MONTHYEARML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 LR-N980104, Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 1 ML20203B6741998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Hope Creek Generation Station,Unit 1 ML20198T3591997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Hope Creek Nuclear Generating Station,Unit 1 ML20203B6841997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 & Jan 1998 for Hope Creek Generation Station,Unit 1,summary of Changes,Tests & Experiments ML20198T4061997-11-30030 November 1997 Revised MOR for Nov 1997 for Hope Creek Nuclear Generating Station,Unit 1.Summary of Changes,Tests,Experiments & Refueling Info,Encl ML20203K3751997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Hcgs,Unit 1 ML20203K3821997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1 ML20199G5591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1 ML20199G5931997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for HCGS, Unit 1 ML20211Q6481997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Hope Creek Generating Station ML20212A5301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Hope Creek Generating Station,Unit 1,summary of Changes,Tests & Experiments ML20217A1491997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Hope Creek Generating Station,Unit 1 ML20217A6261997-07-31031 July 1997 Revised Monthly Operating Rept for Jul 1997 for Hope Creek Generating Station,Unit 1 LR-N970503, Monthly Operating Rept for Jul 1997 for Hope Creek Generating Plant Unit 11997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Hope Creek Generating Plant Unit 1 ML20149F2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for HCGS ML20149F3061997-05-31031 May 1997 Revised Monthly Operating Rept for May 1997 for Hope Creek Generating Station.Summary of Changes,Tests & Experiments Encl ML20140H6761997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Hope Creek Generating Station Unit 1.Summary of Changes,Tests & Experiments Implemented in Apr 1997 Included in Rept LR-N970321, Monthly Operating Rept for Apr 1997 for Hope Creek Generating Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Hope Creek Generating Station ML20137X7311997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Hope Creek ML20147F6051997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Hope Creek Generating Station ML20147F6111997-01-31031 January 1997 Revised MOR for Jan 1997 for Hope Creek Generating Station LR-N970110, Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 11997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 1 ML20133M9831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Hope Creek Generating Station ML20133B7901996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Hope Creek Generation Station Unit 1 LR-N966376, Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 1 ML20129A8271996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Hope Creek Generation Station Unit 1 ML20134C0941996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Hope Creek Generation Station ML20116P0181996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Hope Creek Unit 1 ML20117C3331996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Hope Creek Generation Station Unit 1 ML20134C1031996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 Hope Creek Generation Station ML20115E8491996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Hope Creek Generation Station ML20117C3701996-06-30030 June 1996 Revised Monthly Operating Rept for June 1996 for Hope Creek Generating Station ML20116P0381996-06-30030 June 1996 Summary of Changes,Tests & Experiments That Had Been Implemented During June 1996 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F1501999-10-12012 October 1999 Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20217M0211999-09-20020 September 1999 Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG ML20211N5531999-09-0808 September 1999 Safety Evaluation Supporting Amend 121 to License NPF-57 ML20211B3781999-08-13013 August 1999 Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8331999-07-26026 July 1999 Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History ML20216D8721999-07-26026 July 1999 Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 ML20210F3331999-07-22022 July 1999 Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8901999-06-30030 June 1999 IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206Q4731999-05-14014 May 1999 SER Accepting Response to GL 97-05, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8451999-04-30030 April 1999 Rev 1, Submittal-Only Screening Review of Hope Creek Unit 1 IPEEE (Seismic Portion). Finalized April 1999 ML20206C8481999-04-22022 April 