ML20072L460
| ML20072L460 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/24/1983 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-SSINS-6820 IEB-80-13, NED-83-365, NUDOCS 8307140058 | |
| Download: ML20072L460 (1) | |
Text
Georgia Power Company 333 Piedmont Avenue At!anta, Georgia 30308 Telephone 404 526 6526 PJarhng Address:
USNRC RE~'MN 'I Post off.ce Box 4545 g g f, g fy j dQ RGi A Atlanta, Georg:a 30302 Georgia Power 0b L. T. Gucwa rno sautten *sxtre system Chief Nuclear Engineer Power Generation Department NED-83-365 June 24, 1983 U. S. Nuclear Regulatory Commission
REFERENCE:
Office of Inspection and Enforcement RII: JPO Region II - Suite 2900 50-366 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 80-13 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:
Pursuant to the requirements of WC I&E Bulletin 80-13, " Cracking In Core Spray Spargers," please be advised that a visual inspection was performed on the Hatch Unit 2 Core Spray spargers and associated piping during the 1983 maintenance / refueling outage.
Using remote underwater television cameras (with the required viewing in situ of 0.001 inch diameter fine wires), no cracking of the Core Spray spargers or in-vessel piping was observed.
Should you have any questions in this regard, please contact this office.
Sincerely yours, 8f G*~*
L. T. Gucwa JAE/mb xc:
J. T. Beckham, Jr.
H. C. Nix, Jr.
Senior Resident Inspector EC Office of Inspection and Enforcement Division of Reactor Operations Inspection (Washington) 8307140058 830624 PDR ADOCK 05000366 1
O PDR 50 TEII
.