ML20072E652

From kanterella
Jump to navigation Jump to search
Ro:On 830527,containment Pressure Control Sys Monthly Surveillance Not Performed at Required Interval & When Performed,Pressure Found Out of Allowable Limits.Analysis Incomplete.Repts Will Be Submitted by 830624
ML20072E652
Person / Time
Site: McGuire, Mcguire  
Issue date: 06/09/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8306270094
Download: ML20072E652 (1)


Text

.

DUKE POWER GOMPANY P.O. Box 33180 CHAHLOTTE. N.C. 28242 HALH. TUCKER TELEPHONE me essernswv (704) 373-4531 waamas emosnworson June 9, 1983 Mr. James P. O'Reilly, Regional Administrator m

U. S. Nuclear Regulatory Commission W

qC Region II c-N 101 Marietta Street NW, Suite 2900

?j Atlanta, Georgia 30303 tO rg 7

. :D lp OO Re: McGuire Nuclear Station Units 1 and 2 c5 rc P@

Docket Nos. 50-369 and 50-370 g

O O..

O g~

Dear Mr. O'Reilly:

On May 27, 1983 your staff was notified t. hat the Containment Pressure Control System monthly surveillance required by T.S. 4.3.2.1 Table 4.3-2 (Functional Unit #6) was not performed at the required interval for either Unit 1 or 2, and when performed it was found out of allowable limits. Pursuant to T.S.

3.3.2 which is reportable per T.S. 6.9.1.10(f), Reportable Occurrence Reports R0-369/83-30 (Unit 1) and R0-370/83-19 (Unit 2) were to have been submitted by June 9, 1983. However,-analysis being performed necessary for the com-pletion of the reports is not yet finished. The complete reports will be submitted by June 24, 1983.

Very truly yours, d

(<

Hal B. Tucker PBN:j fw cc: Document Control Desk Records Center U. S. Nuclear Regulatory Commission-Institute of Nuclear Power Operations Washington, D. C.

20555 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station opMCIM CO 8306270094 030609

gggJ, DR ADOCK 05000 y

/4

.