Text
-.
Umerick Osnarating Ststi n a.
my PECO ENERGY
- "f;;r~*"
Sanatoga. PA 19464 0920 T.S.6.9.1.6 August 10, 1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of July, 1994 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, (J)uk-A mes A. Muntz Director - Site Engineering sjk Enclosures cc:
T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)
N.
S. Perry, USNRC Senior Resident Inspector LGS (w/ enclosures)
D.
R. Helwig, Vice President, Limerick Generating Station 100C?J 1000'T1 I
f<' A j
9408190217 940731 PDR ADOCK 05000352
/'
I R
Docket No. 50-352 Attachment to Monthly Operating Report for July 1994 Limerick Generating Station Unit 1 July 1 through July 31, 1994 I.
Narrative Summary of Operatina Exneriences Unit 1 began the month of July at a nominal 100% of rated thermal power (RTP).
Power was reduced a number of times during the month of July as a result of high turbine backpressure.
On July 9, 1994, at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> power was reduced for condenser maintenance activities and to perform other testing activities.
Power was reduced to 75% RTP.
At 0104 hours0.0012 days <br />0.0289 hours <br />1.719577e-4 weeks <br />3.9572e-5 months <br /> on July 10, 1994, power was restored to 100% RTP.
On July 29, 1994, at 1342 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.10631e-4 months <br /> the
'C' Reactor Feed Pump (RFP) tripped off.
This resulted in an automatic Reactor Recirculation Pump runback.
Power was stabilized at 80% RTP at 1348 hours0.0156 days <br />0.374 hours <br />0.00223 weeks <br />5.12914e-4 months <br />.
The cause of this event was that a housekeeping individual changing lights inadvertently hit the mechanical trip lever on the feedpump local panel.
The
'C' RFP was returned to service at 1520 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.7836e-4 months <br /> and power was restored to 100% RTP at 1645.
Unit 1 ended this operating period at 100% of RTP.
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of July.
i
AVEROGE DAILY UNIT PODER LEVEL DOCKET NO. 50 - 352
/
UNIT LIMERICK UNIT 1 DATE AUGUST 10.1994 COMPANY PECO ENERGY COMPANY STEVEN J.
KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION
?ELEPHONE (610) 327-1200 EXTENSION 3763 MONTH JULY 1994 DAY AVERAGE DAILV POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1039 17 1041 2
1039 18 1038 3
1036 19 1035 4
~1037 20 1032 l
5 1037 21 1027 6
1012 22 1033 7
1026 23 1041 8
998 24 1026 9
780 25 1046 10 1056 26 1040 11 1049 27 1041 12 1042 28 1062 13 1037 29 999 14 1036 30 1039 l
15 1036 31 1041 16 1041
_______________-____-_-__a
. p.
OPERATING DATA REPORT DOCKET NO. 50 - 352 DATE AUGUST 10.1994 COMDLETED BY PECO ENERGV COMPANY STEVEN J.
KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 OPERATING STATUS 1.
UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WAS ONE LOAD DROPS 2.
REPORTING PERIOD:
JULV. 1994 GREATER THAN 20% DUE TO 3.
LICENSED THERMAL POWER (MWT):
3293 CONDENSER MAINTENANCE 4 NAMEPLATE RATING (GROSS WWE):
1138 ACTIVITY.
- 5. DESIGN ELECTRICAL RATING (w" MWE):
1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
2 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1055 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET WWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5.087 74.471 l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4.236.2 60.435.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 4.179.7 59.364.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.426.587 12.976.589 182.427.348
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 791.100 4.220.290 59.262.330 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 764.188 4.068,185 56.854.175 l
l r
PAGE 1 OF 2
^
OPERATING DATA REPORT (CONTINUED)
DOCetET NO. 50 - 352 DATE AUGUST 10,1994 THIS MONTH VR_TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 82.2 79.7
- 20. UNIT AVAILABILITY FACTOR 100.0 82.2 79.7
....______~_
21 UNIT CAPACITY FACTOR (USING MDC NET) 97.4 75.8 72.4
..-______~_.
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.4 75.8 72.4
- 23. UNIT FORCED OUTAGE RATE 0.0 1.3 4.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITV MID APRIL 85 4/13/85 COMMERCIAL OPERATION 1ST QTR 86 2/01/86 PAGE 2 OF 2
.a,
UNIT SHUTDOWNS QND POWER REDUCTIONS DOCRET NO. 50 - 352 UNIT MoME LIMERICK UNIT 1 DATE AUGUST 10.1994 REPORT MONTH JULY. 1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J.
KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763
- - - - - -... - - - - - - -. - - - _ - _ _ - - - _ _ _ - - -... - _ - - - - _ _ _. - - -.. - _ - - - - - - - - _ _ _ - _ _ _ _.. - - _ - - - -. - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - ~ ~ - - - - - - - - - -
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.i DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT *
(4)
(5)
PREVENT RECURRENCE
_---c....-------
24 940706 S
000.0 H
4 N/A HF TURBIN REACTOR POWER WAS REDUCED TO 95%
DUE TO HIGH TURBINE BACK PRESSURE.
25 940709 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 75%
TO SUPPORT CONDENSER CLEANING.
