ML20072K522

From kanterella
Jump to navigation Jump to search
Forwards Full Payment of Fees as Result of IE Insps Conducted from Mar 1982 - Mar 1983
ML20072K522
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/01/1983
From: Westafer G
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
0604R, 3F-0783-03, 3F-783-3, 604R, NUDOCS 8307060319
Download: ML20072K522 (2)


Text

.

+ &^

r

(

%redffbt ht%[j'y396l?>

TR ):p D$$

c. #

m.

  • efgfif M

Power C0mPORaf aoN July 1,1983 3F-0783-03 l

U.S. Nuclear Re;ulatory Commission Office of Administration License Fee Management Branch Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Inspection Fees; Invoice Number 0604R

Dear Sir:

Florida Power Corporation herein submits Check Number 598233 (attached)in the amount of $37,500 in full payment of the subject invoice.

This payment is for inspections conducted at Crystal River Unit 3 during the period from March 1982, through March 1983.

Sincerely, lc

/

G. R. Westafer Manager Nuclear Licensing and Fuel Management Attachment DVH:mm cc:

Document Control Desk b

ph U.S. Nuclear Regulatory Commission Washington, D.C. 20555 g

1 l 9

\\

F307060319 830701 PDR ADOCK 05000302 PDR g

General Office 3201 Thirty-fourtn street sourn. P O. Box 14042, st Petersburg. Fbrida 33733 e 813-866 5151

E NRC FORM 28(

UA. NUCLEAR REauLATWY COMMISSION INVOICE NUMBER tit.e2r 0604R INVOICE FOR INSPECTION FEES FOR INVOICE DATE DATE DUE FACILITIES AND MATERIALS LICENNS Jurt 151983 JUL 151983 LICEN!E E F1orida Power Corporation MAKE CHECKS PAYABLE TO:

Nuclear 3 perations ATTN: Manager Nuclear u.s. Nuciear Re uistory Commisuon s

.l.icensing and Office of Resource Management Fuel Management mvisica e' acmunna, ana nnance

    • 5h' net o n.

C osss P.O. Box 14042; M.A.C. H-2 St. Petersburg, Florida 33733 PLANT Crystal River 3 FEE CATEGORY INSPE CTION LICENSE NUMBER AMOUNT DUE (10 CF R 170)

DATE TYPE REPORT NUMBER DPR-72 3/82-3/83 Sa fety 3 75s700 1

3/82-3/83 Sa feguards 11,800 l

l TOTAL TEEMS. Late payment darge after due date at the rate of 1.08 g o,,neoyerguepay.

(see terms)

$87.500 meet for each 30-day period or portion thereof that the payment is detaiid.

NOTICE. On March 23,1978, the NRC revised its regulations and adopted a new license fee schedule (10 CFR 170). A copy of the revised regulations was mailed to all NRC liansees. The revised schedule indudes, for the first time, the assessment of fees for f acility and materials routine health and sofity and safeguards inspections. The enclosed invoice shows the fee assessed for the recent inspection conducted by the Offim of Inspection and En-forcement of your licensed program.

THIS INVOICE IS Ny IN RESPONSE TO A PURCHASE ORDER. The inspection Fee represents the everage cost to conduct the inspection of the license (s) held by your company.

10 CFR 170.41 FAILURE SY APPLICANT TO PAY PRESCRIBED FEES. In any case where the NRC finds that an applicant or a fiansen has failed t3 pay a prescribed fee required in this part, the NRC will not process any appliation and may suspend or revoke any license or approval involved or may issue an order with respect to liansed activities as the NRC determines to be appropriate or nomssary in order to carry out the provisions of this part, Parts 30,40,50,70, and 71 of this chapter, and of the Act.

CONTACT. Questions relating to the assessment of fees under the revised fee schedule, and/or correctness of the address, call (301) 492-7225 or direct correspondena to:

US. Nudear Regulatory Commission Office of Administration License Fee Management Branch

. Washington, DC 20555

, - _ -