ILLINO/S POWER COMPsWY C.T*j c c o,_r 2fu d,, 2 ct e. Ton Pc.s sin.on P.o. 83< in ct.NON kUN065 617??
JAN 311983 nocket No. 50-461 Mr. James G.
Koppler Regional Administrator Region III U.
S. Muclear Regulatory Ccmraission 799 Roosevelt Road Glen.Ellyn, IL 60157
Dear Mr. Koppler:
SUBJECT:
Sol f-Initi.ated Evalue ' ion off Clinton Fower Station Attached is the report ei Illinci a Power company self-initiated evaluation of the construction and engineering activitics involved in t u ccnstruction of the Clinton Power Station.
"he eva luation ef fort uc.s conducted in accordance with guidelines promul g ted by the Institute of Nuclear Power Operations (INFO) 'uri nc.
the period October 22 through December 17, 1982.
The rotal tiir.c m: pended by the tean in the evaluation effort was approyiuately 3400 hours0.0394 days <br />0.944 hours <br />0.00562 weeks <br />0.00129 months <br />.
Illinois Power Cc:npany har established a tracking system for resolving the findings identified in this report.
We will be glad tc further discuss car plars for resolving the findings if you desire.
Sincerely yours, 0:sn31 D. P.,MAlk caned By
,f g.rkG NA
- l
'\\,7 Vi'dE President
- s. #]
b
.y cc UGNRC Resident Inspector
]4, 3.
Manager - Quality Asstr;2nce (w/o attachment) x Illinoi s Departmerit ct Nuclear Safety Director - Offico of I & E,Nashington,d,p. :20555 attachr.ent U
M
- s
,/ b '
I t
y
~
E l j,l.
- s ?,
I
'~. ;.. ; L. t 8304010437 830329 PDR ADOCK 05000461 t
PDR l-.