Forwards Status of Licensing Items Requiring NRC Approval as of 830708
ML20072N786
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/08/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
GL-82-17, NUDOCS 8307180095
Download: ML20072N786 (9)


Text

Me811sg Address

' Alabama Power Company 600 North 18th Street Post OffioD Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%:' et;%'"'

AlabamaPower

/

the southern ekCtic system July 8, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requesting NRC Approval Gentlemen:

Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983.

This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.

If you have any questions, please advise.

Yours very truly, 9V E

F. L. Clayton, Jr FLCJr/GGY:Ish-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly j

g Mr. E. A. Reeves T

g Mr. W. H. Bradford O

Dr. I. L. Myers jL B307100'095 830708 PDR ADOCK 05000348 R

PM

ATTACMENT Page 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8,1983 P90 SED ACRN.

REIRESTED ACTUAL APco APco mC mC S SIITTM.

SAMITTE

  1. PROWAL MPROVAL TAC 11DI MTE MTE MTE MTE 70.

ROGUlKS

1. Movable Contml Rod Assetlies for 02-22-83 03-04-83 07-15-83 49951 Note 1 FtP1and2(T.S.3/4.1.3) 06-03-83 49952
2. Charcoal Filters for FIP 1 and 2 03-01-83 03-04-83 09-01-83 49953 APCo to (T.S. 4.7.7, 4.7.8 and 4.9.14) 49954 appeal the initial EC conclusions which are based on the pmposed withdrawal of Generic Letter 83-13.
3. River Water Systen for FNP 1 and 2 N/A 12-30-82 07-01-83 OVERl1E 49374 See iten 6, (T.S.3/4.7.5) 49375 page 7
4. Diesel Generator Overload Test for N/A 08-03-82 07-01-83 49374 FfP1and2(T.S.4.8.1.1.2.c.5) 12-30-82 10-01-83 49375 06-03-83
5. BIT Reduction for F?P 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A (T.S.3/4.5.4) 03-04-83 03-18-8
6. Turbine Valve Surveillance for FtP 2 N/A 10-08-82 12-01-82 NRC letter 48973 APCo appeal (T.S.3/4.3.4) 12-10-82 of 04-29-83 meeting 01-1tM3 stated NRC scheduled 05-31-83 position.

for July 13, 1983.

1. The % day Federal Register notification mquirement of 10 CFR 50.92 may delay NRC approval of this iten.
2. Delay of approval could precipitate a special outa9e.
3. Delay of appmval will adversely affect the FNP 2 Refueling Outage in Septenter 1983.
4. July 8,1983 sutrnittal requested approval of mvised program by Septenter 1,1983.
5. Supplanented by two letters dated June 20,198 and nede part of May 3,1983 sutrnittal by APCo letter dated June 29, 1983.
6. Delqy of approval could preclude startup of each unit after mfueling.

~

ATTACMENT Pa9e 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8, 1983 PRFOSED EiWL REIK5TED ERM.

APco APco Mc NC SlBGTTAL SBGTTAL

/PPRNAL APPROVA. TAC ITEM MTE MIE MTE MIE 10.

REMMKS

7. RCS Pressure Isolatim Valves N/A 08-10-82 07-01-83 OWEMIE 48714 See iten 7, for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 48715 page 8 and3/4.4.7.3)
8. Mechanical Snubber Functional Test N/A 11-05-82 12-01-82 01-31-83 N/A Exsption for FNP 1 (T.S.4.7.9.e)
9. Waste Gas Hydmgen/0rygen Analyzer 12-01-83 06-01-84 for FiP 1 and 2 (T.S. Table 4.3-9)
10. ISI/IST Licer. sing Progra
a. Unit 1 Inservice Inspection (ISI)

Progra for A9E Code Class 1, 2 and 3 Caponents

1) Relief Requests on vessel N/A 04-17-81 09-01-83 48559 cladding ex minations 01-10-83
2) Relief Requests on hydro-01-18-83 01-28-83 09-01-83 49547 static test mquirsents
b. Unit 2 Inservice Inspection (ISI) Progra for A9E Code Class 1, 2 and 3 Ca ponents
1) Revision 0 Relief Requests N/A 07-25-80 09-01-83 51033 Note 3 06-20-83
2) Relief Requests on vessel N/A 01-10-83 09-01-83 49373 tbte 3 cladding ex minations 06-20-83
3) Relief Request on hydm-01-18-83 01-28-83 09-01-83 51062 Note 3 static test requirsents.

