Forwards Revised Self-Initiated Const Project Evaluation (Per INPO Guidelines), Resulting from 821022-1217 Evaluation
ML20072N054
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/31/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20072N052 List:
References
0982-L, 982-L, NUDOCS 8304010437
Download: ML20072N054 (1)


Text

_

J m

T 6

ILLINO/S POWER COMPsWY C.T*j c c o,_r 2fu d,, 2 ct e. Ton Pc.s sin.on P.o. 83< in ct.NON kUN065 617??

JAN 311983 nocket No. 50-461 Mr. James G.

Koppler Regional Administrator Region III U.

S. Muclear Regulatory Ccmraission 799 Roosevelt Road Glen.Ellyn, IL 60157

Dear Mr. Koppler:

SUBJECT:

Sol f-Initi.ated Evalue ' ion off Clinton Fower Station Attached is the report ei Illinci a Power company self-initiated evaluation of the construction and engineering activitics involved in t u ccnstruction of the Clinton Power Station.

"he eva luation ef fort uc.s conducted in accordance with guidelines promul g ted by the Institute of Nuclear Power Operations (INFO) 'uri nc.

the period October 22 through December 17, 1982.

The rotal tiir.c m: pended by the tean in the evaluation effort was approyiuately 3400 hours0.0394 days <br />0.944 hours <br />0.00562 weeks <br />0.00129 months <br />.

Illinois Power Cc:npany har established a tracking system for resolving the findings identified in this report.

We will be glad tc further discuss car plars for resolving the findings if you desire.

Sincerely yours, 0:sn31 D. P.,MAlk caned By

,f g.rkG NA

  • l

'\\,7 Vi'dE President

  • s. #]

b

.y cc UGNRC Resident Inspector

]4, 3.

Manager - Quality Asstr;2nce (w/o attachment) x Illinoi s Departmerit ct Nuclear Safety Director - Offico of I & E,Nashington,d,p. :20555 attachr.ent U

M

s

,/ b '

I t

y

~

E l j,l.

s ?,

I

'~. ;.. ; L. t 8304010437 830329 PDR ADOCK 05000461 t

PDR l-.