1999 SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i) LR-N990157, Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced1999-04-12012 April 1999 Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20205G6051999-03-19019 March 1999 SER Accepting Relief Request Re Acme Code Case N-567, Alternate Requirements for Class 1,2 & 3 Replacement Components,Section Xi,Div 1 ML20205F8911999-03-18018 March 1999 Safety Evaluation Authorizing Licensee Requests for Second 10-year Interval for Pumps & Valves IST Program ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20202F6861999-01-26026 January 1999 Engine Sys,Inc Part 21 (10CFR21-0078) Rept Re Degradation of Synchrostat Model ESSB-4AT Speed Switches Resulting in Heat Related Damage to Power Supply Card Components.Caused by Incorrect Sized Resistor.Notification Sent to Customers ML18107A1871998-12-31031 December 1998 PSEG Annual Rept for 1998. ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With ML18107A1881998-12-31031 December 1998 PECO 1998 Annual Rept. LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With ML20198N4161998-11-12012 November 1998 MSIV Alternate Leakage Treatment Pathway Seismic Evaluation LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with ML20155J9861998-10-31031 October 1998 Non-proprietary TR NEDO-32511, Safety Review for HCGS SRVs Tolerance Analyses LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 ML20236E9491998-06-30030 June 1998 Rev 0 to non-proprietary Rept 24A5392AB, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8 ML18106A6821998-06-24024 June 1998 Revised Charting Our Future. ML18106A6681998-06-17017 June 1998 Charting the Future. LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 ML20248C7381998-05-22022 May 1998 Rev 0 to Safety Evaluation 98-015, Extension of Allowed Out of Service Time for B Emergency Diesel Generator LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML18106A5851998-03-0303 March 1998 Emergency Response Graded Exercise,S98-03. Nuclear Business Unit Salem,Hope Creek Emergency Preparedness, 980303 1999-09-08
[Table view] |
Text
m: _,_
l ., l . -1' O PSEG Public Service Electric and Gas Company P.O. Box 230 Hancocks Bridge, New Jersey 08038 Hopo Creek Generatin0 Station l
April 12, 1991 U .~ S . - Nuclear Regulatory Commission Document Control Desk Washington,-DC 20555 1 l
Dear Sir 1 MONTHLY OPERATING REPORT HOPE CREEK GENERATION STATION-UNIT 1:
DOCKET'NO.-50-354' In; compliance with:Section 6.9, Reporting Requirements for the i Hope Creek Technical. Specifications, the operating statistics for' March are being forwarded to you with the- -
-summary of changes, tests,;and~ experiments for March 1991 pursuant.to the requirements of:-10CFR50.59(b).
Sincerely yours,
- k. J . - agan Genernl-Manager.--
' Hope Ct%$k Operations-g h RAR:ld' Attachments'-
.C -Distribution 9104180002 910331 /
PDR ADOCK 05000354 !/
R PDR
]3 J l The Energy People ;
m o n gwnnt
., _ . . _ . . . . . - . . . . . - - . . - . . . _ . . . . . ~ , . _ , . _ . . _ . . . , , . . . . . , _ . . . . . . . . _ . , . ..---..-.....,--,._e.... ,.,<--c ,-c,
_ . _ . _ _ _ . . . .m__ _.
'. i INDEX NUE ER SECTION OF PAGES Average Daily Unit Power Level. . . . . . . . . . . 1 Operating Data Report . . . . . . . . . . . . . . . 2 Refueling Information . . . . . . . . . . . . . . . 1 Monthly Operating Summary . . . . . . . . . . . . . 1 Summary of Changes, Tests, and Experiments. . . . . 8 l
l l
l l
1 I
i .-
I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-354 UNIT lione Creek DATE 4/12/91 COMPLETED BY L Zabielski TELEPHONE (609) 339-3506 MONTH March 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. A 17. 221
- 2. A 18. 19LO,
- 3. 408 19. 1Q11
- 4. $12, 20, 1221
- 5. 1Q3_2, 21. 1Q21
- 6. 1Qff 22. 1Qs2
- 7. 1931 23. 1Q11
- 8. 1Q&2 24. 1Q1Q 9.- 1077 25. 1Qs2
- 10. 1922 26. 1Q1A
- 11. .LQ21 27. 1Qjf.
12, 1Qs1 28. 1Q5A
- 13. 1Q11 29. 1064
- 14. 1063* 30. 1951
- 15. J.063* 31, 1Q2.1
- 16. 1Qfa cDue to an error in recording the meter readings, the exact average daily power level for March 14 and 15 is unknown. The listed averages for those two days represents the average of the two-day total.
._.____A - -_ -
-..o t; e e i OPERATING DATA REPORT DOCKET NO. 50-354 UNIT Hooe-Creek
^
-DATE' 4712/91 COMPLETED BY V. Zabielski~
TELEPHONE (609) 339-3506 OPERATING STATUS-
- 1. _ Reporting Period' March -1921 Gross-Hours in Report Period 2AA
- 3. . Currently Authorized-Power Level-(MWt) 3293 Max. Depend.-CapacityJ(MWe-Net) . 1031 DesignxElectrical Rating (MWe-Net) 1067 l L3 . Power Level to which restricted (if'any) (MWe-Net) None !
4.- Reasons)for restriction (if any)
This Yr To Month. Data Cumulative
- 5. 'No. of hours reactor was critical 713.8 859.8 30,641.3.
