Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-250 Turkey Point 3 DATE
. ace COMPLETED BY -
TELEPilONE ( 00552-36% ~
December 1982 .
MONTH ,
DAY AVER AGE DAILY POWER LEVEL DAY
- AVERAGE DAILY POWER LEVEL (MWe Net) .(ywe. Net) 1 694 499 37 2 695 gg 703 3 683 707 39 4 686 20 704 5 699 6/6 23 6 698 22 704 7 700 23 703 8 693 24 701 9 698 25 7 01 10 697 26 702 Il 699 27 700 12 699 2g 565 !
13 700 ;9 699 14 704 698 30 15 704 697 3 _
16 701 i
INSTRUCTION S On this forinat. b' the aver. ige daily unit power lesel in MWe-Nei for ca:h day in the reporting inanth. Coinpute to the nearest whide mgawatt.
(9/77I pg3 08 830127 '
R K 05000250 PDR
OPERATING DATA REPORT DOCKET NO. __50-250 DATE JAN li sco3 COMPLETED Igy P. Face TELEPliONE (305) bbz-3654 OPERATING STATUS
- 1. Unit Name: Turkey Point 3 Notes
- 2. Reporting Period December 1982 , Unit 3 operated at 2
essentially full power except
- 3. Licensed Thennal Power (MWt):
60 for the brief outages de-
- 4. Nameplate Rating (Gross MWe): scribed in t'he " Unit Shut-
- 5. Design Electrital Rating (Net MWe): 693 downs and Power Reductions"
' 6. Maximum Dependable Capacity (Gross MWe): 680 Report
- 7. Maximum Dependable Capacity (Net MWe): 646
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To hhich Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr to Date Cumulatise II. Hours In Repmting Period 744 8 760 88 305.6'
- 12. Number Of flours Reactor Was Critical 742.5 5 759.2 61 519.3
- 13. Reactor Resene Shutdown flours 0 0 844.4
- 14. Ilours Generator On-Line . 741.0 __1 614.1 59 505.1
- 15. Unit Reserve Simtdown flours 0 0 121.8
- 16. Gross Thermal Energy Generated (MWH) 1 618 792 12 220 357 121 417 912
- 17. Gross Electrical Energy Generated (MWH) 535 815 , ,,
3 968 365 38 661 990
- 18. Net Electrical Energy Generated (MWH) 511 465 3 765 886 36-587 552
- 19. Unit Service Factor 99.6 64.1 67.4
- 20. Unit Availability I actor 99.6 64.1 67.8
- 21. Unit Capacity Factor (Using MDC Net) 106.4 bb.b 64.1
- 22. Unit Capacity Fastor(Using DER Net) 99.2 62.0 59.8
- 23. Unit Forced Onta: e Rate 0.4 11.4 5.9
- 24. Shutdowns Scheduled Over Ne.st 6 Months (Type. Date.and Duration of Each1:
- 25. If Shnt Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Siitm IPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INI flA L ELECTRICITY CONI \1ERCIA L OPER ATION (il/7 7 I
. _ _ _ _ _ _m. . . _ . . . . ._
I ?
1 0
UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point 3 DATE fald 4~-
COMPLETED BY P. Pac'e' ~"'
REPORT MONTil December 1982 TELErilONE (305) 552-3654 e.
- E E
, ,$? "g
- Eh Licensee ,Eg ),, Cause & Corrective g*3 No. Date g 3g s jg5 Event 37 gU Action to H y3 $ 3@F Report it v1 O o Prevent Recurrence
- e. g V i c 1
- l 1 16 821217 F 0 A 5 HC HTEXCH Power was reduced to repair a i
I main condenser tube leak.
17 821228 F 3.1 H 3 IA INSTRU Reactor was tripped by a spurious
- signal while performing a nuclear j'
instrumentation periodic test. A module was replaced and the unit
) returned to power.
I i,
i j
b i : 3 4 F: Forced Reason: Mt: hod: E. tint it G - imt:netims S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test '
2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File tNUREG-D-Regulatory Restriction 9-Other (Expt::in) 0161)
E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) c _ to a,2 a so w. ,. . <> lhhibit I - Same Source (9/77) 11-01he r (Explaia)
Sbi.<1ARY OF OPERATING EXPERIENCE J
DOCKET NO. 50-250 UNIT _ Turkey Point 3~ _
DATE JAN 171983 COMPLETED BY P. L. Pace TET2 PHONE (305) 552-3654 REPORT MONTH December 1982 Unit 3 operated at essentially full power for the entire month except for a brief outage as a result of a spurious reactor trip. See the " Unit Shutdowns and Power Reduction" Report for details.
Major safety related maintenance activities included:
The 3B charging pump was overhauled. g A charging pump outlet valve was repaired.
A reactor in-csre instrumentation detector drive cable was replaced.
