ML20072J039

From kanterella
Jump to navigation Jump to search
Public Version of Rev 8 to Emergency Plan Implementing Procedure 1903.10, Emergency Action Level Response
ML20072J039
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/04/1983
From: James M. Levine
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20072J010 List:
References
1903.10-01, 1903.10-1, NUDOCS 8303290699
Download: ML20072J039 (13)


Text

. .

l ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One FORM NO.

EE RECORD OF CHANGES AND REVISIONS 1000.06A REV. # 12 PC #

rnrocruev or nr nSnrdmmr s y' l Safety Related YES F NO O '

EMERGENCY ACTION LEVEL RESPONSE s h'@b;',".s "

.. 1903.10 Rev. 8 ] % .ii.

l 3

., ,y , GUadb $$0$% 3ka l

'l NAGE REV PC# PAGE REV PC# PAGE REV PC# PAGE REV FC# PAGE REV PC#

~

1 7 41 7 2 7 42 7 3 7 43 7 4 7 44 7 5 7 45 7 6 7 46 7 7 7 47 8 8 7 48 7 9 7 49 8 10 8 50 8 11 7 51 8 12 7 52 7 13 7 53 7 14 7 54 7 15 7 55 8 ,

16 7 56 8 O- 17 18 7

7 57 58 8

7 19 8 59 7 20 7 60 7 21 7 61 8 22 8 62 7 23 7 63 7 i 24 7 64 7 25 7 26 7 27 7 28 7 29 7 30 7 31 7 32 7 33 7 34 8 35 7 l 36 7 37 7 38 7 39 7 in APPROVED BY: APPROVAL DATE

? /b'T s, ..e $ /d,, ' q, REQUIRED EFFECTIVE DATE:

(General-Manager)

R303290699 830323 FDR ADOCK 05000313 F PDR

( _ _ _ . . . - - - --

M I

PROCEDURE / WORK PLAN TITLE: NO: j

. PLANT MANU AL SECTION:

EMERGENCY PLAN inn- in

  • poncrmmr ruer >crocy
  • c rrn" r e;g;_4. neer ,

P/ W in m r t /. _.

s ARKANSAS NUCLEAR ONE IJooN CHANGE

'sDATE DATE n , , st, u "

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One "E- FMERGENCY ACTIM I.E\TL RESPMSE l FON Na toni.10R REV . t 3 PC #

Page 1 of 2 UN1lSUAL E\T.NT SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD INITIALS /IIPE

1. Complete as much of Form 1903.10M, "EAL Notification" as a ail-able information and time allows.

NOTE: The order of notification may be rearranged as dictated by the situation with approval of the Shift Operations Supervtsor.

These groups should be contacted by the most expedient means available (paging, contacting appropriate response center for relaying information, direct phone call, radio contact, etc.).

The phone numbers (plant personnel) provided are for use if i an individual is not onsite, the appropriate response center has not been manned, etc.  !

J

2. Provide the initial information on form 1903.10M to the following groups:

2.1 Duty Emergency Coordinator (a duty roster is maintained /

in the Control Room area; beeper available; refer to Attachment I for telephone numbers as necessary).

2.2 Staff Augmentation Group (as directed by the Shif t Oper-atiens Supervisor); (a duty roaster / call list is main-tained in the Control Room area).

NOTE: The following minimum information should be provided to the section leader: affected unit. EAL declared, appropriate plant condttions/ parameters, required response.

2.2.1 Health Phystes Section (Beeper available) /

2.2.2 Engineertng/ Technical Support Section (Beeper /

avatlable) L_

t 2.3 Leclear Regulatory Commtssion (lfotline; or * /

l

, or Hestth Ihysics Network phone , or ,

2 . '. \rkansas Ucp.irtment of Health l%. ,* (or contact the /

eLS .it *. ,* or vta the OES radio # channel and request 'y them to nutsty the Healtn Department ll. l i

file :!ATERI.il t.uN TAINLU 'ai THIN IHE $\STE!!S (*) IS PRuPHIETARY OR PRIVATE INffUUI51N E hC i

C. a L. 2 L s

r _2 PLANT MANUAL SECTION: PROCEDURE! WORK PLAN TITLE: NO:

EMERGENCY PLAN DD A p p py tp p T PTTT

- _ _ - - - y=M P D_O_U__V F V i PT T. A m.

