Proposed TS Page 167,providing Exception That Third Type a Test in Second 10-yr Svc Period Will Not Be Performed & That Test Will Be Performed During Facility Refueling Outage 11, Currently Scheduled for Sept 1996
ML20072P734
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/28/1994
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20072P733 List:
References
NUDOCS 9409080195
Download: ML20072P734 (1)


Text

. _.

Unit 2 PBAPS LIMITING' CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS L3.7.A ' Primary Containment (Cont'd.)

4.7.A Primary Containment (Cont'd.)

L,,= measured ILR at 25 psig (P,)

L,= measured ILR at 49.1 psig (P,), and L**

$ 0.7, otherwise La L,

= La ( P,/ P,) 1/2 where La = 0.5 percent of the primary containment volume per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at 49.1 psig P,

= peak accident pressure (psig)

P,

= appropriately measured test pressures (psig)

c. The ILRT's shall be performed at the following minimum frequency:

1.

Prior to initial unit operation.

2. - After the preoperational leakage rate tests, a set of three Type A tests shall be performed at approximately equal intervals during each 10 year service period.*

These intervals may be extended up to eight months if necessary to coincide with re-fueling outage,

d. The allowable leakage rates, L,and L",

shall be less than 0.75 L, and 0.75 L, for the reduced pressure tests and peak pressure tests, respectively.

  • Except for third Type A test in the second 10 year service period, which will be performed during the PBAPS, Unit 2 refueling outage 11 currently scheduled for September 1996.

9409080195 940828

-167-PDR ADOCK 05000277