Electnc POWER COMPANY
-l
_ 231 W tAchvan. PO Box 2046< Mdwoukee. WI 53201 -
(414)221-2345 1
VPNPD-91-116 NRC-91-0033 April 9, 1991 U.
S.
NUCLEAR REGULATORY COMMISSION Document Control-Desk Mail Station P1-137 i
Washington, D.
C.
20555 Gentlemen:
DOCKETS-50-266 AND-50-3Q1 l
- t40NTHLY OPERATING REPORTH POINT BEACH NUCLEAR PLAQT. UNITS 1 AND.a Attached are monthly operating. reports for Uni s 1 and 2, R
Point Beach Nuclear Plant, for the calendar month of March 1991.
Very truly yours,
'7
/j, ji bb(./
,[
^
p C.. W.-Fpy G lt Vice President Nuclear Power
' Attachments Copi'es ;to _ L. - L. -Smith, PSCW
.NRC Regional Administrator, Region III NRC Resident Inspector 9104160377 91033 f-DR l
~
ADOCK 05000 6 PDR
^/
!j i
ilsubWim ofWnymbilhem Oxrrw6m
-- ^
'.P w
OPERATING DATA REPORT DATE April 5, 1991 COMPLETED BY D.
C.
Peterson s
TELEPHONE 414/755-2321 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UhIT 1 NO1ES 2.
REPORTING PERIOD:
MARCH 1991 3.
LICENSED T9ERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATI!C (GROSS MWE):
523.6
- 5. DESIrN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMoM DEPENDABLE CAPACITY (GROSS MWE):
509.
- 7. MAXIMUM DE" 'NDABLE CAPACITY (NET MWE):
485.
8.
1F CHANGE 2 CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCF LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER 1.YVEL TO WHICN RESTRICTED, IF ANY (NET MWE): NOT APPLICABL'
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH Yt TO DATE CUMULATIVE 744 2,160 178,824 l
- 11. HOURS IN ' PORTING PERIOD 744.0 2,160.0 147,927.5 d.
NUMBER OF hJURS REACTOR WTS CRITICAL 0.0 0.0 652.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 744.0 2,160.0 145,063.5 i
f
- 14. HOURS GENERATOR ON LINE 0.0 0.0 837.9
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS The.? MAL ENERGY GENERATEL (MWH) 1,128,466 3,275.561 202,682,256
- 17. GRO ?.LECTRICAL ENERGY GENEPATED (MWH) 383,960 2,113,360 68,415,740
- 18. NET L2G tCAL ENERGY GENERP IED (MWH) 368,154 1,067,386 65,188,426 100.0 100.0 81.1 f
- 19. UNIT S*.R '!CE FACTOR l
- 20. UNIT AVAILABIL'.TY FACTOR 200.0 100.0 81.6 102.0 101.9 74.8 l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.6 99.4 73.3
- 22. UNIT CAPACITY FACTOR (USING DER NET)
O.0 0.0 1.7
- 23. UNIT FORCED 03TAGE RATE
- Fort' -two day rebelina and maintenance octage scheduled to start April 5, IS31.
1
- 25. IF SHUTDOWN AT END OF' REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUE% ED IP! JRC LETTER DATED SEPTEMBER 22, 3977
a POINT BEACII NUCLEAR PLANT ^
DOCKET NO.
14N AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit I.
MONTH MAnCII - 1991 DATE Apri! 4.1991 COMPLETED BY _D. C. Peterson -
TFT FPHONE 414n55-2321 -
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWT_R 7.dVEL DAY MWe NET DAY MWe NET DAY MWe NUT 1
494 11 493 21 494 2
4%
12 405 22 496 3
495 13 496 23 496 6
496 14 496 24 495 5
495 15 495 25 495 v3 496 16 495 26 4%
7 495 17 478 27 4%.
l 8
495 18 496 28 494 9
496 19 495 29
_. M6 10 499 20 495 30 496 31 496 l
P11F402Sa (03-90)
POINT BEACH NUCLID,R PLANT Docket No.
J1-266 Uni Nrane Point Beach. Unit 1 UNIT SittJTDOWNS AND POWER PE_I))U%b.S Dat Arvril 2.1991 Cor pleted By D. C. Peterson REPORT MONTII MARCH - 1991 Tel:pbone No.
414D55-232L Ext. 361 i
Method of Shutting
(
No.
Date Type' Duration Reason-Down Licensec Event System Component Cause and Correcthe Action
,(II, urs)
Reactor Retwe No.
Code' Code' To Prevent Recurrence 3
l i
l l
i I
1 l
l l'
l t
F: Forced Reason-
'Methed-
' Exhibit G - Instructions 2
S: Scheduled A - Equipment E-ilure (explain) 1 - Mameal for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatog Restriction 4 - Continuation of E - Operator Training &
Previous ShutdowTi Licensing Exam 5 - Reduced Load F - kiministrative 6 - Other (explain)
' Exhibit I - Same.>ource G - Operational Error (explain)
II - Other (explain)
PilF-CD2Sb (03-%)
s
l
' DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE April 6, 1991 COMPLETED BY D.
C.
Peterson TELEPHONE 414/755-2321 Unit 1 operated at approximately 494 MWe net throughout this report period with no significant load reddctions.
