Requests That Insp Program Re IE Bulletin 80-13, Cracking in Core Spray Spargers, Be Performed Every 3 Yrs in Conjunction W/Reactor Vessel Internal Insp.No Abnormalities Noted Per Subj Bulletin
ML20072P471
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/25/1983
From: Rybak B
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 6268N, IEB-80-13, NUDOCS 8304040268
Download: ML20072P471 (2)


Text

_ .

"T i, , *' '

/'^N Commonwealth Edison

') One First National Plaza. Chicago, Ilhnois l

C/ Address R: ply to: Post Office Box 767

'[' Chicago, Illinois 60690 March 25, 1983 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road

. Glen Ellyn, IL 60137

Subject:

Dresden Station Units 2 and 3 Response to I.E.Bulletin 80-13

" Cracking in Core Spray Spargers'-

NRC Docket No. 50-237/249 Reference (a): J. G. Keppler letter to Cordell Reed dated May 12, 1980.

(b): T. J. Rausch letter to J. G. Keppler dated January 23, 1981.

(c): E. D. Swartz letter to J. G. Keppler dated May 4, 1982.

(d): E. D. Swartz letter to J.-G. Keppler dated October 28, 1982.

Dear Mr. Keppler:

Reference (a) transmitted I.E.Bulletin 80-13, which identified

-instances of cracking in Core Spray Spargers at BWR facilities. On January 19, 1983, we conducted an inspection of both the upper and lower core spray spargers on our Dresden Unit 2. No abnormalities were noted.

This Unit 2 inspection completes the third inspection of Core Spray Spargers at our Dresden Nuclear Station (previous inspections were Unit 2-1981, Unit 3-1982). No evidence of cracking was identified during during the conduct of the above described inspections. Due to favorable results, and the fact that one day of critical path time in the refueling outage schedule-is required to perform each inspection, it is our belief that the frequency of'these inspections should be reduced.

8304040268 830325 PDR ADOCK 05000237 MAR 2 91983 (

G PDR [

t __ _ _ -

.c J. G. Keppler March 25, 1983 It is Commonwealth Edison's request that the Core Spray Sparger inspection program be performed every three (3) years in conjunction with the reactor vessel internal inspection required by our ISI program (ASME Section XI) in lieu of I.E.Bulletin 80-13. We have made a similar request for relief for Quad Cities Station Units 1 and 2 (Reference (d)).

We would like a written response accepting or rejecting this request.

Please address any questions you many have concerning this matter to this office.

Very truly yours,

)

~

B. R k Nuclear Licensing Administrator 1m

-cc: NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 NRC Region III Inspector - Dresden R. Bevan - NRR R. Gilbert - NRR t