Monthly Operating Repts for Dec 1982
ML20072C358
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 01/17/1983
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20072C344 List:
References
NUDOCS 8303080408
Download: ML20072C358 (13)


Text

.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-250 Turkey Point 3 DATE

. ace COMPLETED BY -

TELEPilONE ( 00552-36% ~

December 1982 .

MONTH ,

DAY AVER AGE DAILY POWER LEVEL DAY

- AVERAGE DAILY POWER LEVEL (MWe Net) .(ywe. Net) 1 694 499 37 2 695 gg 703 3 683 707 39 4 686 20 704 5 699 6/6 23 6 698 22 704 7 700 23 703 8 693 24 701 9 698 25 7 01 10 697 26 702 Il 699 27 700 12 699 2g 565  !

13 700 ;9 699 14 704 698 30 15 704 697 3 _

16 701 i

INSTRUCTION S On this forinat. b' the aver. ige daily unit power lesel in MWe-Nei for ca:h day in the reporting inanth. Coinpute to the nearest whide mgawatt.

(9/77I pg3 08 830127 '

R K 05000250 PDR

OPERATING DATA REPORT DOCKET NO. __50-250 DATE JAN li sco3 COMPLETED Igy P. Face TELEPliONE (305) bbz-3654 OPERATING STATUS

1. Unit Name: Turkey Point 3 Notes
2. Reporting Period December 1982 , Unit 3 operated at 2

essentially full power except

3. Licensed Thennal Power (MWt):

60 for the brief outages de-

4. Nameplate Rating (Gross MWe): scribed in t'he " Unit Shut-
5. Design Electrital Rating (Net MWe): 693 downs and Power Reductions"

' 6. Maximum Dependable Capacity (Gross MWe): 680 Report

7. Maximum Dependable Capacity (Net MWe): 646
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To hhich Restricted.If Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr to Date Cumulatise II. Hours In Repmting Period 744 8 760 88 305.6'

12. Number Of flours Reactor Was Critical 742.5 5 759.2 61 519.3
13. Reactor Resene Shutdown flours 0 0 844.4
14. Ilours Generator On-Line . 741.0 __1 614.1 59 505.1
15. Unit Reserve Simtdown flours 0 0 121.8
16. Gross Thermal Energy Generated (MWH) 1 618 792 12 220 357 121 417 912
17. Gross Electrical Energy Generated (MWH) 535 815 , ,,

3 968 365 38 661 990

18. Net Electrical Energy Generated (MWH) 511 465 3 765 886 36-587 552
19. Unit Service Factor 99.6 64.1 67.4
20. Unit Availability I actor 99.6 64.1 67.8
21. Unit Capacity Factor (Using MDC Net) 106.4 bb.b 64.1
22. Unit Capacity Fastor(Using DER Net) 99.2 62.0 59.8
23. Unit Forced Onta: e Rate 0.4 11.4 5.9
24. Shutdowns Scheduled Over Ne.st 6 Months (Type. Date.and Duration of Each1:
25. If Shnt Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Siitm IPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INI flA L ELECTRICITY CONI \1ERCIA L OPER ATION (il/7 7 I

. _ _ _ _ _ _m. . . _ . . . . ._

I  ?

1 0

UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point 3 DATE fald 4~-

COMPLETED BY P. Pac'e' ~"'

REPORT MONTil December 1982 TELErilONE (305) 552-3654 e.

- E E

, ,$? "g

  • Eh Licensee ,Eg ),, Cause & Corrective g*3 No. Date g 3g s jg5 Event 37 gU Action to H y3 $ 3@F Report it v1 O o Prevent Recurrence
e. g V i c 1
l 1 16 821217 F 0 A 5 HC HTEXCH Power was reduced to repair a i

I main condenser tube leak.

17 821228 F 3.1 H 3 IA INSTRU Reactor was tripped by a spurious

signal while performing a nuclear j'

instrumentation periodic test. A module was replaced and the unit

) returned to power.

I i,

i j

b i  : 3 4 F: Forced Reason: Mt: hod: E. tint it G - imt:netims S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test '

2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File tNUREG-D-Regulatory Restriction 9-Other (Expt::in) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) c _ to a,2 a so w. ,. . <> lhhibit I - Same Source (9/77) 11-01he r (Explaia)

Sbi.<1ARY OF OPERATING EXPERIENCE J

DOCKET NO. 50-250 UNIT _ Turkey Point 3~ _

DATE JAN 171983 COMPLETED BY P. L. Pace TET2 PHONE (305) 552-3654 REPORT MONTH December 1982 Unit 3 operated at essentially full power for the entire month except for a brief outage as a result of a spurious reactor trip. See the " Unit Shutdowns and Power Reduction" Report for details.

Major safety related maintenance activities included:

The 3B charging pump was overhauled. g A charging pump outlet valve was repaired.

