uNiTro svaras NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D. C. 20885 e
~,
- % ' A f
p POWER AUTHORITY OF THE STATE F NEW YORK DOCKET NO. 50-3 h JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendnent No. 73 License No. DPR-59 1.
The Nuclear Regulatory Connission (the Connission) has found that:
A.
The application for amendment by the Power Authority of the State of New York (the licensee) dated February 10, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) cnd the Commission's rules and regulations set forth in JO CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Connission; There is reasonable assurance (1) that the activities authorized C.
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Connission's regulations; The issuance of this amendment will not be inimical to the connon D.
defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CPR Part 51 of the Connission's regulations and all applicable mquirements have been satisfied.
/
/
r 8303290158 830311 PDR ADOCK 05000333 P
2.
Accordingly, the' license is amended by deleting paragraph 2.E.(2) and by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.73, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2
~
Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: March 11,1983
_a_
ATTACHMENT TO LICENSE AMENDMENT NO. 73 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Replace the following pages of the Appendix B Technical Specifications with the enclosed pages as indicated. The revised pages are identified by Amendment number and contain vertical-lines indicating the area of change.
Remove Insert i
i iii iii iv iv 1
1 2
2 3-5 3
16a-32 16a 33 33 39 39 40
.40_
,&e99Mb=*
wna-
+ -
,-p3,-,-
m m
CONTENTS Page 1.0 Definitions...........................................
1 2.0 Protection Limits.....................................
2 2.1 (Deleted) 2.2 (Deleted) 2.3 Radioactive Discharge............................. 6 3.0 (Deleted) 4.0 Environmental Surveillance and Special Study Programs. 33 4.1 (Deleted)
~~'
4.2 (Deleted) s 4.3 Environmental Radiological Monitoring............. 33 l
l Amenement No.
73 i
.,,.-.-----,,.,e
.-n.---.[.,
LIST OF TABLES Page 1
4.3-1 Sample Collection and Analysis NMP-JAF Sid:e Radiological Environmental Monitoring Pro, ram..
34 O
e Me g 9
9 l
l t
{
AmendmentNo.
73 iii l
List of Figures Page 5.2-1 Plant Organization - Environmental..........
43 5.2-2 Management Organization - Environmental.....
44 s
9 e
w "M
%s O
t Amendment No.
73 iv e.
1 1.0 Ddfinitions Normal Plant Operation is with the reactor critical and above one percent rated power and in conformance with the re-quirements of the Technical Specifications.
Sample. Material gathered, such as water or fish, for the purpose of analyzing for a certain parameter or characteristic.
Sub-sample. A sample which is divided in a uniform manner so as to make the analysis of the smaller portion representative of the total sample.
For example, a large sample of fish would be divided into a smaller sample with the same ratio of species and weight of fish as the whole sample.
s l
l l
l l
l Amendment No.
73
m l
/
d d
e e
t t
e e
l l
S e
e N
d d
O I
y y
T l
l 2
A l
l R
a a
E n
n P
o o
O i
i t
t R
n n
O s
e e
F t
t t
i n
n S
m i
i 3
N i
7 O
L n
n I
o o
T n
i i
I o
t t
D i
c c
N t
e e
o O
c s
s N
C e
t s
s t
G o
i i
n N
r h
h e
I P
T T
m T
d I
n M
0 1
2 em I
L 2
2 2
A
Pages 3 -5 Intentionally deleted.
s i
l i
?
Amendment No.
73 3
1
1
-s Pages 16a -32 Intentionally deleted.
e r
I I
Amendment No.
6 73 16a e
4.0 Environmental' Surveil'1ance and Special Study Programs 4.1 (Deleted) 4.2 (Deleted) l 4.3 Environmental' Radiological' Monitoring
~
OBJEurAvB An environmental radiological monitoring program shall be conducted to evaluate the effects of station operation on the environs and to verify the effectiveness of the controls on radioactive materials sources.
SPECITICATION An environmental radiological monitoring program shall
~
be conducted as follows:
1.
The environmental radiation monitoring program specified in Table 4.3-1 shall be conducted.
2.
Reporting requirem nts for the environmental radiological monitoring program are outlined in Sect. 5.5, Plant Reporting Requirements.
3.
During the seasons that animals producing milk for human consumption are on pasture, samples of fresh milk shall be obtained from these animals i
at the frequencies and number of locations shown in Table 4.3-1 and analyzed for their radiciodine content, calculated as I-131.