4
- 6. Reactor reserve shutdown: hours Da 2x2 ExQ-
,l Hours generator on line 698.0 778.7 30.071.8
-8. Unit reserve. shutdown; hours _ 929 A19 gin L
9.- Gross thermal energy generated. 2,195,189 :2,296,733 94,839,140'
--(MWH) J u
31,380',253
~
10.LGross electrical _ energy _733,330 - 758,580
. generated . (MWH) - -
-11. Net electrical energy l generated. 704.994 711,135 29,967,819' s (MWH)-
L za2; Reactor-service factor 95.9 39.8 81.7 l
l} 13.' Reactor availability factor. 95.9 39.8 81.7 L
!14.[UnitLservice. factor- 93.8 36.1 80.2 L15.iUnit availabi'lity' factor 93.8 .36,1 80.2
=16.? Unit capacity 'f actori (using MDC) 91.9 31.9 77.5 17., Unit capacity factor 88.8 30.9 74.9:
- (Using Design-MWe)
~ 18. - Unit? forced outage rate
~
A12 21.3 itQ
'19. Shutdowns scheduled over next 6 months'(type, date,-& duration):-
- None
- 20. If_ shutdown at-end of' report period, estimated date of start-up:
N/A t s
! OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-354 UNIT Hope Creek DATE 4/12/91 COMPLETED BY V. Zabielski TELEPHONE (609) 339-350'6 MONTH March 1991 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) (1) POWER (2) ACTION / COMMENTS 5 3/1 F 46 A 4 Continuation of Outage to Repair H2 Leak on Main Generator 6 3/16 F 0 A 5 Power Reduction to Repair Condenser Tube Leak Summary
4 REFUELING INFORMATION DOCKET NO. 50-354 UNIT Hope Creek DATE 4/12/91 COMPLETED BY S. Hollinasworth TELEPHONE (609) 339-1051 4 MONTH March 1911
- 1. Refueling information has changed from last month:
Yes X No
- 2. Scheduled date for next refueling: 9/5/92
- 3. Scheduled date for restart following refueling: 11/3/92
- 4. A. Will Technical Specification changes or other license amendments be required?
Yes No X B. Has the reload fuel design been reviewed by the Station Operating Review Committee?
Yes No X If no, when is it scheduled? Dot currently scheduled
- 5. Scheduled date(s) for submitting proposed licensing action: HIA
- 6. Important licensing considerations associated with refueling:
- Amendment 34 to the Hope Creek Tech Specs allows the cycle specific operating limits to be incorporated into the CORE OPERATING LIMITS REPORT; a submittal is therefore not required.
- 7. Number of Fuel Assemblies:
A. Incore 764 B. In Spent Fuel Storage (prior to refueling) A2s C. In Spent Fuel Storage (after refueling) 760
- 8. Present licensed spent fuel storage capacity: 4006 Future spent fuel storage capacity: 4006
- 9. Date of last refueling that can be discharged July 22, 2007 to spent fuel pool assuming the present licensed capacity:
HOPE CREEK GENERATING STATION MONTHLY OPERATING
SUMMARY
MARCH 1991 At the beginning of March, Hope Creek remained shutdown to repair a Main Generator Hydrogen Seal. The Generator was synchronized at 10:00 PM on March 2nd, On March 16th, power was reduced to repair a condenser Tube leak. The unit operated for the remainder of the month without shutting down or experiencing any other reportable power reductions. At the end of the month, the unit completed its 29th day of continuous power operation.
Y .
6 j
SUMMARY
OF CHANGES, TESTS, AND EXPERIMENTS FOR THE HOPE CREEK GENERATING STATION MARCH 1991
The following Design Change Packages (DCP's) have been evaluated to determine:
- 1. If the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
- 2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
- 3. If the margin of safety as defined in the basis for any technical specification is reduced.
The DCP's did not create a new safety hazard to the plant nor did they affect the safe shutdown of the reactor. The DCP's did not change the plant effluent releases and did not alter the existing environmental impact. The Safety Evaluations determined that no unreviewed safety or environmental questions are involved.
s .
i QgE Description of Desian Chance Packace 4EC-1024/02 This DCP added two stairways from the existing catwalk at elevation 77' 5" to the top of the torus. Each set of stairs includes a platform and a landing. The stairways will provide a safe for of access.
4EC-3111/05 This DCP replaced two Class HXC, epoxy lined carbon steel Service Water spool pieces with piping Class HZC, 6% Molybdenum stainless steel. The new material is more corrosion /crosion resistant.
4EC-3112/01 This DCP replaced 14 Class HXC, epoxy lined carbon steel Service Water spool pieces with piping class HZC, 6% Molybdenum stainless steel. This DCP also mortar lined carbon steel replaced 10 Class Service Water HGC[ng Screenwash Suction Line Travell spool piecessteel.
stainless with piping Theclass newHZC,in material more6% Molybdenum corrosion / erosion resistant.
