Forwards Revised Self-Initiated Const Project Evaluation (Per INPO Guidelines), in Response to NRC Requests.W/O Encl
ML20072N045
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/29/1983
From: Wuller G
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20072N052 List:
References
U-0627, U-627, NUDOCS 8304010436
Download: ML20072N045 (1)


Text

Y ~

Blinois Power Compsny '

U 0627

' L30-83(03-293-L' 500 SOUTH 27TH STREET. P. O. BOX 511, DECATUR. ILLINOIS 62525-1805 Docket No. 50-461 March 29, 1983 Director of Nuclear Reactor Regulation Attentica: 1k . A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Reference:

IP letter 1/31/83,D. P. Hall to J. D. Keppler NRC Region III Subj ect : Self-Initiated Evaluation of Clinton Power Station Unit 1 Enclosed is the report of Illinois Power Company self-initiated evaluation of the construction and engineering activities involved in the construction of the Clinton Power Station Unit 1. This is provided in response to the verbal request on March 23 of Dr. H. Abeloon, NRC Clinton Licensing Proj ect Manager.

The IP evaluation effort was conducted in accordance with guidelines promulgated by the Institute of Nuclear Power Operations (INPO). Copies of this report were previously provided to the NRO, Office of Inspection and Enforcement by the referenced letter (copy attached).

Sincerely, G. E. Wuller Supervisor-Licensing Nuclear Station Engineering GEW/lt Enclosure ,

cc: Dr. H. Abelson, NRC Clinton Project Manager Mr. H. H. Livermore, NRC Resident Inspector (w/o ene.)

Illinois Depar tment of Nuclear Safety (*7/o enc.)