Analysis shall be carried out within eight days (one I-131 half-life)
-of sampling.
Suitable a2.alytical procedures shall be used to determine the radiciodine concentration to a sensitivity of 0.5 picocuries per liter of milk at the time of sampling.
For activity levels at or above 0.5 picocuries per liter, overall error (one sigma confidence level) of the analysis shall be within +
25 percent.
Results
[
shall be reported, with associated calculated I
error, as picoeuries of I-131 per liter of milk j
at the time of sampling.
Amendment No. )Hf 73 33
5.5.2 Plant Operating Procedures include provisions, in addition to the procedures specified in Section 5.5.1, to ensure that all plant systems and components are. operated in compliance with the limiting conditions.for operations established as part of the Environmental Technical Specifications.
5.6 PLANT REPORTING REQUIREMENTS 5.6.1 Routine Reports Annual Environmental Operating Report a.
(This part intentionally delet6d. )
A report on the radiological environmental surveillance programs for the previous 12 months of operation shall be submitted to the Director of the NRC Regional Office (with a copy to the Director, Office of Nuclear Reactor Regulation) as a separate document within 90 days after January 1 of each year.
The period of the' first report shall begin with the date of initial criticality.
The reports shall include summaries, interpretations, and statistical evaluation of the results of the radiological environmental surveillance activities for the report period, including a comparison with preoperational studies, operational controls (as appropriate), and previous environmental surveillance reports and an assessment of the observed impacts of the plant operation on the environment.
The reports shall also include the results of land use censuses required by the Technical Specifications.
If harmful effects or evidence of irreversible damage are detected by the monitoring, the licensee shall provide an analysis of the problem and a proposed course of action to alleviate the problem.
i Results of all radiological environmental samples taken shall be summarized and tabulated on an annual basis.
In the event thdt some results are not available within the 90 day period, the report shall be submitted noting and explaining the reasons for the missing results.
The missing data shall be submitted as soon as possible in a supplementary report.
l K, pd 73 I
39 Amendment No.
b.
Ra'dioactiva Effluant Release Report A report on the radioactive discharges released from-the site during the previous 6 mor.ths of operation shall be (with a sub=itted to the Director of the NRC Regional Office copy to the Director, Office of Nuclear Reactor Regulation)
The within 60 days after January 1 and July 1 of each year.shall begin with th period of the first repor shall includo a su==ary of the quan-criticality.
The report tities of radioactive liquid and gaseous effluents and solid waste released from the plant as. outlined in Regulatory Guide l
" Measuring, Evaluating, and Raporting Radioactivity Dr J
Solid Wastes and Releases of Radioactive Materials in Liquid 1.21, and Gaseous Effluents from Light-Water-ccoled Nuclea format of Appendix B chereof.
The report.shall include a su..iary of the rateorolo-during each quarter as outlined in Regulatory Guid data su==afi:ed en a quarterly basis. follcwing the for=at of Appendix B thereof.
l 5.6.2 Nonroutine Reports Nonroutine Environmental Operating Feports a.
(a) a A report shall be sbE=itted in,the event that (as specified in limiting condition fer operation is exceeded" Limiting Conditions Section 2,
'impo'rtant eve'nt occurs that causes a significant environmental impact.
Those events requiring prompt (1)
Prompt Report.
reports shall be reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone, tale-graph, er facsimile transmission to the Director of the NRC to the Regional Office and within 14 days by a written report (with a copy to th l
Director of -the Ragional Of fice l
Office of Nuclear Reactor Regulation).
These events not. requiring prompt (2) 30-Cay Report.
to reports shall be reported within 30 days by a written report the Director of the NRC Regional Of fice. (with a copy to the Director, Office of Nuclear Reactor Regulatich).
(Written 14-day and 30-day reports.and, to the extent telegraph, or facsimile possible, the preliminary telephonc, and evaluate the occurrence, t
l (a) describe, analy:e, (b) describe t(.c repor:s shall including entent and magnitudo of the i= pact,indi cate the c rrective~ -action cauro cf the occurrenec, and (c) taken to (including any significant changes made in procedures) preclude repetition of the cecurrence and to prevent similar occurrences idvolving similar components or systems.
l A=encrent !!o.
73 40
--