26 940721 S
000.0 H
4 N/A HF TURBIN REACTOR POWER WAS REDUCED TO 96%
DUE TO HIGH TURBINE BACKPRESSURE.
27 940729 5
000.0 H
4 N/A CH PUMPXX REACTOR POWER WAS REDUCED TO 80%
DUE TO A REACTOR FEED PUMP TRIP.
i (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE.
(5)
'G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE f
- _ _ - = _ _ - - _ _ _ _ _ _. - _ - _ _ _ _ _ _ _ - - _. _., -.. -
~
Docket No. 50-353 Attachment to Monthly Operating Report for July 1994 Limerick Generating Station Unit 2 July 1 through July 31, 1994 I.
Narrative Summary of Operatina Experiences Limerick Unit 2 began the month of July at a nominal 100% of Rated Thermal Power (RTP).
Power was reduced slightly on July 8 and 9, 1994 due to high turbine backpressure.
On July 3, 1994, at 0835 hours0.00966 days <br />0.232 hours <br />0.00138 weeks <br />3.177175e-4 months <br /> power was reduced to 90% RTP for main turbine valve testing and control rod pattern adjustment.
Power was restored to 100% RTP at 1027 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.907735e-4 months <br />.
On July 23, 1994, at 0828 hours0.00958 days <br />0.23 hours <br />0.00137 weeks <br />3.15054e-4 months <br /> power was reduced to 91% RTP for main turbine valve testing and a control rod pattern adjustment.
Power was restored to 100% RTP at 1005 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.824025e-4 months <br />.
Unit 2 ended this operating period at 100% of RTP.
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of July.
i
DVERAGE DAILY UNIT POWER LEVEL
' ~
DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2 DATE AUGUST 10.1994 COMPANY PECO ENERGY COMPANY STEVEN J.
KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 MONTH JULY 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1054 17 1052 2
1055 18 1052 3
1047 19 1045 4
1055 20 1043 5
1053 21 1044 6
1047 22 1045 7
1051 23 1039 8
1029 24 1040 9
1038 25 1058 10 1050 26 1050 11 1061 27 1053 12 1054 28 1072 13 1049 29 1032 14 1048 30 1048 15 1052 31 1053 4
16 1047 n
m
OPERATING DATA REPORT I'
DOCKET NO. 50 - 353 DATE AUGUST 10.1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J.
MELLEY REPORTS ENGINEER SITE ENGINEERING
+
LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 OPERATING STATUS 1
UNIT NAME: LIMERICK UNIT 2 NOTES: THERE WERE NO LOAD DRO" 2.
REPORTING PERIOD:
JULY. 1994 GREATER THAN 20% THIS 3.
LICENSED THERMAL POWER (MWT):
3293 MONTH.
4 NAMEPLATE RATING (GROSS MwE):
1138 5.
DESIGN ELECTRICAL RATING (NET MwE):
1055 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 7.
MAXIMUM DEPENDABLE CAPACITY (NET MwE):
1055 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5.087 39.983
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5.087.0 35.729.6
- 13. REACTOR RESERVE SHUTDOWN HOUR 5 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 5.087.0 35.033.7
- 15. UNIT RESERVE SHUTDOWN HOURS J.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.446.439 16.669.177 111.974.258
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 809,120 5.573.880 37.066.406
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 780.373 5.384.509 35.715.201 PAGE 1 OF 2
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 353
~
e DATE AUGUST 10,1994 THIS UONTH YR-TO-DATE CUUULATIVE
- 19. UNIT SERVICE FACTOR 100.0 100.0 87.6
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 87.6 21 UNIT CAPACITY FACTOR (USING MDC NET) 99.4 100.3 84.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.4 100.3 84.7
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 3.5 t
24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TVPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
5
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 b
I e
i PAGE 2 OF 2 h
e
+eg y
m a
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 UNIT NAME LIMERICK UNIT 2 DATE AUGUST 10.1994 REPORT MONTH JULY. 1994 COMPLETED BV PECO ENERGY COMPANY
~~------------
STEVEN J.
KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 327-1200 EXTENSION 3763 l
METHOD 05 l LICENSEE SYSTEM COMPONENT:
CAUSE AND CORRECTIVE TYPE DURATION! REASON SHUTTING DOWN!
EVENT CODE CODE ACTION TO NO.
CATE (1)
(HOURS)l (2)
REACTOR (3) l REPORT *
(4)
(5)
PREVENT RECURRENCE 11 340703 S
000.0 8
4 N/A HA INSTRU REACTOR POWER WAS REDUCED TO 90% FOR MAIN TURBINE VALVE TESTING.
12 940708 5
000.0 M
4 N/A HF TURBIN REACTOR POWER WAS REDUCED TO 97% DUE TO HIGH TURBINE BACKPRESSURE.
N/A HF TURBIN REACTOR POWER WAS REDUCED TO 98% DUE 13 940709 S
000.0 H
4 i
TO HIGH TURBINE BACKPRESSURE.
14 940723 S
000.0 B
4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 91% FOR A CONTROL ROD PATTERN ADJUSTMENT.
(3)
(4)
(1)
(2) e F - FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE i