ML20072K697
| ML20072K697 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/27/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-24175-RQT, DER-82-56, NUDOCS 8307060379 | |
| Download: ML20072K697 (2) | |
Text
-
ECBt'ED
!!=.C Arizona Public Service Company jlPJ } }
- y., L q, C P.O DOX 21666. PHOENIX, ARIZONA 85036 a.
June 27, 1983 ANPP-2417 5-RQT/BSKD'D !Ti U. S. Nuclear Regulatory Commission 58-528 Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M.
Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension for Report - DER 82-5 6 A 50.55(e) Potentially Reportable Deficiency Relating to Condensate Storage Tank Design Was Scaled-Down Without New Calculations For Eeismic Response.
File: 8 3-019-026, D.4.33.2 Re fere nc e:
(A) Telephone Conversation between J. Eckhardt and G. Duckworth on October 15, 1982.
(E) ANPP-2 2179, dated Nov. 1, 1982 (Interim Report)
(C) ANPP-22696, dated Jan.11, 1983 (Time Extension)
(D) ANPP-22845, dated Jan. 27, 1983 (Time Extension)
(E) ANFP-23276, dated March 17,1983 (Time Extension)
(F) ANPP-23467, dated April 12, 1983 (Time Extencion)
(G) ANPP-23868, dated May 24, 1963 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Referenc e (A), an Interim Report was transmitted by Reference (B), and time extensions were requested by References (C), (D), (E), (F), and (G).
At that time it was estimated that a Final Report would be available by June 24, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by July 27, 1983, at which time complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, OLi.1_
/K.,
o E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT:ru cc:
Page 2 8307060379 830627 PDR ADOCK 05000528 q!0
%p PDR
1 -
t U. S. Nuclear Regulatory Commission Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Fatterson R. W. Welcher R. M. Grant D.
R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Prost J. Self Recorde Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339