ML20072B107

From kanterella
Jump to navigation Jump to search
Updated RO-370/83-07 Re Discrepancies in Initial Integrated Leak Rate Test.Soap Bubble Test of Hot Penetrations Will Be Incorporated in Periodic Test Procedure
ML20072B107
Person / Time
Site: Mcguire
Issue date: 06/03/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-370-83-07, RO-370-83-7, NUDOCS 8306130312
Download: ML20072B107 (1)


Text

DUKE PowEn Godmov I'.O. ISOX 331 TID CIIAHLOTTI!, N.O. 20242

"^1.".;.nT.5,=

4W=b June 3, 1983

.-4C Mr. James P. O'Reilly, Regional Administrator c

U. S. Nuclear Regulatory Commission Sj zT Region II f,0 101 Marietta Street NW, Suite 2900 T

Atlanta, Georgia 30303 c'$

.g bU Re: McGuire Nuclear Station Unit 2

,.3 2 Docket No. 50-370 N

Ou cp P

Dear Mr. O'Reilly:

My letter of May 17, 1983 submitted Reportable Occurrence Report R0-370/83-07 which dealt with discrepancies in the Unit 2 Initial Integrated Leak Rate Test.

In addition to the corrective actions outlined in the report, upon writing the periodic test procedure for the Unit 2 ILRT, the soap bubble test of the hot penetrations will be incorporated.

Very truly yours, fB. /M /gg Hal B. Tucker PBN:jfw cc: Document Control Desk Records Center U. S. Nuclear Regulatory Commission Institute of Nuclear Power Operations Washington, D. C.

20555 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station 8306130312 830603 PDRADOCK05000g y... wag g i