Inspections and requirements of IE Bulletins and NUREG-0737 are continning.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
.+
- AVERAGE DAILY UNIT POWER LEVEL DOCKETNO, 50-251 UNIT Turkey Point 4 DATE COMPLETED BY P. Pace TELEPJIONE (305) 552-3654 '
MONTH December 1982 DAY AVER AGE DAILY POWER LEVEL DAY
- AVERAGE DAILY POWER LEVEL IMWe-Net) -(MWe-Neti 1
17 2 18 3 -
19 -
4 20
~
~
5 21 6 22 7 .
23 8 24 l 9 -
25 -
10 -
26 -
1I -
27 -
12 -
28 -
13 29 -
14 30 Is -
31 -
16 l
l INSTRUCTIO.Ns On this fonnat. hs the average daily unit power lesel in MWe-Net for ca:h day in the reporting anonth. Compute to the nearest wh .!c m gawart.
I 19/77) l
OPERATING DATA REPORT DOCKET NO. 50-251 DATE JAN 171993 COMPLETED BY _ P. Pace TELEPliONE (3Ub) db63654 OPERATIN,G STATUS
- 1. Unit Name: Turkey Point 4 Notes
- 2. Reporting Period: December 1982 e 2200 Steam Generator Repair
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 760 Program in Progress.
- 5. Design Electrical Rating (Net MWe): 693
'6. Maximum Dependable Capacity (Gross MWe): _680
- 7. Maximum Dependable Capacity (Net MWe): 646
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net MWe): .-
- 10. Reasons For Resteirtions,If Any:
';... This Month Yr to Date Cumulative II. Hours in Reporting Period 744 8 760 82 033
- 12. Number Of Hours Reactor Was Critical 0 5 876.2 59 855.3
- 13. Reactor Reserve Shutdown Hours 0 0 166.6
- 14. Hours Generator On-Line 0 5 811.6 57 896
- 15. Unit Reserve Sht,'down Hours 0 0
' 31 .2
- 16. Gross Thermal Energy Generated (MWH) 0 12 701 621 1-21 918.244
- 17. Gross Electrical Energy Generated (MWH) 0 , , , 4 053 505 38 775 572
- 18. Net Electrical Energy Generated (MWH) -1 027 3 844 893 36 733 671
- 19. Unit Service Factor 0 66.3 70.6
- 20. Unit Availability Factor 0 66.3 70.6
- 21. Unit Capacity Factor (Using MDC Net) 0- 67.9 69.3
- 22. Unit Capacity Factor (Using DER Net) 0 63.3 64.6
- 23. Unit Forced Out.1ge Rate 0 11.3 3.9
- 24. Shutdowns Scheibded Over Nc.st 6 Months (Type. Date.and Duration of Each t:
I
- 25. If Shut Down A I nd Of Report Period. Estimated Date of Startup: May 1983
- 26. Units In Test St.itus (Prior o Commercial Operation): Foreca<t Achieved INITIA L CRI flCALITY INI flAL ELECTRICITY COM\lERCIA L OPER A'llON l
V1/m
4 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-251
- UNITNAME Turkey _ Eoia4 "
4 .
DATE _ J AN 1 *
. COMPLETED By _ P. Pace REPORT MONTH fiovember,1982 TELEPilONE _ (305) 552-3FST e.
c-
.! E $ :: .$ Licensee 5% ., Cause & Corrective N' ' . Dite 5 5? 4 .5 i 5 Event titi g? s.? . Action to y~ $ s
.~
e @g .
. Report : in V oiV Prevent Recurrence C
18 821009 S 744 H 4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41. -
- P 1 2 3 4 F: Forced Reason: Method: Exhibit C. !nstructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram. -
Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.
D Regulatory Restriction $0ther (Explain) 0161)
E Operatiyr Training & License Examination p ,
F Admamstrative S
, G Operational Etrur (Explain) .s /.o ao rusvers.c/ Exhibit ! Same Souree (9/77) li Other(Explain) -
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO 50-251 UNIT Turkav Point 4 DATE JAN 171983 COMPLETED BY P..L. Pace TELEPHONE (305) 552-3654 REPORT MONTII December 1982 Unit 4 continued the Steam Generator Repair Program.
Other major safety related nraintenance activities included:
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company. commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
I i
e I
l Q__ _ _ _ . _ - - - - - - - - ,
O
.. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St.Lucie 1 DATE COMPLETED BY P. Pace TELEP.' LONE ( 05M2-36M MONB1 December 1982 _
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGl! DAILY POWER LEVEL
~
IMWe-Net) . (Mwe. Net) 1 830 37 84P 2 8 31 P45 33 3 826 844 39 4 829 839 20 5 832 843 23 6 827 843 22 7 824 841 23 8 831 840 24 9 832 25 839 to 800 26 840
~
11 839 27 792 12 839 28 835 13 842 836 29 14 840 44l 30 15 842 829 3,
16 843 INSTRUCTIONS On this fonnar. !nf the aser. ige daily unit power leselin MWe-Net for ca:h day in the reporting month. Compute to the nearest whole regaware.
