ML20072R807

From kanterella
Jump to navigation Jump to search
Responds to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Develop & Conduct Training Sessions Specifically Addressing Reportability by End of First Quarter of 1991,requesting Date Be Extended to 910630
ML20072R807
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/28/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9104080150
Download: ML20072R807 (2)


Text

I" 11 I

t ue % v com; e us:<mu.

ut.u. rmtw n v.;:

v,,, nr.,,,a l' U lim l%*

k h e opewwrn Cha Iv!!n A l','@j lin?

t?ct a ?1 <t;l DUKE POWER March 28, 1991 U.S. Nuclear Regu'lat.ory Conmission WITN Document Control Des's Washington, D.C. 20555 i

Subj ect McGuire Nuclear Station Docket. Non, 50 369, 370 Renponr.c Ao Vio.lation 50- % 9, 370/90-11-03 Gentlement In the reip no to the abovo reienneed violation Duke Power Company committed nat the Operations and Compliance groups would cooperatively develop and conduct a training sessicr t.o specifically address the reportability by the end of the first quarter of 1991. Ve are requesting that this dato be extended to 6/30/91-The reason for this request is to allow for proper and complete impi-1.ation of prograrr -

developed to address the report ability issues at n Julre.

O,lginally, the intent yas to formu14.to a Desson plan to bc *,ght to all SR0s.

llowever, the Compliance 32* p haA comploted deve ent of an i

addit lon to the Corspliance Manual (S4 etton 2.4) and Operattoru.is developing an Operations Management Procedure (OHy) to parallel the Compliance Manual Section 2.4.

This new OMP that addresses 10 CFd 50.72 reporting will be covered wit.h all SR0s by 07.irations management and/or Compilance by the new dato.

Furthermore, t hb new OMP will be reviewed p6riodically by all SR0s as part of the licensed operator requal program.

i Should ther a be any quest.lons concerning this mat ter, contact L.J. Rudy at (704) 373-3413.

l-Very truly yours, t-

]%.b g

h v4 % n M.S. Tuckman IJR/s f

y,gpoMMW$h' O

~..

.........-~

.. = - -.. -

-r m

Document Control Desk Page 2 March 28, 1991 xet Mr. S.D. Ebneter Regional Administratot, Region 11 U.S. Nuclear Regulstory Comission 101 Marlotta St., NW, Suit e 2900 Atlanta, Georgia 30323 Mr. T.A. Reed U.S. Nuclear Regulatory Comission Offico of Nuclear Reactor Regulation One White Flint North Hall Stop 9113 Washington, D.C. 20555 Mr. P.K. VanDoorn NRC Senior Resident Inspector

.McGuire Nuclear Statien l

i.

... _ _,, _