Qn b "5 INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 46M901 June 17, 1983 Mr. J. G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III, 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
This letter is to confirm notification given to Mr. E. R. Swanson, NRC Region III Resident Inspector, at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> on June 16, 1983, l
in accoroance with Technical Specification 6.9.1.12b.
At that time Mr. Swanson was informed that performance of Train "B"
of the Baron Injection Tank Inlet Piping Heat Trace Circuitry was questioned on June 12, 1983, but the train was not declared inoperable until June 16, 1983. The initial investigation indicated that the Action Statement of Technical Specification 3.5.4.2 was not performed during the period June 12, 1983 to June 16, 1983.
Following a thorough investigation of this event, a followup report will be submitted in accordance with Technical Specification 6.9.1.2.
Sincerely, LONb.kn%A /r W. G. Smith, Jr.
Plant Manager WGS:frb cc:
J. E. Dolan M. P. Alexich R. F. Kroeger B. Germano E. R. Swanson/N. E. DuBry R0:III R. C. Callen, MPSC G. Charnoff, Esq.
J. M. Hennigan R. O. Bruggee, EPRI INP0 PNSRC J. F. Stietzel E. L. Townley J{}g23 fog Dir., IE (40 copies)
Dir., MIPC (4 copies) 0306300035 830617 DR ADOCK 05000*
ffjy3