' Alabama Power Company 600 North 18th Street Post OffioD Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
%:' et;%'"'
AlabamaPower
/
the southern ekCtic system July 8, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requesting NRC Approval Gentlemen:
Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983.
This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.
If you have any questions, please advise.
Yours very truly, 9V E
F. L. Clayton, Jr FLCJr/GGY:Ish-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly j
g Mr. E. A. Reeves T
g Mr. W. H. Bradford O
Dr. I. L. Myers jL B307100'095 830708 PDR ADOCK 05000348 R
ATTACMENT Page 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8,1983 P90 SED ACRN.
REIRESTED ACTUAL APco APco mC mC S SIITTM.
SAMITTE
ROGUlKS
- 1. Movable Contml Rod Assetlies for 02-22-83 03-04-83 07-15-83 49951 Note 1 FtP1and2(T.S.3/4.1.3) 06-03-83 49952
- 2. Charcoal Filters for FIP 1 and 2 03-01-83 03-04-83 09-01-83 49953 APCo to (T.S. 4.7.7, 4.7.8 and 4.9.14) 49954 appeal the initial EC conclusions which are based on the pmposed withdrawal of Generic Letter 83-13.
- 3. River Water Systen for FNP 1 and 2 N/A 12-30-82 07-01-83 OVERl1E 49374 See iten 6, (T.S.3/4.7.5) 49375 page 7
- 4. Diesel Generator Overload Test for N/A 08-03-82 07-01-83 49374 FfP1and2(T.S.4.8.1.1.2.c.5) 12-30-82 10-01-83 49375 06-03-83
- 5. BIT Reduction for F?P 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A (T.S.3/4.5.4) 03-04-83 03-18-8
- 6. Turbine Valve Surveillance for FtP 2 N/A 10-08-82 12-01-82 NRC letter 48973 APCo appeal (T.S.3/4.3.4) 12-10-82 of 04-29-83 meeting 01-1tM3 stated NRC scheduled 05-31-83 position.
for July 13, 1983.
- 1. The % day Federal Register notification mquirement of 10 CFR 50.92 may delay NRC approval of this iten.
- 2. Delay of approval could precipitate a special outa9e.
- 3. Delay of appmval will adversely affect the FNP 2 Refueling Outage in Septenter 1983.
- 4. July 8,1983 sutrnittal requested approval of mvised program by Septenter 1,1983.
- 5. Supplanented by two letters dated June 20,198 and nede part of May 3,1983 sutrnittal by APCo letter dated June 29, 1983.
- 6. Delqy of approval could preclude startup of each unit after mfueling.
~
ATTACMENT Pa9e 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8, 1983 PRFOSED EiWL REIK5TED ERM.
APco APco Mc NC SlBGTTAL SBGTTAL
/PPRNAL APPROVA. TAC ITEM MTE MIE MTE MIE 10.
REMMKS
- 7. RCS Pressure Isolatim Valves N/A 08-10-82 07-01-83 OWEMIE 48714 See iten 7, for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 48715 page 8 and3/4.4.7.3)
- 8. Mechanical Snubber Functional Test N/A 11-05-82 12-01-82 01-31-83 N/A Exsption for FNP 1 (T.S.4.7.9.e)
- 9. Waste Gas Hydmgen/0rygen Analyzer 12-01-83 06-01-84 for FiP 1 and 2 (T.S. Table 4.3-9)
- 10. ISI/IST Licer. sing Progra
- a. Unit 1 Inservice Inspection (ISI)
Progra for A9E Code Class 1, 2 and 3 Caponents
- 1) Relief Requests on vessel N/A 04-17-81 09-01-83 48559 cladding ex minations 01-10-83
- 2) Relief Requests on hydro-01-18-83 01-28-83 09-01-83 49547 static test mquirsents
- b. Unit 2 Inservice Inspection (ISI) Progra for A9E Code Class 1, 2 and 3 Ca ponents
- 1) Revision 0 Relief Requests N/A 07-25-80 09-01-83 51033 Note 3 06-20-83
- 2) Relief Requests on vessel N/A 01-10-83 09-01-83 49373 tbte 3 cladding ex minations 06-20-83
- 3) Relief Request on hydm-01-18-83 01-28-83 09-01-83 51062 Note 3 static test requirsents.