A reactor in-csre instrumentation detector drive cable was replaced.

Inspections and requirements of IE Bulletins and NUREG-0737 are continning.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

.+

  • AVERAGE DAILY UNIT POWER LEVEL DOCKETNO, 50-251 UNIT Turkey Point 4 DATE COMPLETED BY P. Pace TELEPJIONE (305) 552-3654 '

MONTH December 1982 DAY AVER AGE DAILY POWER LEVEL DAY

  • AVERAGE DAILY POWER LEVEL IMWe-Net) -(MWe-Neti 1

17 2 18 3 -

19 -

4 20

~

~

5 21 6 22 7 .

23 8 24 l 9 -

25 -

10 -

26 -

1I -

27 -

12 -

28 -

13 29 -

14 30 Is -

31 -

16 l

l INSTRUCTIO.Ns On this fonnat. hs the average daily unit power lesel in MWe-Net for ca:h day in the reporting anonth. Compute to the nearest wh .!c m gawart.

I 19/77) l

OPERATING DATA REPORT DOCKET NO. 50-251 DATE JAN 171993 COMPLETED BY _ P. Pace TELEPliONE (3Ub) db63654 OPERATIN,G STATUS

1. Unit Name: Turkey Point 4 Notes
2. Reporting Period: December 1982 e 2200 Steam Generator Repair
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 760 Program in Progress.
5. Design Electrical Rating (Net MWe): 693

'6. Maximum Dependable Capacity (Gross MWe): _680

7. Maximum Dependable Capacity (Net MWe): 646
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net MWe): .-
10. Reasons For Resteirtions,If Any:

';... This Month Yr to Date Cumulative II. Hours in Reporting Period 744 8 760 82 033

12. Number Of Hours Reactor Was Critical 0 5 876.2 59 855.3
13. Reactor Reserve Shutdown Hours 0 0 166.6
14. Hours Generator On-Line 0 5 811.6 57 896
15. Unit Reserve Sht,'down Hours 0 0

' 31 .2

16. Gross Thermal Energy Generated (MWH) 0 12 701 621 1-21 918.244
17. Gross Electrical Energy Generated (MWH) 0 , , , 4 053 505 38 775 572
18. Net Electrical Energy Generated (MWH) -1 027 3 844 893 36 733 671
19. Unit Service Factor 0 66.3 70.6
20. Unit Availability Factor 0 66.3 70.6
21. Unit Capacity Factor (Using MDC Net) 0- 67.9 69.3
22. Unit Capacity Factor (Using DER Net) 0 63.3 64.6
23. Unit Forced Out.1ge Rate 0 11.3 3.9
24. Shutdowns Scheibded Over Nc.st 6 Months (Type. Date.and Duration of Each t:

I

25. If Shut Down A I nd Of Report Period. Estimated Date of Startup: May 1983
26. Units In Test St.itus (Prior o Commercial Operation): Foreca<t Achieved INITIA L CRI flCALITY INI flAL ELECTRICITY COM\lERCIA L OPER A'llON l

V1/m

4 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-251

  • UNITNAME Turkey _ Eoia4 "

4 .

DATE _ J AN 1 *

. COMPLETED By _ P. Pace REPORT MONTH fiovember,1982 TELEPilONE _ (305) 552-3FST e.

c-

.! E $  :: .$ Licensee 5% ., Cause & Corrective N' ' . Dite 5 5? 4 .5 i 5 Event titi g? s.? . Action to y~ $ s

.~

e @g .

. Report : in V oiV Prevent Recurrence C

18 821009 S 744 H 4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41. -

P 1 2 3 4 F: Forced Reason: Method: Exhibit C. !nstructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram. -

Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction $0ther (Explain) 0161)

E Operatiyr Training & License Examination p ,

F Admamstrative S

, G Operational Etrur (Explain) .s /.o ao rusvers.c/ Exhibit ! Same Souree (9/77) li Other(Explain) -

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO 50-251 UNIT Turkav Point 4 DATE JAN 171983 COMPLETED BY P..L. Pace TELEPHONE (305) 552-3654 REPORT MONTII December 1982 Unit 4 continued the Steam Generator Repair Program.

Other major safety related nraintenance activities included:

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company. commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

I i

e I

l Q__ _ _ _ . _ - - - - - - - - ,

O

.. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St.Lucie 1 DATE COMPLETED BY P. Pace TELEP.' LONE ( 05M2-36M MONB1 December 1982 _

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGl! DAILY POWER LEVEL

~

IMWe-Net) . (Mwe. Net) 1 830 37 84P 2 8 31 P45 33 3 826 844 39 4 829 839 20 5 832 843 23 6 827 843 22 7 824 841 23 8 831 840 24 9 832 25 839 to 800 26 840

~

11 839 27 792 12 839 28 835 13 842 836 29 14 840 44l 30 15 842 829 3,

16 843 INSTRUCTIONS On this fonnar. !nf the aser. ige daily unit power leselin MWe-Net for ca:h day in the reporting month. Compute to the nearest whole regaware.

