump.

Power was restored to 100% RTP shortly thereafter.

On August 21, 1994, at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br />, power was reduced to 92%

RTP for Main Turbine valve and control rod exercise testing.

Power was restored to 100% RTP at 1020 hours0.0118 days <br />0.283 hours <br />0.00169 weeks <br />3.8811e-4 months <br />.

On August 24, 1994, the unit entered end-of-cycle coastdown.

On August 31, 1994, at 1202 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.57361e-4 months <br /> power was reduced to 95%

RTP in order to remove the 6A, B,

and C feedwater heaters from service.

Following the removal of the Feedwater heaters power was restored to 100% RTP at 1405 hours0.0163 days <br />0.39 hours <br />0.00232 weeks <br />5.346025e-4 months <br />.

Unit 2 ended this operating period at 100% of RTP.

II.

Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of August.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 353

-===

UNIT LIMERICK UNIT 2 DATE SEPTEMBER 12.1994 COMPANY PECO ENERGY COMPANY STEVEN J.

KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 MONTH AUGUST 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET)

(MwE-NET).

I 1047 17 1055 2

104S 18 1048 3

1050 19 1053 4

1046 20 1049 5

1051 21 1040 6

1064 22 1055 7

1049 23 1059 8

1059 24 1058 9

1057 25 1047 10 1056 26 1040 11 1061 27 1034 12 1052 28 1030 13 1040 29 1032 14 1042 30 1037 15 1060 31 1033 16 1060

OPERATING DATA REPORT

?

DOCKET NO. 50 - 333 DATE SEPTEMBER 12.1994 COMPLETED 8V P CO ENERGY CO ANY ~

_=_-

STEVEN'J. KELLEY REPORTS ENGINEER:

SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763-OPERATING STATUS

1. UkIT NAME: LIMERICK UNIT 2 NOTES: THERE WERE NO L.OAD DROPS 2.

REPORTING PERIOD:

AUGUST. 1994 GREATER THAN 20% THIS 3.

LICENSED THERMAL POWER (MwT):

3293 MONTH.

4 NAMEPLATE RATING (GROSS MwE):

1138

5. DESIGN ELECTRICAL RATING (NET WWE):

1055

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):-1092
7. MATIMUM DEPENDABLE CAPACITY (NET MwE):

1055 4

8.

IF CHANGES OCCUR IN CAPACITY RATINGS.(ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

o 9.

POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

10. REASONS FOR RESTRICTIONS,-IF ANY:

1 THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5.831 40.727
12. NUM8ER OF HOURS REACTOR WAS CRITICAL 744.0-5.831.0 36.473.6
13. REACTOR RESERVE SHUTDOWN HOURS OO O. ()

0.0

14. HOURS GENERATOR ON-LINE 744.0 5.831.0 35.777.7

---=

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0

. 0.0

16. GROSS THERMAL ENERGY GENERATED (MwH) 2.437.680 19.106.857 114.411.938
17. GROSS ELECTRICAL ENERGV GENERATED (MWH) 809.580 6.383.460 37.875.986
18. NET ELECTRICAL ENERGY GENERATED (MwH)

.780.282 6.164.791 36.495.483 PAGE.1 OF 2 i

i L

+

.-..%,..~,

.w

,-e-n

,+wes

+w e.+

+w---i4

.m.-

,w.-,

.-w+-

+

=

,m.,

m,,.v.,

j OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 - 353._.

DATE SEPTEMBER 12.1994 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 87.8
20. UNIT AVAILABILITV FACTOR 100.0

'100.0 87.8 I

21. UNIT CAPACITY FACTOR (USING MDC. NET) 99.4 100.2.

84.9

22. UNIT CAPACITY FACTOR (USING DER NET) 99.4 100.2 84.9
23. UNIT FORCED OUTAGE RATE O.0-0.0 3.5 i

24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:-
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89

' INITIAL ELECTRICITY 09/01/89' -09/01/89 COMMERCIAL OPERATION 02/01/90' 01/08/90 p

1 l,.

1 t

PAGE 2 OF.2 i

i

.a _. _... _.. _.. -. _.;_.... _ _ _ _. _ _. - -.-_....-.,

g

^

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 UNIT NA%E LIKERICK UNIT-2 c

... - - - - =.

w DATE SEPTEMBER'12.1994 REPORT MONTH AUGUST. 1994 COMPLETED BV PECO ENERGY COMPANY' STEVEN J. KELLEY j.

REPORTS ENGINEER SITE ENGINEERING' I

LIMERICK GENERATING STATION l

TELEPHONE (610) 327-1200 EXTENSION 3763 l

I METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(S)

PREVENT RECURRENCE I

15 940807 5

000.0 B-4-

N/A RB CONROD

' REACTOR POWER WAS REDUCED TO 90% FOR' A CONTROL ROD PATTERN ADJUSTMENT.

l 16 940813 l 5 000.0 H

4 N/A EA PUMPXX REACTOR POWER WAS REDUCED TO 97% DUE INCREASED RECICULATION PUMP OPERATION.

17 940821 S

000.0 B

4 N/A HA INSTRU REACTOR POWER WAS REDUCED TO 92% FOR

. MAIN TURBINE VALVE TESTING.

18 940824 S

000.0 C

4 N/A CH HTEXCH' REACTOR POWER WAS REDUCED TO 95% DUE TO THE REMOVAL OF A FEEDWATER HEATER.

19 940831 S

000.0-H F

N/A HF TURBIN REACTOR POWER WAS REDUCED TO 95% DUE TO HIGH TURBINE BACKPRESSURE.

g 1

1

.(1)

(2)-

(3)

(4)

F - FORCED REASON METHOD.

EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1'- MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR. TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT'(LER).

D - REGULATORY RESTRICTION 4 - OTHER-(EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H-OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE

.. -.