ML20072M887

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1983
ML20072M887
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/09/1983
From: Kennedy D, Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8307150124
Download: ML20072M887 (5)


Text

s 6

OPER ATING DiT A REPORT DOCKET NO.

50-255 DATE 7 5 81 CO31PLETED BY DAPeterson TELEl' HONE (616176h-8913 OPERATING STATUS Palisades Notes

1. Unit Name:
2. Repor ing Period:

R?n6n1 R70690

3. Licenwd Thermal Power (51Wt);

2570 t

4. Nameplate Rating (Gross \\lwe):

811.7

5. Design Electrical Rating (Net 31We):

805

  • 675
6. Slasimum Dependable Capacity (Gross 31We):

g

7. 5f aximum Dependable Capacity (Net StWe):
  • 695 S. If Changes Occur in Capacity Ratings (liems Number 3 Through 7) Since Last Report.Gise Reasons:
9. Power Lesel To Which Restricted.lf Any (Net 31We):
10. Reasons For Restrictions.!f Any:

This >fonth Yr.-to Date Cumulatise

11. Hours in Reporting Period 720 h3h3 101,078
12. Number Of Hours Reactor Was Critical 720 4305.3 58,228.3
13. Reactor Resene Shutdown Hours
14. Hours Generator On.Line 720 4253.2 55,248.1
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (51WH) 1.761.720 10.hh3.936 113,080,728
17. Gross Electrical Energy Generated (51WH)

Sh5.730 3,288,400 35,058.320 IS. Net Electrical Energy Generated (51WH) 517,038 3,119,131 32,977,167

  • i
19. Unit Service Factor 100.0 97.9 5h.7

~

20. Unit Asailability Factor 100.0 97.9 54.7 113.1 113.1 51.4
21. Unit Capacity Factor (Using 31DC Net)
22. Unit Capacity Factor (Using DER Net) 89.2 89.2 h0.5
23. Unit Forced Outage Rate 0

2.1 32.8

24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date.and Duration of Each t:

Refueline. 8/11/83.103 anys

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Unit > In Test Staius (Prior o Commercial Operation):

FJrecast Achiesed INITI A L CRITICA LITY INITIA L ELECTRICITY CO\\lstERCI A L OPER ATION 2Y lr 8307150124 030709

.i PDR ADOCK 05000255 F/77)

R PDR

6 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Pnifnndes __

DATE 7-5-83 CO3IPLETED IlY DAPeterson (616)T64-8913 TELEPlf0NE June 1983 afoNTIf DAY AVER AGE DAILY power LEVEL DAY AVERACE DAILY POWER LEVEL (AlWe Net)

(51We Net)

}'(

Th3 73h 37 Ibl I

2 18 T39 3

19 4

20 723 5

21 T32 Th6 T29 6

22 23 733 7

742 T27 3

24 T36 299 l

9 25 10 734 658 26 1i T32 727 T30

-733 12 33 T29 g3 29 730 14 729 T27 730 is T31 16 INSTRUCTIONS

- On this forinat. list the aserage daily unit l'ower lad ir st\\te.Nn 6t cae3 day in the repsirting mienth.Csun;iute to tiu nearest whole megaw.ut.

(9/77)

_________.____________________.______m_._._____._m._

_ - _ _ _ _ _ ____m

DOCKET NO.

50-255 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Palis ades

)

DATE

? !O /R7 June 1983 COMPLETED BY DVin NnFerr REPORT MONTil TELEPHONE (A1 A 76h RO13 l

e.

jg 3

.Y Licensec pt, Cause & Correctise o

No.

Date g

3=

j

,j j $

Event

-7 gi g

Action to y5 s

35g Repor

  • mo e'

Present Recurrence H

o C

I i

I 5

830625 F

0 B

h Primary Coolant Pu=p 011 Level j

l 4

/

l 1a 2

3 4

l F: Forced Reason:

Method:

Exhibit G - Inst ructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Prep.uation of Data i

B-Maintenance of Test 2 Manual Scram.

Enti) Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report iLI R) Fde (NilRI G-D-Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exlubit I - Same Source (0/77)

II-Other ( E splain)

I 1

.i s

SUMMARY

OF OPERATIflG EXPERIENCE FOR MONTH OF JUNE, 1983 Plant operated at essentially 100% rated power except for the period between June 24 and June 26, when power was reduced to 20% to add oil to one primary coolant pump.

1 i

a 4

5 A

'l O Consumers Power Company Fallendes Nucteer Plant: Route 2, Box 154, Covert, MI 49043 July 9, 1983 US Nuclear Regulatory Comission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1983.

David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades JGKeppler, U3NRC JRSchepers, P24-308 DJVandeWalle, P24-61hB RMKrich, Palisades Resident Inspector, Palisades JJDellas, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan 4

SMicr wa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Rec;rds Center, INPO, Atlanta, GA Document Control 950*22*35*10/L PSepcenko, CE DV :83*0h9 d

9 i

i

_..