Interim Deficiency Rept DER 83-9 Re Low Pressure Safety Injection Pump a Suction Strainer Containing Foreign Matl & Torn Pump B Strainer.Initially Reported on 830216. Investigation Continuing.Final Rept on 830512
ML20072P834
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/14/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23238-RQT, DER-83-9, NUDOCS 8304040388
Download: ML20072P834 (3)


Text

r Docket Nos. 50-528/529/530 50.55(e) Report Arizona Public Service Company E[,'U j

P.o. box 21666. PHOENIX, ARIZONA 85036 Mateig J'4.2 783p; l: Oc ANPP-23238-E,QT/BSK U. S. Nuclear Regulatory Commission 0' Q D %'.'

d

-Region V Creekside-Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Interim Report - DER 83-9 A 50.55(e) Potentially Reportable Deficiency Relating to Unit 1 LPSI Pump "A" Suction Strainer Contains Foreign Material, And Pump "B" Strainer Is Torn File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between T. Young and G. Duckworth on February 16, 1983

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by May 12, 1983, at which time a complete report will be submitted.

Very truly yours,

\\

CC

~

L

-L.

CLLLA

'ALL(

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT:db Enclosure cc: See Attached Page 2 L

dx

(

8304040388 830314

{DRADOCM 05000528 PDR

I i

U. S. Nuclear Regulatory Commission' March 14.-1983-h Attention:- Mr. D. M. Sternberg, Chief '

' ANPP-23238-RQT/BSK -

Page 2 i

cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S._ Nuclear Regulatory Commission-Washington, D. C. 20555.

T. G. Woods, Jr.

J. A.'Roedel D.

B.' Fasnacht G. C. Andognini' J. R. Bynum

'A. C. Rogers.

B. S.~Kaplan W. E. Ide J. Vorees P.' P. Klute/D. D. Green

'A. C.'Gehr W. J. Stubblefield-W. G. Bingham R. L'. Patterson R. W. Welcher-R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Florelli 9

A-i INTERIM REPORT - DER 83-9 POTENTIAL REPORTABLE DEFICIENCY

-ARIZONA PUBLIC SERVICE COMPANY (APS)

L PVNGS UNIT 1-

'I.

POTENTIAL PROBLEM Startup Quality Assurance Stop Work Notice S-83-005 documents twoL(2) findings regarding the cleanliness level.of the Low Pressure Safety Injection (LPSI) system as follows:

1.

A substantial amount of foreign material (purge dam material, etc.) was discovered in the. suction strainer for Low Pressure

Safety Injection Pump (LPSI) 1MSIAP01 after operation.

2.

A. torn suction strainer for Low Pressure Safety Injection Pump (LPSI) 1MSIBP01 was discovered. The torn strainer indicates that a foreign object may have entered the LPSI pump.

The. reliability of the LPSI systea is consequently indeterminate, and continued operation without corrective action could result in possible damage to the LPSI pumps.

-II.

APPROACH TO AND STATUS OF PROPOSED' RESOLUTION Damage to the suction _ strainer _of LPSI Pump 1MSIBP01 has been evaluated and is currently being replaced with a better design.

Bechtel Engineering is performing an investigation to determine the cause of entry of foreign material into the LPSI system.

III. PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBillTTAL OF Tile FINAL REPORT Evaluation of_this condition and submittal of the Final Report is-forecast to be completed by May 12, 1983.