4EC-3112/05 This DCP replaced two Class HXC, epoxy lined carbon steel Service Water spool pieces with piping Class HZC, 6% Molybdenum stainless steel. The new material is more corrosion / erosion resistant.
4EC-3112/06 epoxy lined carbon This steelDCP replaced Service WaterClass spoolHXC[eces p with piping class HZC, 6% Molybdenum stainless steel. The new material is more corrosion /crosion resistant. This DCP also replaced Safety Auxiliaries Cooling System balancing valves with aluminum bronze butterfly valves.
4EC-3112/09 This DCP modified the Station Service Water System by adding a manual butterfly isolation valve, a manual drain valve, and a standpipe. It also epox replaced a Class Service Water HXC,iece.y spool p lined All ofcarbon the newsteel material is made with piping Class HZC, 6% Molybdenum stainless steel. The new material is more corrosion / erosion resistant.
4EC-3112/11 This DCP diverted the Station Service Water System water flow to the Cooling Tower Basin and to the Cooling Tower Bypass Line. This modification permitted the draining of the Cooling Tower during the modifications to the Service Water System Return to Cooling Tower Piping.
4EC-3112/12 epoxy lined This DCP carbon replaced steel Serviceseven WaterClass spoolHXC,ieces p with piping Class HZC, 6% Molybdenum stainless steel. The new material is more corrosion / erosion resistant. It also replaced two butterfly valves to improve the isolation and shutoff capability.
I
r '.
QQ2 Description of Desian Chance Packa_gg 411M-0522 This DCP completed the site grading and paving in the southwestern portion of the !! ope Creek yard.
The final design is very close to the original design, the differences being minor grading changes.
r .
The following Temporary Modification Requests (TMR's) have been evaluated to dntermine:
- 1. If the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
- 2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
- 3. If the margin of safety as defined in the basis for any technical specification is reduced.
The TMR's did not create a new safety hazard to the plant nor did they affect the safe shutdown of the reactor, The TMR's did not cnange the plant effluent releases and did not alter the existing environmental impact. The Safety Evaluations determined that no unreviewed safety or environmental questions are involved.
.-.-. . - - .. - - - ~.~.- - - - - . - - . - - - .- ~ - . _ ~ . .
d' ,, .
IBB ~ pescriotion of Temocrary Modification Reauest 91-014 This TMR modified the process computer to identify 1
.the as-installed positions of the Traversing Incore 1 Probe Stationary Guide Tubes. The tubes were swapped during re-installation during the third refueling outage.
i-91-015 This TMR removed the overload heaters from the breakers for the Reactor Water Cleanup Discharge to Condenser Valve and the Reactor Water Cleanup Discharge to Equipment Drain Valve. Removing the overload heaters from the breakers will prevent the valves from inadvertently opening during an Appendix R fire.91-016 This TMR unpinned a sway strut hanger on the High.
Pressure Coolant Injection Steam Supply Line to prevent the strut from bending or breaking during the High Pressure Coolant Injection System Steam l Line warmup. The TMR was removed when the steam line warmup was completed. .91-017 This 1MR provided an alternate flowpath for the offgar. Hydrogen Analyzer's Sample Return Line by conne! ting the existin Condeiser Return Line.g sample return to theThe existing sample return line was plugged, making the hydrogen analyzers inoperable until a flowpath was made available.91-018 This.TMR installed a 1" PVC Acid Injection Line to the Makeup Domineralized Water Regenerative Waste Tank. The original line has disintegrated the PVC is more resistant to the chemical reaction,than the original material.-
f l.
I L
L_-
1 l
r
O a The following procedure revision has boon ovaluated to dotormino:
- 1. If the probability of occurrence or the consequences of an accident or-malfunction of equipment important to safety previously evaluated in the safety analysis report may be increasod; or
- 2. If a possibility for an accident or malfunction of a difforont type than any evaluated previously in the safety analysis report may be created; or
- 3. . If the margin of safety as defined in the basis for any technical specification is reduced.
The procedure revision did not create a now safoty hazard to the plant nor did it affect the safo shutdown of the reactor. The proceduro revision did not change the plant offluent roloasos and did not alter the existing environmental impact. The Safety Evaluation determined that no unreviewed safety or environmental questions are involved.
L I 1
l l
l:
1 ..- -- ._ _ - _ . . _. -. -
Procedure Revision Descriotion of Proc _edure Revision l NC.NA-AP.ZZ-0025(Q) This procedure supersedes SA-AP. ZZ-025 'Q) ,
Rev. O which is referenced in several places :.n the UFSAR. This Safety Evaluation identifies where SA-AP.ZZ-025(Q) is referenced so those paragraphs can be revised.
i l
1 l
3