U. br. cD. over inn 7 in ARKANSAS NUCLEAR ONE aE=oN  ; oATE m,-,

' ' ' ' " ~ '

CHANGE " DATE i

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N EMERGENCY ACTION T.EVEL RESPONSE l FON NO- t on i .1 M REV. F 6 PC a Pue 2 of 2 l DATE INITIALS / TIME 5.3 Direct the implementation of appropriate onsite pro-tective actions.

6. Direct the Facilities Maintenance Coordinator (D. Moore or

/_ _

Bobby Cole; see Attachment 8) to activate the Emergency Control Center.

7. Notify onsite personnel that an Alert has been declared and / _

describe the nature of the alert.

f\

Q 8. Direct operating personnel to closely monitor plant para-meters (particularly those identified with the need to J

3 escalate to a higher Emergency Action Level.) j

9. Perform the duties of the Duty Emergency Coordinator until l relieved of those responsibilities (refer to form 1903.10F).
10. Maintain a log of the incident (this may be delegated to other personnel as available),
11. At the termination of the Emergency Action Level, this Notification List and Record should be turned over to the Duty Emergency Coordinator.

5tilFT <tERAl' IONS SLPERVISGR sr

\

6:

l i

l V - -

6 l

e _r PLANT M ANU AL SECTION: PROCEDUREfWORK PLAN TITLE: NO:

EMERGENCY PLAN PDoCf'fqm r pfror'r"Cy 1CTTtw TrtTY prefw!Rr inno in PAGE no m c g i, ARKANSAS NUCLEAR ONE aEvisioN CHANGE e oATE DATE

~'

ri] ARKANSAS POWER & LIGHT COMPANY Q Arkansas Nuclear One M* FMFRGENCY ACTION LEVEL RESPONSE  ! '0" " 1001.10E REV. g 6 PC i Page 3 of 3 DATE INITIALS /TI"E 2.8.1 Evacuation Team (Attachment ?) /

2.8.2 Fire Team (Attachment 3) /

2.8.3 Medical Team (Attachment 4) /

2.8.4 Radiation Team (Attachment 5) /

2.9 Ceneral Manager e t ,* /

2.10 NRC Resident inspectors (either one) /

2.10.1 *J. Cummins *

}

2.10.2 L.J. Callan *( )* i 1

3. Notify the Duty Emergency Coordinator that the initial /

l notifications have been made (intorm him of any individuals -

that contact could not be made with). l 4 Provide updates to the following groups until relieved of this responsibility:

4.1 Duty Emergency Coordinator 4.2 Nuclear Regulatory Commission (Include all available radiological release information) 4.3 Arkansas Department of Health (at least hourly or as directed) 4.4 Little Rock Control Center (unless otherwise directed)

5. I'nless required to report onstte, at the termination of the / j event. nottty the individuals contacted in Step 2.8 above to secure from "on call" status. Er
6. At the termination of the event, this form and other applicable intormation should be turned over to the Duty Emergency Coordinator.

Stat f t Admintstr3tive Assistant lilE !AllRI AL CONTAIMD 'a f fillN lllE SUututS top IS PROPRIETARY tR PRIVATE INFOR.'IATION.

f b5 n

a m.... . _.'~ w __ m _m.

  • Cr PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN poncentyr rurocrvcv scrrno rrt rr n remnver igna 79

_PAGE q i, ,p g i, ARKANSAS NUCLEAR ONE u==

CHANGE 7 oATE DATE nunm " -

1 4i ARKANSAS POWER & LIGHT COMPANY g Arkansas Nuclear One inLE' E?1ERCENCY ACTION f.EVEL RESPONSE lFONNO. l90L 10H REV d 8 FC #

t'a ge 3 o f 3 DATE INITIALS /TI!!E 2.8 Technical Support Center Personnel (refer to Attachment /

6 for call list).

2.9 Operations Support Center Personnel (refer to Attachment /

7 for call list).

2.10 Other Emergency Response Organization personnel (refer to /

Attachment S for call list).

NOTE: If the Technical Support Center has been activated.

j this center may be requested to contact the desident i.

NRC Inspectors.  !

2.11 NRC Resident inspectors (either one) /

2.11.1 *J. Cummins )*

2.11.2 *L.J. Callan ( ,

1

3. Notify the Duty Emergency Coordinator / Recovery Manager that the /

initial notifications have been made (inform him of any individuals that contact could not be made with).