(9/771

OPERATING DATA REPORT DOCKET NO. 50-335,m g $83 DATE -

COMPLETED BY P. Pace TELEPHONE (305) 552-3654 OPERATING STATUS

1. Unit Name: St. Lucie 1 Notes Unit 1 operated at
2. Reporting Period: December 1982 es.se'ntially full power except
3. Licensed Thermal Power (MWt): 2700 for a brief o'utage as describ-
4. Namepiste Rating (Gross MWe): 890 ed in the "Utiit Shutdowns and
5. Design Electrical Rating (Net MWe): 830 Power Reductions"' Report

~ 6. Maximum Dependable Capacity (Gross MWe): 862

7. Maximum Dependable Capacity (Net MWe): Ol7 '
8. If Changes Occur in Capacity Ratmas (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To whi.h Restricted,If Any (Net MW:):
10. Reasons For Restortions. If Any:

[

This Month Yr..to Date Cumulative

11. Hours in Reporting Period 44
12. Number Of Hours Reactor Was Critical 741.6 8 269.8 43 099.2
13. Reacter Reserve Shutdown Hours 0 0 ' 205.3
14. Hours Generator On-Line 740.6 8 212.4 42 225.3
15. Unit Reserve Shutdown Hours 0 0 39.3
16. Gross Thermal Energy Generated (MWH) 1 956 855 21 811 597 105 135 516
17. Gross Electrical Energy Generated (MWH) 642 850 , _ . 7 155 480 34 213 595
18. Net Electrical Energy Generated (MWH) 610 152 6 784 644 32 264 191
19. U'nit Service Factor 99.5 93.7 79.9
20. Unit Availability Factor 99.5 93.7 80.0 100.4
21. Unit Capacity Factor (Using MDC Net) 95.9 78.0
22. Unit Capacity Factor (Using DER Net) 98.8 94.1 75.8
23. Unit Forced Outage Rate 0.5 1.0 4.7
24. Shutdowns Schednfed Over Next 6 Months (Type. Date,and Duration of Each1:

Refueling, March 1983, 2 months. . I

25. If Shut Down At I.nd Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Cononercial Operation): Foreca a Achieved INITIA L CRI TICALITY INITIAL ELECTRICITY CONDIERCIA L OPERATION l.

(9/77I s

s 9

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 335 UNITNAME st. Lucie i , ,

DATE d2 1 * ~

COMPLETED BY P. Pace REPORT MONTli December 1932 TELEPHONE (305) 552-3654

, .5 E 3 .E Licensee h;7 e. Cause & Corrective No. Date g 3g s js5 Event a. 3 Acikn to H jE $ 35ge Report nu u

!' Prevent Recurrence O

10 821230 F 3.4 A 3 335-82-71 IA GENERA Reactor trip caused by spurious inverter trip in conjunction with trip breaker maintenance. The unit was returned to service.

(

l 2 3 4 F: Forced Reason: Method: Exlubit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manord for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for I icensee C Refueling 3 Automatic Scram. Event Report (1.ER) File (NUREG-D Regulatory Restriction Cf-Other (Explain) 0161) l 1j Administrativef Operator Training & License Examination ,

5 G-Operational Error (Explain) s _ Ao ,ta 4 stavc;,. .cl Exhibit 1 Same Source (9/77) Il-Other (Explain)

' ~

SUMMARY

OF OPERATING EXPERIENCE l

DOCKET NO 50-335 I UNIT St. Lucie 1 -

JAN li ras _. 1 DATE COMPLETED BY P. l. Pace TEI,EPHONE (305) 552-3654 REPORT MONTH December 1982 Unit 1 operated at essentially full power for the entire month except for a brief outage. See the " Unit Shutdowns and Power Reductions" Report for detail s .

flajor safety related maintenance activities included:

Boric acid heat tracing circuits were repaired.

Containment spray and safety injection valves were repaired.

An AR1 control; valve operator was repaired.

A 6.9 kv breaker was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

~

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. ,

._ 0

'* P.O. BoM 529100 *.*1 AMI, F L 33152

L ' 7.,

FLORIDA POWER & LtGHT COP.tPANY JAN 171S83 '""*"7-40' I933 PNS-LI-83-027 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the December 1982, Operating Status Reports and Operating Summary Reports for Turkey Point Units Nos. 3 and 4 and St. Lucie Unit flo . 1 Very truly yours, REVIEWED BY:

b nLO 9/estv, ; at t>

J. W. Williams, Jr.

8ed /-/J-13 y

t c ea Eeg $kunA . l~O 1

/

JWW/PLP/jb Attachments cc: Mr. James P. O'Reilly Mr. Robert Lowenstein, Esquire i