CUE LICHT COMPAPY Fuclear Se f and Licensing Department February 2,. 1983 i
NDLDRS:239 Beaver Valley Power Station EPP/IP Issue 7, Rev. 1 To All Holders of. Emergency. Preparedness Plan, Implementing Procedures:
Please find attached the latest copy (Issue 7, Revision 0) of the BVPS Emergency Implementing Procedures (EPP/IP) for your informati'on and use.
These procedures will become effective January 31, 1983.
Please destroy any previous copies of this Volume (Volume II) to avoid misinformation or error.
The BVPS EPP, Operating Manual Chapter 57, consists of two (2) volumes:
the Plan which is Volume I
and the Implementing Procedures which comprise volume II.
The entire set of Implementing Procedures is being reissued at Issue 7, Rev. I to facilitate numerous changes and additions as a
rasult of previous drills and the annual review an,d update of the EPP/IP.
If you have any questions regarding this latest issue of the EPP/IP, please contact Donna Miller at 393-5767.
MhN W.
F. Wirth Attachment DJM: met cc:
NS & L File (2) g)
Central File (2)
\\
l Y
8303310502 830329 PDR ADOCK 05000334 F
PDR L
BEAVER VALLEY POWER STATICN EMERGENCY PLEPAREDNESS PLAN (00 rstions Manual Ch pt r 57)
Distributien List CNCCNTPCELED CCPIES rx Vice Presiden* of Nu11 ear Division
(
)
Vice President of Juclear Construction Vice President of E & C Vice President of General Services General Superintendent, Power Stations Department Manager of Nuclear Operations Manager of Nuclear Safety and Licensing Manager of Nuclear Support Services Manager of Nuclear Engineering Technical Assistant to V. P. of Nuclear Division Duquesne Light Company, Quality Assursnce Manager Manager of Environmental Affairs Manager of Public INformation Department Nuclear Station Superintendent, Unit 1 Nuclear Stati;n Sups:intendent, SAPS Superintendent, Technical Service 4 Superintendent, Licensing & Compliance Superintendent, Analytical Services Radiological Operations Coordinator Director, Environment & Rad. Safety Programs Director, Cterations cuality Centzel Coordinator, Offsite Review Committee Director, F.dministration Services Director, Pt. sones 1 Management Emergency Planning Supervisor Director of Security
(}
Fire & Safety Engineer
\\,,/
Superintendent of Nuclear Construction BVPS Unit 2 Start-Up Coordinator CRC Members per ORC list, (excluding any above positions)
Chief Engineer; BVPS Supervisor, Nuclear Operations; BVPS Maintenance Supervisor; BVPS Supervisor, I & C; BVPS Supervisor, Testing & Plant Performance; BVPS Station Engineering Superviscr; BVPS Reactor Control Chemist;LdPS Technical Advisor Engineer; BVPS Procedure Coordinator s BVPS RadCon Foreman; BVPS Director, Gen. Engineer Director, Nuclear Engineering Director, Electrical Engineering Security Assistants Environmental Coordinator Radiological Protections Program Coordinator Radiological Programs Coordinator Senior Health Physics Specialist Nuclear Training Supervisors BVPS (5 copies)
Public Information Department (5 copies' f
BVPS Project Manager, E & C Department Nuclear Engineer, E & C Department Mechanical Engineer, E & C Department k.
Electrical Engineer, E & C Department Const. Supt. of Support Services, (S & W) Unit 2 Schneider Safety Engineer (Unit 1)
NRC - Cnsite Inspector BVPS General Offsite Pile (10 spares)
Historical File Library
DUQUESNE LICHT COMPA!ft Sesyst Valley Tower Statitn i
SEAVER VALLEY POWER STATION D'ERCENCY PREPARE
- FESS P!.AM (Operations knual Chapter 57 - Implementing Procedures)
Distribution List
%/
COE POLLED COP!ES Technical Support Center. SVPS (No.1) - 0.P.E. (D. R. Timko)
Recipient - !SC Coordinator 5VPS Control Room (No. 2) - 0.P.E. (D. R. Tisko)
Recipient - Shif t Supervisor BVPS Control Room (No. 3) - 0.P.E. (D. R. Timko)
Recipient - Shif t Supervisor Alternate Emergency Operations Facility (No. 4) - 0.P.E. (D. R. Timko)
Recipient - 0.P.E. (locations South Heights T & D Sidg.)
NRC Region I (No. 5) (3 copies)
Reciptent - NRC Director; King of Prussia, PA NRC (No. 6) (10 copies)
Recipient - NRC Director, Bethesda. MD OSC Neting Room (No. 7) - 0.P.E. (D. R. Timko)
Recipient - OSC Chairman interia Emergency Operations Facility (No. 8) - 0.P.E. (D. R. Tisiko)
Recipient - 0.P.E. (Locations Admis. Bldg.)
Emergency / Recovery Managers Office (No. 9)
Manager Nuclear Operations (No.10)
NOTE:
All controlled copies are to be distributed and received via the use of the General Of fice Recorde Transmittal for controlled Copies From (See Anner I for form). The person delivering the copy vill sign the " Person Transmitting Records" Line, the person receiving the copy will.ign the " Recipient" line and f%
the office personnel receiving and filing the form in the Central Office File will sign the bottom line.
If the controlled copy and transmittal form cannot be hand carried to the reelpient, the signed tranesittal form sust be smiled back to the EVPS Station file by sending it to:
BVPS it 1 P.O. Box 4 Shippingport, PA 15077 c/o Office knager/ Central Office File Sect.icrialized listing Qaarating Procedure Digineer (D. R. Tinto, Recipient)
Durgency Cabinet No.1 (SS Office) -IX:C (Section EPP/IP - 2 series - 10 copies)
Dergency Cabinet !b. 2 (Pbnitoring Kits il & 2) - Fire Brigade Ibam (Section EPP/IP - 2 series and IP-6.1 - 4 copies each) anergency Cabinet No. 2 (Water femitoring Kit) - Fize Brigade Fem (Section EPP/IP - 2.4 and 2.7 - 2 ctpies encil)
Dergency Cabi:wt No. 3 (>traitoring Kit #3) - Centrolled Area aalltay (Section EPP/IP - 2 series and IP - 6.1 4 copies each)
Dergency Cabirut !b. 4 (9tmitoring Kits 44 & 5) - Alternate ECF (South Heights T & D Bldg.), (Sections EPP/IP - 2 series and 6.1 - 4 copies each)
Dergency Cabinet No. 4 (Dask) - Alternate ECF (South Reights T & D Bldg.)
(Sectica EPP/IP - 2 series - 10 cxpies)
Call Ibard (Secticn EPP/IP - 1.3 - 2 cxzpies - cria at Qxitrol Ibcn ECC and one at TSC) 4 (j
Dnargency Radiological Itmitoring van (Section EPP/IP - 2 series - 4 copies and EPP/IP 6.1 - 4 cxpies)
.