06-20-83 1.,
The 30 dqy Federal Register notification mqui.went of 10 CFR 50.92 nay delay NRC approval of this iten.
- 2. Delay of appmval could precipitate a special outage.
- 3. Delqy of appmval will adversely affect the FrP 2 Refueling Outage in Septaber 1983.
- 4. July 8,1983 sutrnittal mquested approval of mvised pmgra by Septaber 1,1983.
- 5. Suppleented by two letters dated June 20,1983 and nade part of Mqy 3,1983 sutmittal by APCo letter dated June 29,1983.
- 6. Delay of approval could preclude startup of each unit after refueling.
~
AfTACmENT P;ge 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8, 1983 PR(FOSED EIUAL REIMSD ACluRL APCo AFCo MC IGC SBtITTM.
SDt!TTM.
REMARKS
- c. Unit 1 Inservice Testing (IST)
Progran for AMSE Code Class 1, 2 and 3 Conpanents
- 1) Revision 2 Relief Requests N/A 04-21-80 03-15-83 05-02-83 11277 Note 4
- 2) Revision 3 Relief Requests N/A 07-16-81 03-15-83 05-02-83 11277 Note 4
- 3) Revision 4 Relief Requests N/A 10-25-82 03-15-83 05-02-83 11277 lbte 4
- d. Unit 2InserviceTesting(IST)
Progran for A9E Code Class 1, 2 and 3 Conponents
- 1) Revision 0 Relief Requests N/A 03-12-80 02-15-83 04-08-83 47051 fetes 3 & 4 06-20-83
- 2) Revision 1 Relief Requests N/A 03-17-82 02-15-83 04-08-83 47051 Notes 3 & 4 06-20-83
- 3) Revision 2 Relief Requests N/A 08-06-82 02-15-83 04-08-83 47051 Notes 3 & 4 06-20-83
- 11. Spent Fuel Pool Storage Mditions N/A 03-19-82 11-01-82 04-15-83 N/A for FW 1 05-01-83
- 12. Change 18 Month Interval to 04-01-83 04-05-83 10-01-83 51408 Refueling 51409 13, Meteorological Tower Surveillance 02-01-83 01-24-83 0 M 1-83 51437 APCo to
(
for F W 1 and 2 (T.S. 3/4.3.3.4) 51438 evaluate NRC review.
- 1. The 30 av Federal Register notification mquirenent of 10 CFR 50.92 may dely NRC approval of this iten.
- 2. Dely of approval could precipitate a special outage.
- 3. Dely of approval will adversely affect the FW 2 Refueling Outage in Septenter 1983.
- 4. July 8,1983 subnittal mquested approval of mvised progran by Septerber 1,1983.
- 5. Supplanented by two letters dated June 20,1983 and made part of My 3,1983 subnittal by APCo letter dated June 29, 1983.
- 6. Dely of approval could preclude startup of each unit after mfueling.
7 f
~
ATTACMENT
~
Page 4
,n STATUSOF.1.ICENSINGITEMSREQUIRIG.
NRC APPRO. VAL JULY 8, 1983,
i Ph0 FEED EIM.
REIJESIED E1UAL AP00 NCo NIC. -
NIC SEMITTAL SIAMITTAL'
_' MIE MTE M).
REMRIES
- 14. In-Core Thinbles for FNP 1 and 2 N/A N/A N/A N/A N/A (T.S.3.3.3.2)
- 15. Safety Evaluations for Next Fuel Reloads:
- a. Unit 1 Upflw Modification N/A 08-16-82 N/A N/A N/A
- b. Unit 1 Cycle 5 03-14-83 03-17-83 N/A N/A N/A
- c. Unit 2 Cycle 318 Month Fuel 09-01-83 N/A N/A N/A Cycle
- 16. F delta H and Positive Moderator 09-15-83 02-01-84 Tamerature Coefficient
- 17. Contairment Sprqy N/A N/A N/A N/A N/A
- 18. Technical Specification Optimi-N/A N/A N/A N/A N/A zation Westinghouse Owners Gmup
- 19. Safety Related 8attery Changes 04-15-83 05-03-83 11-03-83 51631 Suppleental 51629 infonnation to be provided in July 1983.
