ML20072P144
| ML20072P144 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/28/1983 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| U-0625, U-625, NUDOCS 8304040112 | |
| Download: ML20072P144 (2) | |
Text
. - -.
-~
e N.
THinnis Power Compemy u-o625 T.30-83(03-281-L 500 SOUTH 27TH STREET, P. o. BOX 511. DECATUR, ILLINOIS 62525-1805 Docket No. 50-461 March 28, 1983 1
Director of Nuclear Reactor Regulation Attention:
Mr.-A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subj ect :
Clinton Power Station Unit 1 Application of ASME Code Cases Illinois Power Company intends to make use of ASME Code Cases N-341 and N-356, approved June 17, 1982, and June 16, 1982 respectively, to extend the certification period of Level III examiners to five years.
We request NRC approval for use of ASME Code Cases N-341 and N-356 at the Clinton Power Station for the following intended applications:
N-341 To extend Level III examiner's certifications to five (5) years for ASME Section III, Divisions 1 and 2.
N-356 To extend Level III examiner's certifications to five (5) years for ASME Section XI, Divisions 1, 2, and 3.
}0N R304040112 830328 PDR ADDCK 05000461 A
PDR 4
T
+
s U-0625 L30-83(03-28)-L March 28, 1983 Page 2 Please advise us as soon as possible if you have any questions on our requnst to use these code cases.
Sincerely, Ad G. E. Wuller Supervisor-Licensing.
Nuclear Station Engineering GEW/lt cc:
Dr. H. Abelson, NRC Clinton Proj ect Manager Mr. H. H. Livermore, NRC Resident Inspector Illinois Department of Nuclear Safety