Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,changing Tech Spec 3.1.3.4 Re Value of Required Control Rod Drop Time from 3.3 to 2.2 for Consistency W/ FSAR Chapter 15 Safety Analyses
ML20072U496
Person / Time
Site: Catawba, McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/11/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072U500 List:
References
NUDOCS 9104190169
Download: ML20072U496 (4)


Text

11 I

. . M, in,r nervy u s im

\ v , n, uJ, nt

%; !, vr l'rud i: non th rt

,, f* H ik t wi h t, a Op r.awu 4 Tv1;i!. n ;l Clw l& \ C X"I 100 r

DUKE POWER April 11, 1991 U. S. Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D. C. 20555

Subject:

McGuire Nuclear Station Docket Numbers 50-369 and -370 Catawba Nuclear St'ation Docket Numbers 50-413 and -414 Technical Specification Revision; Change in Control Rod Drop Times Attached is a proposed revision to Technical Specifications, pursuant to 10CFR 50.90, for the McGuire and Catawba Nuclear Stations. The revision will change the value of the required control rod drop time from 3.3 seconds to 2.2 seconds (Technical Specification 3.1.3.4).

The proposed changes to McGuire and Catawba Technical Specifications are contained in Attachment I. A discussion and technical justification of the change appear in Attachment II, and an analysis to support a No Significant Hazards determination is contained in Attachment III.

This enange will make the technical specification value consistent with that used in the FSAR Chapter 15 Safety Analyses.

The FSARs of the two stations will be updated during the first update-following the approval of the amendment request. Copies of this amendment request have been provided to the States of North Carolina and South Carolina.

Please note that this amendment request is related to the startup of McGuire Unit 1 Cycle 8, which is scheduled for November, 1991, in that the safety analyses performed in support of this reload cycle assumed a control rod crop time of 2.2 seconds. Therefore, if this amendment request is not approved there will be a significant impact on our efforts relative to the McGuire Unit 1 Cycle d reload and the associated Technical Specification change that we will be submitting in early June, 1991. Accordingly, I request that this amendment be reviewed at your earliest opportunity. If, during the review, you identify any concerns that could impact the approval of this request, early notification of such concerns could result in prompt resolution, and would be appreciated. ,

H O4190169 910411

{DR ADOCK 0500 9 g

-e .v..v

h. S. Nuclear Regulatory Commission April 11, 1991 Page 2 If there are any questions, please call Scott Gewehr at (704) 373-

-7581.

Very truly yours,

%,h. M M. s. Tuckman drptme/ sag 4

4 4'

cc: Mr. T. A. Reed, Project Manager - _ k office of Nuclear Reactor Regulation i U. S. Nuclear Regulatory Commission Mail.Stop 9H3, OWFN Washington, D. C. 20555 Mr. R.E. Martin, Project Manager.

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission.

Mail Stop 9H3, OWFN Washington, D. C.-- 20555 Mr. S.-D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region-II

- 101 Marietta Street, NW - Suite 2900

- Atlanta, Georgia 30323 Mr. P. K.-Van Doorn L Senior Resident Inspector

/

McGuire Nuclear Station Mr. W.-T. Orders-Senior Residsnt Inspector McGuire Nuclear Station ~

4

. +-eg.. +-,..wwm,--w,- .,,_-,e,%,-.,,w,,-.,--w ,-w,[_e ,,,.,w .6%,. ....._ g.-. .,, ,-,m.w - ,. ,._,y,. .,,m,-w. - . . --c,..m.,_- . _ , - .... - - , , ,e.-.,--. ,.

U. S. Nuclear Regulatory Commission April 11, 1991 Page 3 Mr. Heyward Shealy, Chief Bureau of Radiological Health South Carolina Department of Health &

Environmental Control 2600 Bull Street Columbia, South Carolina 29201 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenuo Farmington, CT 06032 M&M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Services 701 Barbour Drive Raleigh, North Carolina 27603-2008

a

-U. S. Nuclear Regulatory commission April 11, 1991 Page 4 M. S. Tuckman, being duly sworn, states that he is Vice-President of Duke Power company; and that he is authorized on the part of said company to sign. and file with the Nuclear Regulatory commission this revision to the-McGuire Nuclear Station Technical specifications, Appendix A to Facility Operating License Nos. NPF-9 and NPF-17; and that all statements and matters set forth therein are true and correct to the best of his knowledge, bh M. S. Tuckman, Vice-President Subscriced and sworn to beforo me this lith day of April, 1991.

Q Notpry Public

? /L --

.)-

)ALL - % w. Y My commission expires:

Y}N r , 6 /'E U f

w._.. .. --+_ - . , _ . v-. .-_.-.-,v.d-,-.- 4-.-.-.....-e... . - , . - - - - - . . . _ - , n- - ,. . . --__y__.---_.-- - - -._,- - - .m_-.. - < rem we,-