Forwards Application for Ol,Consisting of Suppl 9 to PSAR Chapter 17 Re Qa.Basic QA Program Not Changed Significantly. Proposed Mods to Field Change Request Program Transmitted on 830504
ML20072A825
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/10/1983
From: Foster D
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072A828 List:
References
NUDOCS 8306100264
Download: ML20072A825 (2)


Text

Georgo Pow;r Company Post Offico Box 4545 Atlanta. Georgia 30302 Telephons 404 526-6526 southern Company servlCes. Inc.

eosiottice so 262s Georgia Power i, ,; Birmingham. Alabama 35202

\ / Telephone 205 870-6011 Southern CompanyServices D. O. Fostar Vice President and General Manager

[m) Vogtle Project U June 10, 1983 United States Nuclear Regulatory Commission p)

V Office of Inspection and Enforcement Region II - Su.ite 3100 101 Marietta Street Atlanta, Georgia 30303 Attention: Mr.. James P. 0'Reilly NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 l ALVIN W. V0GTLE NUCLEAR PLANT - UNITS 1 AND 2 l PSAR CHAPTER 17 UPDATE

Dear Mr. O' Reilly:

(O j In accordance with 10 CFR Part 50.30 and Part 50.54, we are submitting 3 signed originals of Supplement 9 to the Alvin W. Vogtle Nuclear Plant PSAR j Chapter 17. In addition, we are submitting 60 copies to the Document Control Desk in Washington, D.C.

1 l As can be seen from the Supplement, the ba, sic Quality Assurance program has not been changed significantly. There have been a number of organiza-tional changes which we think enhances the overall program to give a quality product during .the construction of the Vogtle units. An example of these changes was the creation of the position of General Manager, Quality Assurance and Radiological Health and Safety. This organizational change was described in a letter to Mr. Eisenhut on October 25, 1982.

Other type changes relate to modifications such as our proposal modifying the Field Change Request program to allow work to continue on minor problems prior to full engineering approval by the utilization of an additional system - the

" Authorization to Continue Work" ( ATCW). Georgia Power Company believes that this proposed modification to the Field Change Control program is an improve-( ment to the present system for handling minor changes. This proposed change C]/ was transmitted to you on May 4, 1983.

DESIGHTED ORIGIgarj ,. c N O ..

4 rtified_sy M { g e d g 3tgT W 8306100264 830610 PDR ADOCK 05000424 A PDR

GeorgiaPower

'R H Southern CompanyServices Mr;,

o James19 3 Page 2 The above and other similar changes to the description of the Quality Assurance program since the issuance of Supplement 2 on March 2,1977 are identified as O S9 in the text. To avoid confusion, this updated information should be

- inserted in totality in the PSAR Chapter 17 in the place of the Supplement 2 information previously submitted.

Shoulif you need additional information or clarification, we will be available to discuss this with you at your convenience, d Sinc ely , j[ '

f L

D. O. Foster Vice President and General Manager Vogtle Project ,

DOF:sb xc: Document Control Desk (60)

W. S. Sanders l M. A. Miller D. E. Dutton f

R. A. Thomas J. A. Bailey L. T. Gucwa

0. Batum C. W. Hayes O

O ,

O

_-----,,w---,, ,_yy--,_-, , . . . . , , , , , , , , , , , _ . , , , _ , _ , - , - - - - - , , , _ , , _ _ . , , . _ , , . , , , , . _ , . , , , , _ , , , , _ ,_,y, , _ _ _ , _ _ _ _ , _ , . , , , _ , _ , _ _ _ _ _ _ _ _ , . . _ _ . _ _ , ~ ,