ML20072J248
| ML20072J248 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/06/1983 |
| From: | Crane P, Schuyler J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| REF-SSINS-6820, REF-SSINS-SSINS-6 83-122, IEB-83-03, IEB-83-3, NUDOCS 8306300041 | |
| Download: ML20072J248 (2) | |
Text
.
Docket Nos. 50=275/323 n G EI\\tE O H?c E LE C T R,IGP3 Sg M PANY PACIFIC OAS AND Pll 12: 2y W
(
77 BEALE STREET. SAN FRANCISCO, CALIFORNIA 94106 (415) 781 4211. TWx 910-372 6587 J.O.SCMUYLER W.Ct FRCSitt AY hvCLEat poete GEhtmaT80ss June 6, 1983 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-OPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2 IEB 83 Check Valve Failures in Raw Water Cooling Systems of Diesel Generators
Dear Mr. Martin:
IE Bulletin 83-03 requests licensees to review the plant Pump and Valve In-Service Test (IST) program required by Section XI of the ASME Boiler and Pressure Vessel Code and modify it if necessary to include check valves in the flow path of cooling water for the diesel generators from the intake to the discharge.
For such check valves, licensees are requested to examine the IST program and modify it if necessary to include verification procedures that confirm the integrity of the valve internals.
Each of the five diesel generator units at Diablo Canyon are provided with a closed-loop jacket cooling water system.
Engine jacket water is circulated by a jacket water pump driven directly by the engine.
The engine-generator skid has an integrally mounted radiator with a direct-driven fan for cooling the engine jacket water. There are no check valves in this closed system; therefore, this bulletin does not apply to Diablo Canyon.
r W
k 8306300041 830606 PDR ADOCK 05000275 0
PM t33-P l l
l Mr. John B. Martin June 6, 1983 Page 2 l
l Subscribed to in San Francisco, California, this 6th day of l
June, 1963.
Respectfully submitted, Pacific Gas and Electric Company By J. O. Schuyler Vice President Nuclear Power Generation Robert Ohlbach Subscribed and sworn to before me Philip A. Crane, Jr.
this 6th day of June, 1983 Richard F. Locke Attorneys for Pacific Gas and Electric Company SEAL Naftc7 J. Lemaster, NotaT7 Public
//
in and for the City and County of an Francisco, State of California Philip. Crane (dr.
My Comission expires April 14, 1986 xxxxxxxxxxxxxxxxxxxxxxxxxxxxx;$
g y
NANCY J. LEMASTER g x..J NOTARY PUBllC-C AUTORNIA :s N $0,1 CITY AND COUNTY OF 3
cc:
U. S. Nuclear Regulatory Commission y
M4 san raAncisco 5:
14,1936 h
("W" Commission Empires Apnl Document Control Desk
" " * " " ~ ' * " * "
Washington, D. C.
20555 Service List l
i
..