4. Provide updates to the following groups until relieved of j l responsibility

4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commtssion (Include all available radiological l l

release tnformation) 1 1

4.3 Arkansas Department of Health er Techntcal Operations 1 Control Center (at least hourly or as directed).

I 4.4 Little Rock Control Center ur Emergency Control Center i

, ( u directed).

l l 3. At the termination of the event, thts form and other applicable tnformation L should be turned over to the IJutv Emergency Coordinator /Hecovery Manager.

l dha tt Mmintstrattve Assistant nil 7 rte 7n i.HlIiktins t TTL D uc~nn aiii.s 4 . ) IS PROPHILTANY oR PRIVATE INFO M i C , m -

1 _

1 r 's . a:_V EF ( .F

e- _r PLANT M ANUAL SECTION: PROCEDUREfWORK PLAN title: NO:

- EMERGENCY PLAN orwrnt me tsfr e e rs m v VTinu r rter orennuce innq in

{ PAGE er , r D.

ARKANSAS NUCLEAR ONE aEvisioN CHANGE e oArE

' DATE n,,,n,e,--

ARKANSAS POWER & LIGHT COMPANY 4 Arkansas Nuclear One MLE EMERGENCY ACTION LEVEL RESPONSE l F0" "O 1903.ICK REV. # 8 PC #

Page 3 of 3 DATE INITIALS / TIME 2.7 Technical Support Center Personnel (refer to Attach- /

ment 6 for call list).

2.8 Operations Support Center Personnel (reter to Attach- /

ment 7 for call list).

2.9 Other Emergency Response Organization personnel (refer /

to Attachment 8 for call list).

NOTE: If the Technical Support Center has been activated, this center may be requested to contact the Resident g

NRC Inspectors. ,

2.10 NRC Resident Inspectors (either one) / l, 2.10.1 *1. Cummins )*

i 2.10.2 *L.J. Callan t 1*

3. Notify the Duty Emergency Coordinator / Recovery ?!anager / l that the tnitial notifications have been made (inform him of any individuals that contact could not be made wtth).
4. Provide updates to the following groups until relieved of responsibility:

4.1 Duty Emergency Coordinator / Recovery ifanager 4.2 Nuclear Regulatory Commission (Include all available L~

radiological release intormatton) l 4.3 Arkansas Department of Health or Technical Operations

[ i:ontrol Center (at least hourly or as directed).

4.4 1.ittle Rock Control Center or Emergency Control Center O s .itrccted).

C .

i. At the terminatton ut the event, this torm and other applicable intormattun should be turned over to the Duty hnergency t.oordinator/ Recovery Manager.

7 httt Administrattve Assistant IIIEla il.R I A1.~ "N IAI'.ED Ofil'lOilf.~si':fwdS ( * ' is twl'RIETARY OR l'RIVAIE INFOR?tAlloN.

w_

.n w[ '

-2.~V wE

rr

. PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TkTLE: NO:

EMERGENCY PLAN ppnerf11tpr r*fpkCPsfrv VTintf f ettri peq pos?qr 10n7 in PAGE Aq n g c i, ARKANSAS NUCLEAR ONE aEvision -

' a oATE ni ,,a ro, -

CHANGE DATE I

q ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One gr *  ! '0" "

FMFRCFNCY VTION T Ft.Tf (F R) NOTf FinTf 04 N'- b" REV. 1 1 FC a INSTRUCTIONS Page 1 of 3

  • Provide updates of signtficant status changes (and at least houriy updates if

' there are no significant changes) to the Arkansas Department of Health (exclud-ing the Unusual Event FAL).

.

  • Updates should be nrovided, sia this form, to the Techaical Operations Control l If no answer, call the Little Rock 24-hour switch-

, Center (TOCC) atl .

i board at ,

  • Notitications to the State of Arkansas will require use of Authentication Tables.

