Responds to NRC Re Violations Noted in IE Insp Rept 50-508/82-04.Corrective Actions:Certificate of Conformance Provided on 830418 & FSAR Table 3.2-1 Re Quality Class G Items Revised
ML20072N101
Person / Time
Site: Satsop
Issue date: 06/08/1983
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20072N087 List:
References
GO3-83-463, NUDOCS 8307150203
Download: ML20072N101 (2)


Text

_ _ _ _ _ _ _

j l

0,9

}

Washington Public Power Supply System)'9/j8 Box 1223 Elma, Washington 98541 (206)482-4428 p

I.

Docket No. 50-508 6p Gg %:

\\

June 8, 1983 G03-83-463 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch No. 1

Subject:

NRC INSPECTION AT WNP-3/5 IE REPORT NO. 50-508/82-04 i

VIOLATION A (NONCOMPLIANCE 50-508/82-04/01)

Reference:

Letter, G03-82-1240, Mr. R. S. Leddick to Mr. D. M. Sternberg same subject, dated December 2, 1982.

The referenced letter forwarded the Supply System final report of cor-rective/ preventive actions and date of full compliance for the subject noncompliance (failure to fabricate and install CB&I structures in accordance with Quality Class I).

During Supply System verification of corrective actions, it was found thqt two commitment dates listed in the report were not met as follows:

1)

It was reported that a Certificate of Conformance to the material specification listed on the CB&I drawings would be provided by CD&I for all "A" (excluding A2 and A3) and "B" items by December 15, 1982. The Certificate of Conformance was actually provided by CB&I on April 18, 1983.

2)

It was reported that Table 3.2-1 of the FSAR would be revised by March 30, 1983 to reflect the Quality Class G status of certain specified items.

Since Table 3.2-1 also required extensive revision for additional reasons, it was considered prudent to incorporate all the changes into a single revision. Therefore, the March 30, 1983 date was not met. Due to the impending suspension of work at WNP-3, a date when the revised table can be incorporated into the FSAR cannot l

be established.

However, a SAR Change Request has been initiated and will be processed in accordance with established procedures to assure implementation.

8307150203 830712 PDR ADOCK 05000508 G

PDR

T 1

Mr. D. M. Sternberg June 8, 1983 Page 2 G03-83-463 Should you have any questions or desire further information, please contact me directly.

)

l 7k 0 u

R. S. Leddick (760)

Program Director, WNP-3 DRC:nj cc:

J. A. Adams - NESCO D. Smithpeter - BPA Ebasco - New York WNP-3 Files - Richland R. D. Hill - Puget Sound Power & Light Company P. Inman - Washington Water Power Company B. D. Withers - Portland General Electric Company L. D. Weislogel - Pacific Power & Light Company