- 20. Rod Swap Test During Low Power 03-01-83 03-01-83 N/A N/A N/A PhysicsTesting
- 21. Rod Drop Timing Ibring Lw Power N/A N/A N/A N/A N/A PhysicsTesting
- 1. The 30 dqy Federal Register notification rtgirment of 10 CFR 50.92 nay delqy NRC approval of this iten.
2 Delqy of approval could precipitate a special outage.
- 3. Delqy of approval will adversely affect the FW 2 Refueling Outage in Septaber 1983.
- 4. July 8,1983 subnittel requested approval of revised program by Septsber 1,1983.
- 5. Suppleented by two letters dated June 20,1983 and ne& part of Mqy 3,1983 subnittal by APCo letter dated June 29,1983.
- 6. Delay of approval could preclude startup of each unit after refueling.
ATTnCMENT Page 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8, 1983 PROPO D EllA.
REQLESD E1UAL Arco Mco mC nc S 96TTM.
SMGTTM.
- PIDft
- PlafM.
RB MKS
- 22. Auto Rod Control Above 9(5 Power N/A 01-11-83 04-01-83 03-24-83 N/A for thit 2 Cycle 2 and thit 1, 09-14-82 12-01-82 Cycle 5
- 23. Unit 2 Licensing Deletior 01-12-83 01-07-83 fyA N/A N/A Anendrent Clarification Letter
- 24. FSAR Update 07-01-83 07-01-83 N/A N/A N/A
- 25. Mninistrative Changes
- a. Accmulator and ECCS Subsysten 02-01-83 02-01-83 09-01-83 49184 for FW 1 and 2 (T.S. 4.5.1.1 49185 (c) and 4.5.2.(a))
- b. Generic Letter 82-17 on Audit N/A 10-25-82 09-01-83 49068 of Energency Plan for FW 1 49069 and 2 (T.S. 6.5.2.8.e)
- c. Mechanhcal and %draulic 06-01-83 05-27-83 09-01-83 49184 Snubber Lists for FNP 1 (T.S. Table 3.7-4A and 3.7-46)
- d. Muinistrative Changes for FW 03-01-83 02-01-83 09-01-83 49184 1 and 2:
49185
- 1) Fire Detectors Table 3.3-12 2 RlR lsolation 4.5.2.d.1 3 River Water Sury 3/4.7.5 4 Yarit Fire %drant Table 3.7-7
- 5) Service Water Battery 4.8.2.5.2(d)5
- 6) Organization 01 art Figure 6.2-2
- 1. The 30 de Federal Register notification requironent of 10 CFR 50.92 may delay NRC approval of this iten.
- 2. Dely of approval could precipitate a special outage.
- 3. Dely of approval will adversely affect the FW 2 Refueling Outage in Septeter 1983.
- 4. July 8,1983 submittal mquested approval of revised progran by Septeter 1,1983.
- 5. Suppleiented by two letters dated June 20,1983 and nede part of My 3,1983 submittal by APCo letter dated June 29, 1983
- 6. Dely of approval could preclude startup of each mit after refueling.
l
ATTACIMENT Page 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8,1983 PIG OSED ERM.
RFUESTED ACUL APCo AFCo a
rec SLAMITTAL SLAMITTE
REMMKS
- e. Unit 2 Pre:surizer Sensor Table 03-01-83 02-01-83 09-01-83 49185 (T.S.3.3.3.7)
- f. Unit 1 Refueling Outage Change: 03-01-83 02-01-83 09-01-83 49184 Contaiment Vent
Incorporation of Licensing N/A 11-24-82 09-01 49182 Require 1ents for FNP 2
- 1) FNP 2 License Condition 2.C.(17) - Contaiment Vent Line
- 3) FfP 2 License Condition 2.C.(19)(b)-Containment Overcurmnt Protection
- 1. Organization 01an9e to Offsite N/A 11-16-82 09-01-83 49184 lenagenent for FNP 1 and 2.