If Challenged Message Authenticated By:

A B C D E F G H I J K L M N 0 (None)/

Edtcate .ilphabettcal chJracters challenged Response Gtven j

  • Begin transmission with the following statement: This is lidentifv vourself) at Arkansas Nuclear One with an Emergency Action Level Notitication Neport, g Acknowledge when you are ready to proceed. ,

1

1. Message No. (messages shall be numbered sequentially from the beginning of the event)
2. Date/ Time of Message

__DD MON YY Rh.T!

3. N/A 1
4. Message Sent By: / 8 Same Positton
5. Unit: ( ) One ( ) Two
6. Cl.:t of EAL:

I n

( ) A. Courtesy Call ( ) D. Site Emergency l

( ) 8. I'nusual Event ( ) E. General Emergency l

( ) C. Alert Lr l

7. Date/ Time of Latest Declaration l

Ou floN YY 10001

  • STOP HERE FOR Not!FICAT!oN of LITTLE ROCK GAIROL CENTER ONLY
8. Condition Requiring Notttication (No Ch.inee ( )]

C 9 l

t i

_ r s

[ O l'3 N WR C9tkI5 1. CALL __fL F 7

_ . __ _[ j

-=

a suC .GV ( nV

, r- _r PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO: )

EMERGENCY PLAN I DD A f'P D f 'D P U

  • f D D Fr t.'tT 9 t**f' T A * ' T r t 'r Y D e c Dn t'c r inn, in Cn ..f ( f.

3 ARKANSAS NUCLEAR ONE as-N CHANGE

% oArt DATE A,,,e,e,-

ARKANSAS POWER & LIGHT COMPANY i 4 Arkansas Nuclear One MLE EMERGENCY ACTION I.ESTL (EAL) NOTIFICMION l F0" NO- 1901.10M l REV. # o PC #

Page 2 of 3

9. Onsite Situation (Che(k only appropriate responses)

A. Prognosis of Situation

( ) Stable

( ) Degr.iding

( ) Improving B. AP&L Radiation Teams

( ) Activated

( ) Not Activated g C. Local Assistance Reiluested:

i

( ) None

( ) Fire

( ) Police

( ) Ambulance

( ) Other D. Evacuation of Onsite Personnel:

( ) Yes l ( ) No i ( ) Some E. Emergency Centers Activateel

( ) None

( ) ISC

( ) ECC

f. Other Emergenty 1:esponse Actions linderway:

LT

10. Radioloin t al clease is:

( ) '.o t i spec t e.1 t ) Eminent

( ) ottinring 4 I *)

et l i n Re' r O L'( la r r i n R (em

^

~

h P I1f Id ,f f Tinkh,lI}1.f k f bh. p1.I.,}. kb[~ lSj[

j j fXl h,()Ih [tjllR _

O .=

L,.. _ it -- L -

r.E PLAN'T MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN 0 5 f r D ('r t'PV T rt'r T DrcDAver ,nn7 ,A D D A r r n f 'D r ---

4. /'T T A" uoE- ,, _ , t ,.

O ARKANSAS NUCLEAR ONE -CHANGE ar=a A,~,e," -

e OAT =

' ~~'

' DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N FMFRCFNrY ArTiny rnTT (rar) NnTiptrATinN l '0" "O' 'on1.10M REV. # 6 PC #

Page 3 of 3

11. Type of Release:

( ) Airborne

( ) Waterborne

( ) Surface Spill

12. Areas Affected by Radinlcrical Release (Sectors / Distance):
13. Description of Release Material (Chemical and Physical Form, Estimate of Equivalent Curies of I-131 and XE-133 Released Release Rate (Ci/sec),

Iodine / Noble Gas Ratto, etc.)-

i

14. A. Wind Direction: (From)
  • I B. Wind Speed: mph

)

15. Tempe ra tu re : 'F
16. Precipitation: A. ( ) Yes ( ) No ( ) Occasional B. Form i
17. Atrospheric Stability Class:
18. Estimated start time and duration of the release:

Start Duration l 19. Dose Rate at the Excluston Area Boundary (0.65 miles)

]

Check one: g l

( ) Projected mR/hr Child Thyroid s.r or

( ) Actual mH/hr bhcle B<>dy

20. Protected Dose at miles:

mH/hr Whole flody mR/hr t h tld fl.yroid C"

21. RDLTRKS : _ _ _ _ . . _ _ _

. .a .

M

PLANT,M ANU AL SECTION: PROCEDURE / WORK PLAN Tl LE: NO:

EtERGENCY PLAN m , e m- .e ,- , , , , , , ,

,-..m.

m , m r e. m . .., -

a asvus uvits

...-.>u,a.

a 6 ma stuu a w a A v.i u s. aha .

v .vv asvs.

