Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
g- ..
Wisconsin \
Electnc !
POWER COMPANY -l
_ 231 W tAchvan. PO Box 2046< Mdwoukee. WI 53201 - (414)221-2345 1
VPNPD-91-116 NRC-91-0033 April 9, 1991 '
U. S. NUCLEAR REGULATORY COMMISSION Document Control-Desk :
Mail Station P1-137 i Washington, D. C. 20555 Gentlemen: !
,; DOCKETS-50-266 AND-50-3Q1 l
- t40NTHLY OPERATING REPORTH POINT BEACH NUCLEAR PLAQT. UNITS 1 AND.a Attached are monthly operating. reports for Uni s 1 and 2, R Point Beach Nuclear Plant, for the calendar month of March 1991.
Very truly yours,
, '7
/j, ji ^
bb(./ ,[
p C. . W.-Fpy G lt Vice President Nuclear Power .
' Attachments Copi'es ;to _ L. - L. -Smith, PSCW
.NRC Regional Administrator, Region III NRC Resident Inspector 9104160377 DR ADOCK 05000 6 91033 -
f-
~
l PDR ^/
!j i ilsubWim ofWnymbilhem Oxrrw6m
-- ^ . , . . . . <.
w
'.P OPERATING DATA REPORT -
DATE April 5, 1991 COMPLETED BY D. C. Peterson s TELEPHONE 414/755-2321 OPERATING STATUS NO1ES
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UhIT 1 .
- 2. REPORTING PERIOD: MARCH 1991 .
- 3. LICENSED T9ERMAL POWER (MWT): 1518.5 .
- 4. NAMEPLATE RATI!C (GROSS MWE): 523.6 .
- 5. DESIrN ELECTRICAL RATING (NET MWE): 497. .
- 6. MAXIMoM DEPENDABLE CAPACITY (GROSS MWE): 509. .
- 7. MAXIMUM DE" 'NDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
- 8. 1F CHANGE 2 CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCF LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER 1.YVEL TO WHICN RESTRICTED, IF ANY (NET MWE): NOT APPLICABL'
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH Yt TO DATE CUMULATIVE 744 2,160 178,824 l
- 11. HOURS IN ' PORTING PERIOD 2,160.0 147,927.5 744.0
- d. NUMBER OF hJURS REACTOR WTS CRITICAL 0.0 652.7 0.0 i 13. REACTOR RESERVE SHUTDOWN HOURS 2,160.0 145,063.5 744.0 f 14. HOURS GENERATOR ON LINE 0.0 837.9 0.0
- 15. UNIT RESERVE SHUTDOWN HOURS 3,275.561 202,682,256 1,128,466
- 16. GROSS The.? MAL ENERGY GENERATEL (MWH) 68,415,740 383,960 2,113,360
- 17. GRO ? .LECTRICAL ENERGY GENEPATED (MWH) 1,067,386 65,188,426 368,154
- 18. NET L2G tCAL ENERGY GENERP IED (MWH) 100.0 81.1 100.0 f 19. UNIT S*.R '!CE FACTOR 100.0 81.6 200.0 l 20. UNIT AVAILABIL'.TY FACTOR 101.9 74.8 102.0 l 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.4 73.3 99.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 1.7 O.0
- 23. UNIT FORCED 03TAGE RATE
- 24. SHUTDOWNS SCH?.LUIJD OVER NEXT 6 CN . ..S (TYPE, DATE, ASD DURATION OF EACH):
- Fort' -two day rebelina and maintenance octage scheduled to start April 5, IS31.
1
- 25. IF SHUTDOWN AT END OF' REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN !
DATA REPORTED AND FACTORS CALCULATED AS REQUE% ED IP! JRC LETTER DATED SEPTEMBER 22, 3977
a POINT BEACII NUCLEAR PLANT ^ DOCKET NO. 14N -
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit I .
