ML20072B098

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1983
ML20072B098
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/08/1983
From: Kennedy D, Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8306130310
Download: ML20072B098 (5)


Text

OPERATING DATA REPORT DOCKET NO 50-255 DATE 6-6-63 COMPLETED BY DAPeterson TELEPHONE (616) 764-6913 OPERATING STATUS Notes l

1.

Unit Name:

Palisades 2.

Reporting Period:

830501-830531 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811 7 5.

Design Electrical Rating (Net MWe):

805 6.

Maximum Dependable Capacity (Gross MWe):

  • 675 7.

Maximum Dependable Capacity (Net MWe):

  • 635 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, It Any (Net MWe):

10.

Feasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative 11.

Ilours In Reporting Period Thh 3623 100,358 12.

Number of Ilours Reactor Was Critical 725.2 3585.3 57,506.3 13.

Reactor Reserve Shutdown Hours 14.

Ifours Generator On-Line 685 3 3533.2 54,526.1 15.

Unit Reserve Shutdown Ifours 16.

Gross Thermal Energy Generated (MWil) 1.688,184 8,682,216 111,319,008 17.

Gross Electrical Energy Generated (MWil) 529,250 2,742,670 34,512,590 18.

Net Electrical Energy Generated (MWII) 501.375 2,602,103_

32,460,159 19.

Unit Service Factor 92.1 97 5 54.3 20.

Unit Availability Factor 92.1 97 5 54.3 21.

Unit Capacity Factor (Using MDC Net) 106.1 113.1 50.9 22.

Unit Capacity Factor (Using DER Net) 83.7 89 2 40.2 23.

Unit Forced Outage Rate 7.9 25 33.1 24.

Shutdowns Schedulea Over Next Six Months (Type, Date and Duration of Each):

Refueling, 8/13/83, 103 days.

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

_ Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8306130310 830600 PDR ADOCK 05000255 R

PDR

  • Based on condenser backpressure.

h I

rp0882-0032a-93 I

o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades _

DATE 6-6-83 CO5fPLETED BY DA Nterson _

TELEPHONE (616) 76h-8913 510NTil May 1983 DAY AVERAGE D ILY PNER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net) 75b 749 3

n 747 2

753 3

75h 331 g9 753 4

Tho 5

'l 738 432 6

Th3 735 7

,3 750 740 3

Th2 9

25 10 749 26 1i 750 755 27 74h

. 743 I,

,3

~

716 742 13 39 14 746 746 30 751 Th5 33 3:

748 16 INSTRUCTIONS On this format, list the aserage daily unit power laelin 51we. Net (t,r eseh day in the repornn; nwnsh. Compute to th: nearest whole megawatt,

(9/77)

..J

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50_255 UNIT NAME Palisades DATE 6/7/R3 REPORT MONTH May 1983 COMPLETED BY DVanNnnere TELEPHONE f 616W6!4_Bm a 3

=

e 3 eu e g%

Cause & Corrective j _g y

7yy Licensee g%

g DJte 2E 4

.E g x Event s3 E3 Action to 5E j di g Report a n0

}U Present Recurrente 6

16 830519 F

58.7 A

3 Feed Pump Trip 4

l l4 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entr> Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report (LER) File INURI G.

D-Regulatory Rest:iction

44) her (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

(9/77)

II-Other (E xplain)

  • Exlubit 1 - Same Source t

0

CU!a4ARY OF OPERATING EXPERIENCE FOR THE MONTH OF MAY, 1983 Plant operated at essentially 100% rated power until on May 19 a main feed pump tripped, reaulting in a Plant trip. The unit was placed back on line on May 21 and power production continued through the end of the month.

.~

e e

O Consumers Power Company Palisades Nuclear Plant: Route 2, Box 154, Covert, Mt 49043 June 8,'1983 U3 Nuclear Regulatory Cc=tission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of May, 1983 b a w c / / 7/

-em a bj David M Kennedy Reactor Engineer CC: DVanDenBerg. Palisades JGKeppler, USNRC JRSchepers, P24-31h DJVandeWalle, P24-61hB RMKrich, Palisades Resident Inspector, Palisades JJDellas, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA Document Control 950*22*35*10/L PSepcenko, CE DV:83*042 I

J P

\\

\\

,