ARKANSAS NUCLEAR ONE atvisioN i "dATc , , ., e , e ,

CHANGE DATE ATTACIIFENT 2 EtIERGENCY EVACUATION TEAff R0.",TER/ CALL LIST BADGE WORK HOFE TEAT! LEADER:

  • Jackie Crow ALTERNATE TEA!! LEADERS:
  • J. C. Garrett *
  • Bruno Hampton
  • Wes ticDaniel FIE!!BERS:
  • flike ?!yers
  • John Beaty, Jr. *
  • Roger flooper '. *
  • James Starr *
  • Barbara Wade *
  • Barbara Dunn
  • Jim Wilson I
  • Ira ?!osquito ',*

1

  • Gary Johnson
  • Wayne Brock
  • Burl Neal TIE ?!ATERI AL CONTAINED WITilIN TIIESF SYt!BOLS (*) IS PROPRIETARY OR PRIVATE INFORilATION.

PROCEDUREN40RK PLAN TITLE: NO:

PLANT M ANUAL SECTION:

EFERGENCY PLAN ,n J noncem or --

orennuer estr.ocevcv sc-rno r re. r r. ,j,g inn, saem nEvisioN "e o*TE-

, ARKANSAS NUCLEAR ONE CHANGE

~

DATE n , ,, e , e ,

ATTACilllENT 3 EMERGENCY FIRE TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER:

' Jim Bob Jackson ALTERNATE TEAM LEADERS:

i

  • Larry Munson
  • David Eichenberger  ?

l MEMBERS:

  • Charles May
  • Barry Waldron
  • Tom Wilkins e
  • Glenn Brooks i
  • Chester Wetzel
  • Johnny Walker
  • Marion IIall
  • Tim A. Smith Tile flATERIAL CONTAINED WITIIIN TilESE SYMBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION.

,-y

i 1

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TliLE: NO:

Et1ERGENCY PLAN I --_DROCFm ric rurpce cy ,c7tc ;g;;r neconoce gge ,g PAGE' e .,

.r e= a m$ ARKANSAS NUCLEAR ONE Revision '; oArE m,,e,-,

CHANGE DATE ATTACHMENT 4 EMERGENCY FEDICAL TEAM ROSTER / CALL LIST NOTE: During non-routine working hours, notify the Shift Maintenance Medical Team - 3142/3411.

BADGE WORK HOME TEAM LEADER:

  • Dennis Calloway ALTERNATE TEAM LEADERS: $
  • Charles Adams MEMBERS:
  • Richard Moredock *
  • Steve Stork
  • Mike Hoyt
  • Gerald Bartlett - *
  • Debby Moore
  • Bill McCord
  • Wayne Cheatham
  • Shirman Yancy
  • KaSandra Delph I
  • Eileen Goulet  ?

l

  • Paul Ford ,

\

  • Curt Bailey THE MATERIAL CONTAINED WITHIN THESE SYMBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION.

l

- - - ~ . , ..n

M _

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TliLE: N O-EMERGENCY PLAN noncemme -- .rocevce s ce. .r n.e.

est- - v r e, rr neceni ce

.. u . u a . n, n , in ARKANSAS NUCLEAR ONE aEviSioN CHANGE

"; oATE

" DATE

., , , , e , e ,

' ' ' ~ " ' " '

ATTAC101ENT 8 REMAINING EMERGENCY RESPONSE ORGANIZATION (PLANT STAFF) ROSTER / CALL LIST NAME BADGE WORK H0ffE

  • L. W. Humphrey *
  • J. D. Moore .*
  • R. L. Cole
  • W. E. Converse *
  • Morton
  • 1 *K.

L. S. Bramlett 'e

*M. A. Smith *
  • M. J. Konya *
  • D. B. Lomax *
  • R. M. Copp .*
  • R. T. Blankenship
  • EMERGENCY CONTROL CENTER C0ftflUNICATIONS PERSONNEL ROSTER / CALL LIST
  • G. D. Provencher *
  • J. R. Brown *
  • R. M. McFarland *
  • R. M. Cooper *
  • B. L. Bata -. .- __.. - - .- --

1*

TECIINICAL ADVISORY PERSONNEL ROSTER / CALL LIST

  • J. Vandergrift  !*

\

'J. Waid *

  • D. Barton e
  • R. liargrove *
  • J. Simmons *

) *E. Force je

! -/ THE ?!ATERIAL CONTAINED WITHIN THESE SYMBOLS ~(*) 15 FMuexfETARY OR PRIVATE l

INFORMATION.

b