06-20-83 1.,

The 30 dqy Federal Register notification mqui.went of 10 CFR 50.92 nay delay NRC approval of this iten.

2. Delay of appmval could precipitate a special outage.
3. Delqy of appmval will adversely affect the FrP 2 Refueling Outage in Septaber 1983.
4. July 8,1983 sutrnittal mquested approval of mvised pmgra by Septaber 1,1983.
5. Suppleented by two letters dated June 20,1983 and nade part of Mqy 3,1983 sutmittal by APCo letter dated June 29,1983.
6. Delay of approval could preclude startup of each unit after refueling.

~

AfTACmENT P;ge 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8, 1983 PR(FOSED EIUAL REIMSD ACluRL APCo AFCo MC IGC SBtITTM.

SDt!TTM.

  1. PDAL APF M AL TE ITEM MTE MTE MTE MTE 10.

REMARKS

c. Unit 1 Inservice Testing (IST)

Progran for AMSE Code Class 1, 2 and 3 Conpanents

1) Revision 2 Relief Requests N/A 04-21-80 03-15-83 05-02-83 11277 Note 4
2) Revision 3 Relief Requests N/A 07-16-81 03-15-83 05-02-83 11277 Note 4
3) Revision 4 Relief Requests N/A 10-25-82 03-15-83 05-02-83 11277 lbte 4
d. Unit 2InserviceTesting(IST)

Progran for A9E Code Class 1, 2 and 3 Conponents

1) Revision 0 Relief Requests N/A 03-12-80 02-15-83 04-08-83 47051 fetes 3 & 4 06-20-83
2) Revision 1 Relief Requests N/A 03-17-82 02-15-83 04-08-83 47051 Notes 3 & 4 06-20-83
3) Revision 2 Relief Requests N/A 08-06-82 02-15-83 04-08-83 47051 Notes 3 & 4 06-20-83
11. Spent Fuel Pool Storage Mditions N/A 03-19-82 11-01-82 04-15-83 N/A for FW 1 05-01-83
12. Change 18 Month Interval to 04-01-83 04-05-83 10-01-83 51408 Refueling 51409 13, Meteorological Tower Surveillance 02-01-83 01-24-83 0 M 1-83 51437 APCo to

(

for F W 1 and 2 (T.S. 3/4.3.3.4) 51438 evaluate NRC review.

1. The 30 av Federal Register notification mquirenent of 10 CFR 50.92 may dely NRC approval of this iten.
2. Dely of approval could precipitate a special outage.
3. Dely of approval will adversely affect the FW 2 Refueling Outage in Septenter 1983.
4. July 8,1983 subnittal mquested approval of mvised progran by Septerber 1,1983.
5. Supplanented by two letters dated June 20,1983 and made part of My 3,1983 subnittal by APCo letter dated June 29, 1983.
6. Dely of approval could preclude startup of each unit after mfueling.

7 f

~

ATTACMENT

~

Page 4

,n STATUSOF.1.ICENSINGITEMSREQUIRIG.

NRC APPRO. VAL JULY 8, 1983,

i Ph0 FEED EIM.

REIJESIED E1UAL AP00 NCo NIC. -

NIC SEMITTAL SIAMITTAL'

  1. 8Piir#AL NHWAL TE ITEM MTE MTE

_' MIE MTE M).