06-29-83 49185 l,
- 1. The 30 dqy Federal Register notification requirenent of 10 CFR 50.92 may delay NRC approval of this iten.
- 2. Delqy of approval could precipitate a special cutaphueling Outage in Septeter 199.
- 3. Delay of approval will adversely affect the Ffe 2 Re
- 4. July 8,1983 subnittal requested appmval of revised program by Septeter 1,1983.
- 5. Supplemented by two letters dated June 20,1983 and aede part of May 3,1983 submittal by /PCo letter dated June 29, 1983.
- 6. Delqy of approval could preclude startup of each unit after mfueling.
9
~
ATTACIMENT Page 7 LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JANUARY 13, 1983 LETTER JULY 8,1983 PIGOSED ACML REIMSTED ACTUAL APCo
REMRKS
- 1. Mninistrative Changes N/A 02-01-83 09-01-83 49184 49185
- a. Engineered Safety Actuation Systen Instrunentatim ACTION Statenent 20 Error
- b. Security Plan Audit Frequency
- c. Environnental Qualification (FNP1)
- d. Augtented Low Power Test Progran (FtP 2)
- 2. Turbine Valve Surveillance N/A 05-27-83 07-29-83 51473 One-TineChange(T.S.3/4.3.4) 06-20-83 08-01-83 for FrP 2
- 3. Snubber Visual Inspectim 06-17-83 06-17-83 10-01-83 51891 tbte 2 (he-Tine Change (T.S. 3/4.7.9) 06-20-83 07-08-83
- 4. Envirormental Qualification N/A 05-20-83 Unit 2 2nd tbte 6 Exetption Request R.0.
Unit 15th R.O.
- 5. Multiplant Action Iten B-32 N/A 04-06-83 09-01-83 49184 49185
- 6. River Water Systen One-Tine N/A 06-20-83 08-03-83 51892 rete 2 Technical Specification (hange 06-20-83 51893 See iten 3, 06-29-83 page 1
- 1. The 30 de Federal Register notification mquirstent of 10 CFR 50.92 nay dely NRC approval of this iten.
- 2. Dely of approval could precipitate a special outage.
- 3. Dely of approval could adversely affect the FrP 2 Refueling Outage in Septenber 1983.
- 4. July 8,1983 submittal requested approval of revised progran by Septetber 1,1983.
- 5. Supplenented by two letters dated June 20,1983 and nake part of May 3,1983 submittal by APCo letter dated June 29,1983.
- 6.. Dely of approval could preclude startup of each unit after refueling.
ATTAcimENT P:ge 8 LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JANUARY 13, 1983 LETTER JULY 8,1983 PR[FOSED ACIUAL REIRESTED ACTUAL AFCo MCo NC K
SBEITTM.
SAMITTE
HENWKS 7.. RCS Pressure Isolation N/A 06-20-83 08-15-83 tbte 3 Valve One-Time Technical 07-08-83 See item 7, Specification Change page 2 for Unit 2 8 It/ raulic Snubber List 60 des after 07-01-84 d
for FtP 2 startup following the Unit 2 2nd R. O.
I
- 1. The 30 day Federal Register notification requiraient of 10 CFR 50.92 nay delay NRC approval of this iten.
- 2. Dely of approval could precipitate a special outage.
- 3. Dely of approval could adversely affect the FfP 2 Refueling Outage in Septenber 1983.
- 4. July 8,1983 submittal requested approval of revised progran by Septenber 1,1983.
- 5. Suppletented by two letters dated June 20,1983 and nake part of May 3,1983 submittal by APCo letter dated June 29, 1983.
- 6. Dely of approval could preclude startup of each unit after refueling.