On March 17, C7 and K9 control rods, Bank D, were declared out of service due to faulty indication; surveillance was increased per T.S.15.3.10.D.3.
The control rods were returned to service later the same day.
On March 19 an Emergency Plan Exercise was conducted during off hours.
Safety-related maintenance included repacking of P32A, service water pump.
i OPERATING DATA REPORT DOCKET NO. 50-301 DATE April 5, 1993 COMPLETED BY D. C.
Peterson TELEPHONE 414/755-2321 OPERATING STATUS
.............. q,.
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT UNIT 2 NOTES 2.
REPORTING PERIO3:
MARCH 1991 3.
LICEdSED THERMAL N)WER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
4?7.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPOP.t, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICAE LE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THI's MONTH YR TO DATE CUMULATIVE 744 2,160 163,609
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 143,244.5
- 12. NUMBET: OF HOURS REACTOR WAS CRITICAL 0.0 0.0 216.7
- 13. REACTCR RESERVB SHUTDOWN HOURS 744.0 2,160.0 141,079.4
- 14. HOURS GENERATOR.ON IINE O.0 0.0 302.2
- 15. UNIT RESERVE SHUTLOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,117,097 3,264,256 201,428,667
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 383,250 1,121,080 68,418,340 l
- 18. NET ELECTRICAL ENERGY GENER?TED (MWH) 367,107 1,074,094 65,206,160 100.0 100.0 86.2
- 19. UNIT SERVICE FACTOR 100.0 100.0 86.4
- 20. UNIT AVAILABILITY FACTOR 101.7 102.5 81.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.3 100.1 80.2
- 22. UNIT CAPACITY FACTOR (USING DER NET)
O.0 0.0 1.1
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NE7T 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Forty-two day refueling nnd maintenance outage scheduled to start September 27, 1991.
i l
l
- 25. IF SHUTDOWN AT END OF REPOtT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN IN NRC LETTER DATED SEPTEMBER 22, 1977 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED
POINT BEACil NUCLEA.R PLANT DOCKEPNO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 -
MONTII MARCH - 1991 DATE April L 1991 COMPLETED BY D. C. Peterson TELEPIIONE 414/755-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL j
POWER LEVEL POWER LEVEL i
DAY MWe NET DAY MWe NET DAY MWe NET 1
305 11 499 21 499 2
500 12 501 22 501 3
500 13 502 23 500 4
500 14 503 24 500 5
500 15 501 25 500 6
501 16 501 26 500 7
500 17 500 27 500 8
500 18 500 28 497 9
501 19 500 29 500 10 505 20 500 30 500
\\
31 483 l'BF402Sa (Ok90)
g:
.~
r[
. POINT BEACII NUCLEAR PLANT ~
. Docket No.
50-301
_- c Unit Name Point' Beach. Unit 2' I'
UNIT S110TDOWNS AND IMsWER REDUCTIONS.-
Date Ar ril 5.1991 ~-
' Completed By D. C. Peterson
' i-1
( REPORT MONTil - ' MARCH -' 1991 -
( Telephone No. ' 414/755-232L En. 361 - '*:
v IMethod of.
Shutting No.
, Date Type'
- Dur tion Reason '
Down-l Ixensee I%ent '
' System _
Component Cause and Correctwe Action "
2 8
8 (11our<'t -
Reador Recon No '
Code
- Codc To Prevent Recurrence '
~1 910301
'F-
'O
.D,
.. 5
.N/A-SF~
. rrrrrr Dup ; matiec Post-Maintenance test, a kak eenlocated on the ducharge a-u u h --
line of 2Pirft, resideal heat rencil pump,was identifwd, plaang the onit in a 24-hcor ILO i
(TX113.3.2a). 'Ibe leak was s.b+ Gy weMed, tested, and the equipment was returned to operability status.
I j
i I'
t ci i
8
'F: Forced
' Reason-Method: ~
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain)
.1 - Manual for preparation of.
}
l
' B '- Maintenance or Testing 2 - Manual Scram data ents, sheets C - Refueling'.
~. 3 - Automatic Scram E LER file (NUREG-0161) -
D - Regulatory Restriction 4 - Continuation of l
E - Operator Training &~-
Previous Shutdown Licensing Exam 5 - Reduced Load
.t I
et w m 2sb l
(03-90) c
~
~
aa.
u;,z,
-.,, p
._.m f l6Lif e-t DOCKET ~No.-
50-301-
' UNIT:NAMEe Point' Beach Unit 2 DATEl
- April: 3, 1991
- COMPLETED BY
.D.-C.
Peterson-TELEPHONE.
414/755-2321:
- UnitL2 operated at approximately 499 MWe net throughout this report period with-no significant load reductions.
On March 11,.an Unusual Event was. declared. based on initiation of
- a_ shutdown ~ required by-Technical Specifications due to loss of engineered: safety equipment.
A discharge instrumentation line
- leak was -identified 'cn1 2P10B, residual heat removal pump.
When s
the 24-hour LCO expired, the Unit 2 power level was reduced to 17%.
The ~ 1eak tests ;and system :13 neup were subsequently completed;-*:'^te; Unusual: Event was then terminated; and Unit 2-returned-to t00% power.-
Safety-related-maintenance-included low speed alarm repair on
~ 2P2ALand 2E2B, charging pumps.
i:
L
_5
,