Interim Deficiency Rept DER 82-81 Re R-class Instruments Installed in Lieu of Q-class in Diesel Generator Bldgs.Due to Extensive Evaluation,Next Rept Expected by 830421
ML20072P743
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/15/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23255-RQT, DER-82-81, NUDOCS 8304040365
Download: ML20072P743 (2)


Text

.

Docket Nos. 50-528/529/530 2

50.5EleJ.. Report ia,av a UK0 Arizona Public Service Company P.O. BOX 21666. PHCENIX ARIZONA 85036u3ltG 21 C g e.

March 15, 1983 ANPP-23255-RQT/BSK FIw;TL U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368

^

Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-81 A 50.55(e) Potentially Reportable Deficiency Relating to R-Class Instruments Were Installed In Lieu Of Q-Class In Units 1 and 2 Diesel Generator Buildings File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between P. Narbut and G. Duckworth on December 22, 1982 (B) ANPP-22779, dated January 19,1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by March 15, 1983.

Due to the extensive evaluation required, it is now expected that this information will be finalized by April 21, 1983, when a complete report will be submitted.

There is no change to the Interim Report at this time.

Very truly yours, h

h L L A._

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director l

EEVBJr/RQT:db cc: See Attached Page 2 l

(

8304040365 830315 PDR ADOCK 05000528 S

PDR

M a..q ;

+

U.-S. Nuclear Regulatory. Commission.

March 15, 1983

. Attention:

Mr. D. M. Sternberg, Chief

. ANPP-23255-RQT/BSK Page 2 cc: Richard De' Young, Director Office of Inspection and Enforcement b

U.-S. Nuclear Regulatory Commission.

Washington, D. C. 20555 T.'G. Woods, Jr.

J. A. Roedel D. B. Fasnach't, G.-C. Andognini J. R. Bynum

-A. C. Rogers B.'S. Kaplan-W. E. Ide J. Vorees P. P. Klute/D. D. Green A. C. Gehr

.W. J. Stubblefield-W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E..Vorderbrueggen G. A. Fiorelli O

h