REMRIES

14. In-Core Thinbles for FNP 1 and 2 N/A N/A N/A N/A N/A (T.S.3.3.3.2)
15. Safety Evaluations for Next Fuel Reloads:
a. Unit 1 Upflw Modification N/A 08-16-82 N/A N/A N/A
b. Unit 1 Cycle 5 03-14-83 03-17-83 N/A N/A N/A
c. Unit 2 Cycle 318 Month Fuel 09-01-83 N/A N/A N/A Cycle
16. F delta H and Positive Moderator 09-15-83 02-01-84 Tamerature Coefficient
17. Contairment Sprqy N/A N/A N/A N/A N/A
18. Technical Specification Optimi-N/A N/A N/A N/A N/A zation Westinghouse Owners Gmup
19. Safety Related 8attery Changes 04-15-83 05-03-83 11-03-83 51631 Suppleental 51629 infonnation to be provided in July 1983.
20. Rod Swap Test During Low Power 03-01-83 03-01-83 N/A N/A N/A PhysicsTesting
21. Rod Drop Timing Ibring Lw Power N/A N/A N/A N/A N/A PhysicsTesting
1. The 30 dqy Federal Register notification rtgirment of 10 CFR 50.92 nay delqy NRC approval of this iten.

2 Delqy of approval could precipitate a special outage.

3. Delqy of approval will adversely affect the FW 2 Refueling Outage in Septaber 1983.
4. July 8,1983 subnittel requested approval of revised program by Septsber 1,1983.
5. Suppleented by two letters dated June 20,1983 and ne& part of Mqy 3,1983 subnittal by APCo letter dated June 29,1983.
6. Delay of approval could preclude startup of each unit after refueling.

ATTnCMENT Page 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8, 1983 PROPO D EllA.

REQLESD E1UAL Arco Mco mC nc S 96TTM.

SMGTTM.

  1. PIDft
  1. PlafM.

TAC ITIM MTE m1E MTE MIE M).

RB MKS

22. Auto Rod Control Above 9(5 Power N/A 01-11-83 04-01-83 03-24-83 N/A for thit 2 Cycle 2 and thit 1, 09-14-82 12-01-82 Cycle 5
23. Unit 2 Licensing Deletior 01-12-83 01-07-83 fyA N/A N/A Anendrent Clarification Letter
24. FSAR Update 07-01-83 07-01-83 N/A N/A N/A
25. Mninistrative Changes
a. Accmulator and ECCS Subsysten 02-01-83 02-01-83 09-01-83 49184 for FW 1 and 2 (T.S. 4.5.1.1 49185 (c) and 4.5.2.(a))
b. Generic Letter 82-17 on Audit N/A 10-25-82 09-01-83 49068 of Energency Plan for FW 1 49069 and 2 (T.S. 6.5.2.8.e)
c. Mechanhcal and %draulic 06-01-83 05-27-83 09-01-83 49184 Snubber Lists for FNP 1 (T.S. Table 3.7-4A and 3.7-46)
d. Muinistrative Changes for FW 03-01-83 02-01-83 09-01-83 49184 1 and 2:

49185

1) Fire Detectors Table 3.3-12 2 RlR lsolation 4.5.2.d.1 3 River Water Sury 3/4.7.5 4 Yarit Fire %drant Table 3.7-7
5) Service Water Battery 4.8.2.5.2(d)5
6) Organization 01 art Figure 6.2-2
1. The 30 de Federal Register notification requironent of 10 CFR 50.92 may delay NRC approval of this iten.
2. Dely of approval could precipitate a special outage.
3. Dely of approval will adversely affect the FW 2 Refueling Outage in Septeter 1983.
4. July 8,1983 submittal mquested approval of revised progran by Septeter 1,1983.
5. Suppleiented by two letters dated June 20,1983 and nede part of My 3,1983 submittal by APCo letter dated June 29, 1983
6. Dely of approval could preclude startup of each mit after refueling.

l

ATTACIMENT Page 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL JULY 8,1983 PIG OSED ERM.

RFUESTED ACUL APCo AFCo a

rec SLAMITTAL SLAMITTE

  1. FHDWAL APPROVAL TAC IIIM MTE MIE MTE MTE 10.

REMMKS

e. Unit 2 Pre:surizer Sensor Table 03-01-83 02-01-83 09-01-83 49185 (T.S.3.3.3.7)
f. Unit 1 Refueling Outage Change: 03-01-83 02-01-83 09-01-83 49184 Contaiment Vent
g. Turbine Building Hydraulic N/A 12-10-82 09-01-83 49287 Snubbers for FNP 2 h.

