"" T IN01 NA & MICHIGAN ELECTRIC COMPANY DONALDT. COOWNUCLEAKPEANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 June 3, 1983 Mr. J.G.
Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm my verbal report to your Mr.
E.R. Swanson at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br /> on June 3, 1983.
At this time I informed Mr.
Swanson that upon exiting the Unit 2 upper containment through the airlock our Maintenance personnel discovered that a gauge had been removed from the outside wall of the outer airlock door thus providing a vent path from containment to the Aux Building when the inner airlock door is open for entry and egress.
The Maintenance men immediately notified the Operations Department of this problem and proceeded to reinstall the pressure gauge.
Upon reinstallation the gauge fittings were checked for leaks utilizing the snoop technique which revealed no leaks.
As required by Technical Specification 6.9.1.12 a follow-up letter will be submitted within 14 days.
Sincerely, Ef%w&y E.L. Townle Asst. Plant Manager
/jas cc:
J.E. Dolan R.O. Bruggee EPRI R.S. Hunter PNSRC M.P. Alexich G. Charnoff, Esq.
D. Wigginton, NRC E.
Swanson/N. DuBry R.F.
Kroeger J.F. Stietzel B.
Germano W.G. Smith, Jr.
R.C. Callen MPSC Dir., IE (40 copies)
J.M. Hennigan Dir., MIPC (4 copies)
INPO$
' 8306210325 830603 lit M O 40C0 PDR ADDCK 05000316 vun u Ivuv i fgp \\ l S