ML20072L722

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 1 to Issue 7 of Emergency Plan Implementing Procedures,Including Procedures EPP/I-1 Re Recognition & Classification of Emergencies & EPP/I-5 Re General Emergency
ML20072L722
Person / Time
Site: Beaver Valley
Issue date: 02/14/1983
From: Sieber J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20072L720 List:
References
ND1MSL:2156, NUDOCS 8303310497
Download: ML20072L722 (1)


Text

-

l v v.,/>

+

.3 c r*.

3.,

f.d*

Telechone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004

. February 14, 1983 PD1FSL:2156 United States Regulatory Commission Office of Inspection and Enforcement

~

Attn: Mr. Steven A.

Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit Po. 1 Docket No. 50-334, License No. DPR-66 Emergency Preparedness Implementing Procedure Plan Volume II Gentlemen:

Enclosed are ten copies of Issue 7, Revision I, of the Beaver Valley Power Station Emergency Preparedness Plan Implementing Frocedure Volume II.

Enclosed is one controlled copy (No. 6) and nine additional copies. These documents are provided pursuant to Appendix E Section V

of 10CFR 50.

The

" Manual Transmittal" form plovides directions for documentation of receipt of your copy.

We have forwarded a copy to the resident NRC Inspector, Mr. William Troskoski.

These procedures have been revised to facilitate incorporation of the changes and additions as a result of previous drills and the annual review and update of the EPP/IP.

Very truly yours, D.

Sieber, Manager Nuclear Safety & Licensing Attachment d

l l0

\\

8303310497 830329 8 PDR ADOCK 05000334 C p PDR or