MONTH MAnCII - 1991 DATE Apri! 4.1991 COMPLETED BY _D. C. Peterson -
TFT FPHONE 414n55-2321 -
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWT_R 7.dVEL POWER LEVEL MWe NET DAY MWe NET DAY MWe NUT DAY 493 21 494 1 494 11 405 22 496 2 4% _
12 496 23 496 3 495 13 496 24 495 6 496 14 495 25 495 5 495 15 16 495 26 4%
v3 496 495 17 478 27 4% . l 7
496 28 494 8 495 18 9 496 19 495 29 _. M6 495 30 496 10 499 20 31 496 l
P11F402Sa (03-90)
POINT BEACH NUCLID,R PLANT Docket No. J1-266 ,, _-
Uni Nrane Point Beach. Unit 1 .
UNIT SittJTDOWNS AND POWER PE_I))U%b.S Dat Arvril 2.1991 -
Cor pleted By D. C. Peterson -
REPORT MONTII MARCH - 1991 Tel:pbone No. 414D55-232L Ext. 361 .
i Method of Shutting
( .
No. Date Type' Duration Reason- Down Licensec Event System Component Cause and Correcthe Action
,(II, urs) Reactor 3 Retwe No. Code' Code' To Prevent Recurrence l
i l
l i
I 1
l l
l' l
t 2
F: Forced Reason- 'Methed- ' Exhibit G - Instructions S: Scheduled A - Equipment E-ilure (explain) 1 - Mameal for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatog Restriction 4 - Continuation of E - Operator Training & Previous ShutdowTi Licensing Exam 5 - Reduced Load F - kiministrative 6 - Other (explain) ' Exhibit I - Same .>ource G - Operational Error (explain)
II - Other (explain)
PilF-CD2Sb (03-%)
s
l .
' DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE April 6, 1991 COMPLETED BY D. C. Peterson TELEPHONE 414/755-2321 Unit 1 operated at approximately 494 MWe net throughout this report period with no significant load reddctions.
On March 17, C7 and K9 control rods, Bank D, were declared out of service due to faulty indication; surveillance was increased per T.S.15.3.10.D.3. The control rods were returned to service later the same day.
On March 19 an Emergency Plan Exercise was conducted during off hours.
Safety-related maintenance included repacking of P32A, service water pump.
i OPERATING DATA REPORT -
DOCKET NO. 50-301 ,
DATE April 5, 1993 COMPLETED BY D. C. Peterson TELEPHONE 414/755-2321 OPERATING STATUS . . . . . . . . . .
. . . . . . . . . . . . . . q,.
POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES
- 1. UNIT NAME: .
- 2. REPORTING PERIO3: MARCH 1991 .
- 3. LICEdSED THERMAL N)WER (MWT): 1518.5 .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 4?7. .
509. .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): . . . . . . .
485 . . . . . . . . . . . . . . . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPOP.t, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICAE LE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THI's MONTH YR TO DATE CUMULATIVE 744 2,160 163,609
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 143,244.5
- 12. NUMBET: OF HOURS REACTOR WAS CRITICAL 0.0 216.7 0.0
- 13. REACTCR RESERVB SHUTDOWN HOURS 2,160.0 141,079.4 744.0
- 14. HOURS GENERATOR .ON IINE O.0 0.0 302.2
- 15. UNIT RESERVE SHUTLOWN HOURS 3,264,256 201,428,667 1,117,097
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,121,080 68,418,340 383,250
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 367,107 1,074,094 65,206,160 l 18. NET ELECTRICAL ENERGY GENER?TED (MWH) 100.0 100.0 86.2
- 19. UNIT SERVICE FACTOR 100.0 86.4 100.0
- 20. UNIT AVAILABILITY FACTOR 102.5 81.5 101.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.3 100.1 80.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) O.0 0.0 1.1
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NE7T 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
1991.
i
- Forty-two day refueling nnd maintenance outage scheduled to start September 27, l
l
- 25. IF SHUTDOWN AT END OF REPOtT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN IN NRC LETTER DATED SEPTEMBER 22, 1977 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED
POINT BEACil NUCLEA.R PLANT DOCKEPNO. 50-301 -
UNIT NAME Point Beach. Unit 2 -
AVERAGE DAILY UNIT POWER LEVEL .