(9/771
OPERATING DATA REPORT DOCKET NO. 50-335,m g $83 DATE -
COMPLETED BY P. Pace TELEPHONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name: St. Lucie 1 Notes Unit 1 operated at
- 2. Reporting Period: December 1982 es.se'ntially full power except
- 3. Licensed Thermal Power (MWt): 2700 for a brief o'utage as describ-
- 4. Namepiste Rating (Gross MWe): 890 ed in the "Utiit Shutdowns and
- 5. Design Electrical Rating (Net MWe): 830 Power Reductions"' Report
~ 6. Maximum Dependable Capacity (Gross MWe): 862
- 7. Maximum Dependable Capacity (Net MWe): Ol7 '
- 8. If Changes Occur in Capacity Ratmas (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To whi.h Restricted,If Any (Net MW:):
- 10. Reasons For Restortions. If Any:
[
This Month Yr..to Date Cumulative
- 11. Hours in Reporting Period 44
- 12. Number Of Hours Reactor Was Critical 741.6 8 269.8 43 099.2
- 13. Reacter Reserve Shutdown Hours 0 0 ' 205.3
- 14. Hours Generator On-Line 740.6 8 212.4 42 225.3
- 15. Unit Reserve Shutdown Hours 0 0 39.3
- 16. Gross Thermal Energy Generated (MWH) 1 956 855 21 811 597 105 135 516
- 17. Gross Electrical Energy Generated (MWH) 642 850 , _ . 7 155 480 34 213 595
- 18. Net Electrical Energy Generated (MWH) 610 152 6 784 644 32 264 191
- 19. U'nit Service Factor 99.5 93.7 79.9
- 20. Unit Availability Factor 99.5 93.7 80.0 100.4
- 21. Unit Capacity Factor (Using MDC Net) 95.9 78.0
- 22. Unit Capacity Factor (Using DER Net) 98.8 94.1 75.8
- 23. Unit Forced Outage Rate 0.5 1.0 4.7
- 24. Shutdowns Schednfed Over Next 6 Months (Type. Date,and Duration of Each1:
Refueling, March 1983, 2 months. . I
- 25. If Shut Down At I.nd Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Cononercial Operation): Foreca a Achieved INITIA L CRI TICALITY INITIAL ELECTRICITY CONDIERCIA L OPERATION l.
(9/77I s
s 9
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 335 UNITNAME st. Lucie i , ,
DATE d2 1 * ~
COMPLETED BY P. Pace REPORT MONTli December 1932 TELEPHONE (305) 552-3654
, .5 E 3 .E Licensee h;7 e. Cause & Corrective No. Date g 3g s js5 Event a. 3 Acikn to H jE $ 35ge Report nu u
!' Prevent Recurrence O
10 821230 F 3.4 A 3 335-82-71 IA GENERA Reactor trip caused by spurious inverter trip in conjunction with trip breaker maintenance. The unit was returned to service.
(
l 2 3 4 F: Forced Reason: Method: Exlubit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manord for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for I icensee C Refueling 3 Automatic Scram. Event Report (1.ER) File (NUREG-D Regulatory Restriction Cf-Other (Explain) 0161) l 1j Administrativef Operator Training & License Examination ,
5 G-Operational Error (Explain) s _ Ao ,ta 4 stavc;,. .cl Exhibit 1 Same Source (9/77) Il-Other (Explain)
' ~
SUMMARY
OF OPERATING EXPERIENCE l
DOCKET NO 50-335 I UNIT St. Lucie 1 -
JAN li ras _. 1 DATE COMPLETED BY P. l. Pace TEI,EPHONE (305) 552-3654 REPORT MONTH December 1982 Unit 1 operated at essentially full power for the entire month except for a brief outage. See the " Unit Shutdowns and Power Reductions" Report for detail s .
flajor safety related maintenance activities included:
Boric acid heat tracing circuits were repaired.
Containment spray and safety injection valves were repaired.
An AR1 control; valve operator was repaired.
A 6.9 kv breaker was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
~
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. ,
._ 0
'* P.O. BoM 529100 *.*1 AMI, F L 33152
- L ' 7.,
FLORIDA POWER & LtGHT COP.tPANY JAN 171S83 '""*"7-40' I933 PNS-LI-83-027 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the December 1982, Operating Status Reports and Operating Summary Reports for Turkey Point Units Nos. 3 and 4 and St. Lucie Unit flo . 1 Very truly yours, REVIEWED BY:
b nLO 9/estv, ; at t>
J. W. Williams, Jr.
8ed /-/J-13 y
t c ea Eeg $kunA . l~O 1
/
JWW/PLP/jb Attachments cc: Mr. James P. O'Reilly Mr. Robert Lowenstein, Esquire i
NUCLEAR EMERGY
\ A M 141=
PEOPLE. . SERVING PEOPLE