ML20072B054

From kanterella
Jump to navigation Jump to search
Informs That Commitment Date for Dynamic Rod Drop Test Will Be Rerun During Next Available Outage in Early 1983 Instead of Fall 1982 Per IE Insp Rept 50-369/82-09.Delay Due to Inadvertent Unit Trip
ML20072B054
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 11/11/1982
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8301250188
Download: ML20072B054 (1)


Text

9 WC FDONE' POWER GOMPANY

  • I'III ~
  • P.O. HOX 33180 CHARLOTTE. N.C. 28242 II Ai,15. TUCKER TELEPHONE vus emensorwv (704) 373-4531

..u u. . .m.<-

o tif)\f l$ P 3 . l h.

November 11, 1982 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclesr Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station Docket No. 50-369

Reference:

RII:PTB 50-369/82-09 1

Dear Mr. O'Reilly:

In Mr. W. O. Parker, Jr.'s May 6, 1982 letter transmitting Duke Power Company's i response to the violation identified in the subject inspection report, it was indicated that the dynamic rod drop test would be rerun at the next available outage, which was then scheduled for Fall, 1982. Further verbal communication with the NRC had specified a commitment date of November 19, 1982. However, a l recent inadvertent unit trip and decision to evolve into a nineteen day outage l

will require the commitment date be changed. The dynamic rod drop test will

, now be rerun during the next available outage, currently scheduled for early l

1983.

Very truly yours, fS bk %)lg i Hal B. Tucker l

PBN:jfw l cc: Senior Resident Inspector l McGuire Nuclear Station