0982-L
/LLINO/S POWER 00MPANY U-10072
/P CLINTON POWER STATION. P.O. BOX 678 CLINTON, ILLINOIS 61727 July 8, 1983
-g g
p-Docket No. 50-461
- YI W4-1 J/RA l BGa i
4 Regional Administrator, Region III gi*Q hf;fh k
l Mr. James G.
Keppler ama j
-iu
(
U.
S.
Nuclear Regulatory Commission hg. 4
_g 799 Roosevelt Road jg i
_ 1 Glen Ellyn, IL 60137 htL
_l Fill U Ch OL i
Subject:
Organizational Assignment of Training
Dear Mr. Keppler:
Illinois Power company letter of January 28, 1983, in part, reported the assignment of the construction training organization to Baldwin Associates Quality and Technical Services (BA Q&TS) in January 1982.
This change was intended to increase emphasis on quality assurance in the training program.
-.=
This change has been evaluated in view of the current and projected quality assurance workload in the BA Q&TS organization.
The conclusion is that the organizational assignment of training to the BA Q&TS organization is undesirable for the long term
=-
because it detracts from the management attention available for quality assurance matters.
7-Accordingly, the training organization will be reassigned to report to the Vice President.
A plan which controls the transition from construction to operational training, and INPO 7-accreditation, will be implemented by January 1, 1984.
I r
- yours, e
N
?
lall Vice President KFH/jb cc: