Unit 2 PBAPS LIMITING' CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS L3.7.A ' Primary Containment (Cont'd.)
4.7.A Primary Containment (Cont'd.)
L,,= measured ILR at 25 psig (P,)
L,= measured ILR at 49.1 psig (P,), and L**
$ 0.7, otherwise La L,
= La ( P,/ P,) 1/2 where La = 0.5 percent of the primary containment volume per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at 49.1 psig P,
= peak accident pressure (psig)
P,
= appropriately measured test pressures (psig)
- c. The ILRT's shall be performed at the following minimum frequency:
1.
Prior to initial unit operation.
- 2. - After the preoperational leakage rate tests, a set of three Type A tests shall be performed at approximately equal intervals during each 10 year service period.*
These intervals may be extended up to eight months if necessary to coincide with re-fueling outage,
- d. The allowable leakage rates, L,and L",
shall be less than 0.75 L, and 0.75 L, for the reduced pressure tests and peak pressure tests, respectively.
- Except for third Type A test in the second 10 year service period, which will be performed during the PBAPS, Unit 2 refueling outage 11 currently scheduled for September 1996.
9409080195 940828
-167-PDR ADOCK 05000277
'P PDR
- _