Forwards Application for Amend to License NPF-69,revising TS 3/4.6.1.3, Primary Containment Air Locks to Allow Continued Plant Operation If Interlock Becomes Inoperable as Long as Operable Door Locked Shut & Periodically Checked
ML20072P607
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/26/1994
From: Sylvia B
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072P610 List:
References
NMP2L-1492, NUDOCS 9409080098
Download: ML20072P607 (2)


Text

..

l M Y NIAGARA RUMOHAWK NIAGARA MOHAWK POWER CoRPoRAT1oN/NINE MILE POINT PO. BOX 63. LYCOMING, NY 13093/ TELEPHONE (315) 349-2882 B. Ralph Sylvia Emscutive Vice President NuclIar August 26,1994 l

NMP2L 1492 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Gentlemen:

Niagara Mohawk Power Corporation hereby transmits an Application for Amendment to Nine Mile Point Unit 2 Operating License NPF-69. Also enclosed are proposed changes to the Technical Specifications set forth in Appendix A to the above mentioned License.

Supporting information and analyses demonstrating that the proposed changes involve no significant hazards consideration pursuant to 10 CFR 50.92 are included as Attachment B.

The proposed Technical Specification changes contained herein represent a revision to Specification 3/4.6.1.3, " Primary Containment Air Locks." Specification 3/4.6.1.3, in part, requires that the interlock mechanism associated with each primary containment air lock be verified operable every six months. These interlocks prevent primary containment air lock doors in the same penetration from being opened simultaneously. Niagara Mohawk proposes to revise Specification 3/4.6.1.3 to allow continued plant operation if an interlock becomes inoperable as long as an operable door is locked shut and periodically checked as being locked shut. Locking an operable door shut assures that at least one air lock door is closed and provides the intended function of the interlock mechanism. With the existing Specification, an inoperable interlock could result in an unnecessary plant shutdown. The proposed changes are consistent with NUREG-1433, " Improved Standard Technical Specifications."

The next emergency air lock interlock test is scheduled to be performed no later than November 13,1994, or with the 25 percent extension, December 29,1994. Because of the current emergency air lock configuration, performance of the interlock test would result in a loss of containment integrity and require a plant shutdown. Approval of this Application for Amendment would allow continued plant operation. Therefore, approval is requested by December 1,1994, to provide Niagara Mohawk sufficient time to implement the app oved Amendment and to avoid a plant shutdown.

'A c.w -

9409080098 940826 4

PDR ADOCK 03000410 l

P PDR j

Page 2 Pursuant to 10 CFR 50.91(b)(1), Niagara Mohawk has provided a copy of this license amendment request and the associated analyses regarding no significant hazards consideration to the appropriate state representative.

Very truly yours, h/

b B. Ralph Sflvia Exec. Vice President - Nuclear JMT/Imc xc:

Regional Administrator, Region I Mr. M. L. Boyle, Acting Director, Project Directorate I-1, NRR Mr. D. S. Brinkman, Senior Project Manager, NRR Mr. B. S. Norris, Senior Resident Inspector Ms. Donna Ross Division of Policy Analysis and Planning New York State Energy Office Agency Building 2 Empire State Plaza Albany, NY 12223 Records Management