ML20072C667
| ML20072C667 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 01/03/1983 |
| From: | Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML20072C648 | List: |
| References | |
| NUDOCS 8303080505 | |
| Download: ML20072C667 (3) | |
Text
OPERATING DATA REPORT DOCKET NO.
50-255 DATE 1-1-R7 CO31PLETED BY _DPetotson TELEPHONE (616) __764-891:
OPERATING STATUS
- 1. Unit Name:
Pa1isades N tes
- 2. Reporting Period:
R21201-R?1711
- 3. Licenwd Thertnal Power 131W ):
2530
- 4. Nameplate Rating (Gross 5tWe):
811.7
- 5. Design Electrical Rating (Net $1We):
805
- 6..\\faximum Dependable Capacity (Gross 31We): *675
- 7. 5!aximum Dependable Capacity (Net SIWE):
- 635
- 8. If Change Occur in Capacity Ratings (1: ems Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lesel To Which Restricted. If Any (Net 31We):
- 10. Reasons For Restrictions.If Any:
This 31onth Yr..:o Date Cumulatise
- 11. Hou:s in Reporting Period 744 97An 4 735
- 12. Number Of Hours Reactor Was Critical 744 5199.8 91_097 n
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line
-7aa 4.75.0.-5
" 44h 9-
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (51WH)
,1441,424 ll 229 128_ IA2,636,792
- 17. Gross Electrical Energy Generated (.\\1WH) 588,63.0
,,3,541,970 L 769,920
- 18. Net Electrical Energy Generated (S!WH) 559,221 3,345,123 29,858,056
- 19. Unit Sersice Factor 100 c; d 7 c;7 7
- 20. Unit Availability Factor 10_0 54.7 52.7
- 21. Unit Capacity i.ictor (Using '.lDC Net) 118.4
- 22. Unit Capacity Factor (Using DER Net) 93.4 60.1 48.6 47.4-38.3
- 23. Unit Forced Outage Rate 0
45.3 34.6
- 24. Shutdowns Scheduled Oser Nest 6 \\lonths (Type. Date.and Duration of Eacht:
- 25. If Shur Down At End Of Report Perind. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITI A L CRITICA LITY INITI A L ELECTRICITY CO\\t\\1ERCI \\ L OPER A TION
- Based on Condenser Backoressure 8303000505 030110
("!M)
PDR ADOCK 05000255 R
AVERAGE DAILY UPitT POWEn Lgynt C
50-255 DOCKET NO.
UNIT Palisades DATE l-10-83 COMPLETED DY DPeterson TELEPHONE (616)T6h-8913, MONTH no e n-s e,., opp DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL DlWe Net)
D1We Net) 1 Tho 716 17 Tho 2
38 751 Th8 3
[
19 758 4
762 756 20 5
746 756 21 755 75h 6
22
.7 7sf
'I
-C-S 757 752 24 i
759 9
25 751 762
~
30 758 26 757 11
~
27 756 12 759 28-753 I3 758 g
4 l8 756 30 721 15 758 31 737 753 INSTRUCTIONS
%I[ (24', h jg g, c.,.,~,.,,..,,,,,.c...,,,,,,1,,,
b k
,L3{
,j]g' l
F7/773 I
i i
1 r
,,.-,.,7
-,_-.mm
.n_,,,.._.
._y... _ _.. _,_o
r s,
o StBNARY $F OPERATING EXPERIENCE FOR THE MONTH OF DECEMBER 1982 Plant operated at essentially 100 percent rated power the entire nonth of December.
=
6'
.