ML20072A414
| ML20072A414 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/31/1983 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, RDC-53(82), NUDOCS 8306100119 | |
| Download: ML20072A414 (1) | |
Text
v i s --
n ; r if r :
.1 n
r,
,- c.
~ rp
- e 4
-2 IU$
U L b
't' I, !.. f ! t '. b E k. 1 [F !
I i~
' > ' is t
1-P.O. box $000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN vicE PRESIDENT May 31, 1983 NUCUAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 KE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Rejection of Previously Accepted Containment Vessel Radiographs
[RDC 53(82)]
Dear Mr. Keppler:
This letter serves as our fif th interim report pursuant to 10CFR50.55(e) concerning the rejection during re-review of a number of previously accepted radiographs on Containment Vessel shell plate welds. Our previous reports on this subject were submitted May 3, 1982, August 31, 1982, September 30, 1982, and March 31, 1983.
Currently we are performing a review of the radiographs utilizing film overlay techniques. These techniques will permit us to isolate subsurface indications and permit evaluation of surface irregularities for acceptance. Repair work has started on rejectable weld areas and radiographs of all repairs will be reviewed as they become available.
At this time we plan to submit our next report on September 30, 1983.
Please call if there are any questions.
Sideerely, 8306100119 830531 1
PDR ADOCK 05000440 Murray R.
elman S
PDR Vice President Nuclear Group MRE:pab l
cc:
Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN
('] '
f{O Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 I
Atlanta, Georgia 30339
'JUN 3 ;cq3