Incorporation of Licensing N/A 11-24-82 09-01 49182 Require 1ents for FNP 2

1) FNP 2 License Condition 2.C.(17) - Contaiment Vent Line
2) Mechanical Snubber List for FNP 2 (T.S. Table 3.7-4b)
3) FfP 2 License Condition 2.C.(19)(b)-Containment Overcurmnt Protection
1. Organization 01an9e to Offsite N/A 11-16-82 09-01-83 49184 lenagenent for FNP 1 and 2.

06-29-83 49185 l,

1. The 30 dqy Federal Register notification requirenent of 10 CFR 50.92 may delay NRC approval of this iten.
2. Delqy of approval could precipitate a special cutaphueling Outage in Septeter 199.
3. Delay of approval will adversely affect the Ffe 2 Re
4. July 8,1983 subnittal requested appmval of revised program by Septeter 1,1983.
5. Supplemented by two letters dated June 20,1983 and aede part of May 3,1983 submittal by /PCo letter dated June 29, 1983.
6. Delqy of approval could preclude startup of each unit after mfueling.

9

~

ATTACIMENT Page 7 LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JANUARY 13, 1983 LETTER JULY 8,1983 PIGOSED ACML REIMSTED ACTUAL APCo

  1. Co NC NC SEMITTAL SAMITTAL M9IGAL APPIGAL TAC ITEM MTE MTE MTE ETE 10.

REMRKS

1. Mninistrative Changes N/A 02-01-83 09-01-83 49184 49185
a. Engineered Safety Actuation Systen Instrunentatim ACTION Statenent 20 Error
b. Security Plan Audit Frequency
c. Environnental Qualification (FNP1)
d. Augtented Low Power Test Progran (FtP 2)
2. Turbine Valve Surveillance N/A 05-27-83 07-29-83 51473 One-TineChange(T.S.3/4.3.4) 06-20-83 08-01-83 for FrP 2
3. Snubber Visual Inspectim 06-17-83 06-17-83 10-01-83 51891 tbte 2 (he-Tine Change (T.S. 3/4.7.9) 06-20-83 07-08-83
4. Envirormental Qualification N/A 05-20-83 Unit 2 2nd tbte 6 Exetption Request R.0.

Unit 15th R.O.

5. Multiplant Action Iten B-32 N/A 04-06-83 09-01-83 49184 49185
6. River Water Systen One-Tine N/A 06-20-83 08-03-83 51892 rete 2 Technical Specification (hange 06-20-83 51893 See iten 3, 06-29-83 page 1
1. The 30 de Federal Register notification mquirstent of 10 CFR 50.92 nay dely NRC approval of this iten.
2. Dely of approval could precipitate a special outage.
3. Dely of approval could adversely affect the FrP 2 Refueling Outage in Septenber 1983.
4. July 8,1983 submittal requested approval of revised progran by Septetber 1,1983.
5. Supplenented by two letters dated June 20,1983 and nake part of May 3,1983 submittal by APCo letter dated June 29,1983.
6.. Dely of approval could preclude startup of each unit after refueling.

ATTAcimENT P:ge 8 LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JANUARY 13, 1983 LETTER JULY 8,1983 PR[FOSED ACIUAL REIRESTED ACTUAL AFCo MCo NC K

SBEITTM.

SAMITTE

  1. 910fAL MPIOfAL TAC ITEM MTE MTE MTE MTE 70.

HENWKS 7.. RCS Pressure Isolation N/A 06-20-83 08-15-83 tbte 3 Valve One-Time Technical 07-08-83 See item 7, Specification Change page 2 for Unit 2 8 It/ raulic Snubber List 60 des after 07-01-84 d

for FtP 2 startup following the Unit 2 2nd R. O.

I

1. The 30 day Federal Register notification requiraient of 10 CFR 50.92 nay delay NRC approval of this iten.
2. Dely of approval could precipitate a special outage.
3. Dely of approval could adversely affect the FfP 2 Refueling Outage in Septenber 1983.
4. July 8,1983 submittal requested approval of revised progran by Septenber 1,1983.
5. Suppletented by two letters dated June 20,1983 and nake part of May 3,1983 submittal by APCo letter dated June 29, 1983.
6. Dely of approval could preclude startup of each unit after refueling.