Forwards Calculate post-LOCA Bounding Drywell Temp Profile, Per 830510 Rev 20 Changes to FSAR Section 3.11,in Response to Containment Sys Branch Draft Ser,Item 4
ML20072G221
Person / Time
Site: Limerick  
Issue date: 06/24/1983
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8306280381
Download: ML20072G221 (4)


Text

m-e PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 1881 1981 PHILADELPHIA. PA.19101 (215) 841-4 5o 2 JOHN S. KEMPER UIC E-PR ESID E N T E NG9hE E AING AND 89ESE A f9CD4 June 24, 1983 Mr.

A.

Schwencer Licensing Branch No. 2 Division of Licensing U.

S.

Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Limerick Generating Station, Units 162 Information for Containment Systems Branch (CSB)

Re ference :

PECO letter from E.

J.

Bradley to A.

Schwencer dated May 10, 1983 File:

GOVT l-1 (FSAR)

Dear Mr. Schwencer:

The reference letter transmitted changes to FSAR Section 3.11 in response to CSB draft SER issue number 4 and stated that these FSAR changes would be incorporated into the FSAR in June.

FSAR Section 3.11 was completely revised in revision 20 in May.

The changes made by revision 20 supercede the changes transmitted via the reference letter.

The revision 20 changes to Section 3.11 deleted all tables and figures from Section 3.11 and made reference to the Equipment Qualification Report (EQR) as the source of this information.

To ensure consistency of information between the FSAR and EQR a review;was performed of FSAR figures 6.2-8 and 6.2-9 against the drywell temperature profile in Appendix C of the EQR.

Utilizing better resolution profiles of figures 6.2-8 and 6.2-9 from GE, minor discrepancies of I or 2 F were found, except for t=3 days for which there was an 11 F difference.

A draft copy of the revised drywell profile from the EQR is attached.

This figure envelopes the wetwell and will be used for equipment qualification in the wetwell.

Adequate margin exists in the current equipment qualification program to accommodate these changes, and the new temperatures will be incorporated into the next revision of the EQR as figure 3, Appendix C.

o 8306280381 830624 A fh8!

PDR ADOCK 05000352

[O E

PDR

. This should satisfactorily close CSB draft SER issue 4.

Sincerely, SCf SAJ/gra/35 Copy to:

See Attached Service List

7 cc: Judge Lawrence Brenner (w/ enclosure) 1 Judge Richard F. Cole (w/ enclosure)

Judge Peter A. Morris (w/ enclosure)

Troy B. Conner, Jr., Esq.

(w/ enclosure)

Ann P. Hodgdon (w/ enclosure)

Mr. Frank R. Romano (w/ enclosure)

Mr. Robert L. Anthony (w/ enclosure)

Mr. Marvin I. Lewis (w/ enclosure)

Judith A. Dorsey, Esq.

(w/ enclosure)

Charles W. Elliott, Esq.

(w/ enclosure)

Jacqueline I. Ruttenberg (w/ enclosure)

Thomas Y. Au, Esq.

(w/ enclosure)

Mr. Thomas Gerusky (w/ enclosure)

Director, Pennsylvania Emergency Management Agency (w/ enclosure)

Mr. Steven P._ Hershey (w/ enclosure)

Donald S. Bronstein, Esq.

(w/ enclosure)

Mr. Joseph H. White, III (w/ enclosure)

David Wersan, Esq.

(w/ enclosure)

Robert J. Sugarman, Esq.

(w/ enclosure)

Martha W. Bush, Esq.

(w/ enclosure)

Spence W. Perry, Esq.

(w/ enclosure)

Atomic Safety and Licensing Appeal Board (w/ enclosure)

Atomic Safety and Licensing Board Panel (w/ enclosure)

Docket and Service Section (w/ enclosure)

e l

3so DRAF2.-

310'F 3 HRS

,5 m

t 3

212'F N8 t =6 HRS F

200 t = 12 HRS MF

/b7

'tSA. F t=36HR$

145'F t = 3 DAYS j

t = 11.6 DAY $

122'F N 112'F S

12HR$

24 HR$

2 DAYS 3 DAYS 11.8 DAYS 23.2 D AYS l 180 DAYS j

100 81 DAYS.

TIME 4

LIME RICK GENER ATING 'STA. flON UNITS 1 AND 2 SPECIFICATION 80314171 CALCULATED POST LOCA BOUNDING DRYWELL TEMPERATURE PROFILE

~

~

C-22 FIGURE 3

~~

__