ML20072P912

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-61 Re Reactor Coolant Pump diffusor-ring Cap Screws Failure.Extension Until 830518 Envisioned for Next Rept
ML20072P912
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/17/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23278-RQT, DER-82-61, NUDOCS 8304040414
Download: ML20072P912 (2)


Text

? ?DS'<TD 4

Docket Nos. 50-528/529/5300 50.55(e)@eptMt,., m w.-., 7 g,

Arizona Public Service Company cij Q [

P o. Box 21666. PHOENIX, ARIZONA 85036 vc3 l$ 2n0 March 17, 1983 ANPP-23278-RQT/BSK ggou o U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 i

Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-61 A 30.55(e) Potentially Reportable Deficiency Relating to Reactor Coolant Pump Diffusor-Ring Cap Screws F ay Fail And Damage Pump File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on October 21, 1982 (B) ANPP-22368, dated November 22, 1982 (Interim Report) 1 (C) ANPP-23026, dated February 16, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by March 29, 1983.

  • )

Due to the extensive evaluation required, it is now expected that'this information will be finalized by May 18, 1983, when a complete report will be submitted.

l There is no change to the Interim Report at this time.

Very truly yours, A

1 k,

CLQ LLL(%

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT:db r

cc: See Attached Page 2

(

B304040414 830317 PDR ADOCK 05000528 S

PDR

n i

e, U. S. Nuclear Regulatory Commission'.

March 17, 1983 Attention:

Mr. D. H. Sternberg, Chief

.ANPP-23278-RQT/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini

-J. R. Bynum A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees P. P. Klute/D. D. Green A. C. Gehr

.W. J. Stubblefield.

W. G. Bingham R.'L. Patterson 1

R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli 4