DATE April L 1991 .
MONTII MARCH - 1991 COMPLETED BY D. C. Peterson TELEPIIONE 414/755-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL j POWER LEVEL DAY MWe NET i
DAY MWe NET DAY MWe NET 499 21 499 305 11 1
22 501 12 501 2 500 23 500 13 502 3 500 24 500 14 503 4 500 25 500 15 501 5 500 26 500 16 501 6 501 27 500 17 500 7 500 28 497 18 500 8 500 29 500 19 500 9 501 30 500 20 500 10 505
\
31 483 l'BF402Sa (Ok90)
g: _
.~ -
r[ -
. POINT BEACII NUCLEAR PLANT ~ . Docket No. 50-301 _- c Unit Name Point' Beach. Unit 2' -
I' UNIT S110TDOWNS AND IMsWER REDUCTIONS .- Date Ar ril 5.1991 ~- -',
.. ' Completed By D. C. Peterson ' i-1
, ( REPORT MONTil - ' MARCH -' 1991 - ( Telephone No. ' 414/755-232L En. 361 - '*:
v IMethod of.
-- Shutting
- No. , Date Type' - Dur tion Reason2 ' Down-l Ixensee I%ent ' ' System _ Component Cause and Correctwe Action "
' (11our<'t - Reador8 Recon No ' Code
- Codc 8 To Prevent Recurrence '
. rrrrrr u h --
~1 910301 'F- 'O .D, .. 5 .N/A- SF~ Dup ; matiec Post-Maintenance test, a kak eenlocated on the ducharge a-u line of 2Pirft, resideal heat rencil pump,was identifwd, plaang the onit in a 24-hcor ILO i (TX113.3.2a). 'Ibe leak was s.b+ Gy weMed, tested, and the equipment was returned to operability status.
I i
I t
ci i
8
, 'F: Forced ' Reason- Method: ~ ' Exhibit G - Instructions !
S: Scheduled A - Equipment Failure (explain) .1 - Manual for preparation of .
l ' B '- Maintenance or Testing 2 - Manual Scram data ents, sheets C - Refueling' . ~. 3 - Automatic Scram E LER file (NUREG-0161) -
D - Regulatory Restriction 4 - Continuation of E - Operator Training &~- Previous Shutdown _
Licensing Exam 5 - Reduced Load !
.t I
et w m 2sb
, (03-90) -
c ~ .
. ~ aa. u;,z , - ., , p , - _
.. _ ._ _ . . . _ . _ . - ._.m - _ . .. . _ . _ . . _ . . _ , _ . _ - . , - _
f l6Lif e-t DOCKET ~No.- 50-301-
' UNIT:NAMEe Point' Beach Unit 2 DATEl - April: 3, 1991
- COMPLETED BY .D.-C. Peterson-
- TELEPHONE. 414/755-2321: >
- UnitL2 operated at approximately 499 MWe net throughout this report period with-no significant load reductions.
On March 11,.an Unusual Event was. declared. based on initiation of
- a_ shutdown ~ required by-Technical Specifications due to loss of engineered: safety equipment. A discharge instrumentation line s
- leak was -identified 'cn1 2P10B, residual heat removal pump. When the 24-hour LCO expired, the Unit 2 power level was reduced to 17%. The ~ 1eak tests ;and system :13 neup were subsequently completed;-*:'^te; Unusual: Event was then terminated; and Unit 2-returned-to t00% power.-
Safety-related-maintenance-included low speed alarm repair on
~ 2P2ALand 2E2B, charging pumps.
i:
L
_5
-, - _ _ . . . . ,, .- ,