MONTHYEARML20217E1551999-09-28028 September 1999 Comment Supporting Pr 10CFR50 Re Elimination of Requirement for Licensees to Revise ISI & IST Programs Beyond Baseline Edition & Addenda of ASME B&PV Code ML17313B0651999-07-30030 July 1999 Comment on Draft Rg DG-1076, Service Level I,Ii & III Protective Coatings Applied to Npps. ML17313B0161999-07-0101 July 1999 Comment on Draft Rg DG-1074, SG Tube Integrity. ML20196K5631999-06-29029 June 1999 Comment Supporting Proposed Rule 10CFR50.55a Re Elimination of 120-month Requirement to Update ASME Code ISI & Inservice Testing Program ML20207D1591999-05-20020 May 1999 Comment on Proposed Rules 10CFR21,50 & 54 Re Use of Alternative Source Terms at Operating Reactors ML17313A9791999-05-20020 May 1999 Comment Opposing Draft Reg Guide DG-1084, Qualification & Training of Personnel for Nuclear Power Plants. as General Comment,Util Believes That Many of Proposed Changes Will Limit Ability to cross-train Mgt Level Personnel ML20205A4271999-03-18018 March 1999 Comment on Petition for Rulemaking PRM-50-64 Which Requested Greater Clarification by NRC Re Possible Financial Obligations of NPP Licensees as Reflected in NRC Final Policy Statement on Restructuring & Economic Deregulation ML17313A8521999-03-0505 March 1999 Comment Supporting Proposed Change to NRC Enforcement Policy.Suggested Rewording of Sections Provided ML17313A8191999-02-24024 February 1999 Comment Supporting Secy 99-007, Recommendation for Reactor Oversight Process Improvements, & Comments Provided by NEI & Regional Utility Group Iv.Offers Comments on NRC Approach to Using Performance Indicators in Assessment Process ML20198J4031998-12-11011 December 1998 Comment Opposing Proposed Rule 10CFR50 Re Requirement for Monitoring Effectiveness of Maint at NPPs ML20217B9761998-04-0909 April 1998 Comment Re Draft RG DG-1029, Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safey-Related Instrumentation & Control Sys ML20216A9091998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50.55a Re Industry Codes & Stds ML17313A3361998-03-27027 March 1998 Comment Opposing Proposed GL Re Lab Testing on Nuclear-Grade Activated Charcoal. Believes That Proposed 60 Day Implementation Schedule Would Severely Challenge Resources of Limited Number of Qualified Vendors ML20217E8781998-03-27027 March 1998 Comment Supporting Proposed GL, Lab Testing of Nuclear- Grade Activated Charcoal ML17313A2511998-03-0303 March 1998 Comment on Proposed GL 98-XX Re Yr 2000 Readiness of Computer Sys at Npps. ML20203L5521998-02-25025 February 1998 Forwards Comments on Draft Reg Guide DG-5008, Reporting of Safeguards Events ML20202E4251998-01-30030 January 1998 Comment on Draft RG DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Npps. Draft RG Should Be Revised to Clarify That Alloy Analyzer Can Be Used Consistent W/Guidance in EPRI NP-5652 ML20199E0871998-01-17017 January 1998 Comment Opposing PRM 50-63A by Pg Crane Re Amending Emergency Planning Regulations to Require Consideration of Prophylactic Use of Potassium Iodide for General Public ML20202G4461997-12-0101 December 1997 Comment on Proposed Final Rule 10CFR50.Licensee Requests That Effective Date Be Delayed from 980101 to 0601,in Order to Provide Enough Time to Request & Obtain NRC Review of Exemption from Rule ML20212D1391997-10-17017 October 1997 Comment on Pr 10CFR55 Re NUREG-1021,Interim Rev 8, Operator Licensing Exam Stds for Power Reactors ML17312B4241997-04-23023 April 1997 Comment Supporting Draft Rg DG-1068 (Proposed Rev 3 to Rg 1.134, Medical Evaluation of Licensing Personnel at Npps) ML20134J9671997-02-0606 February 1997 Comment Supporting Proposed Rule 10CFR50, Draft Policy Statement on Restructuring & Economic Deregulation of Electric Util Industry ML20134N2521996-11-14014 November 1996 Comment on Draft RG DG-1012,proposed Rev 3 to RG 1.8, Qualification & Training of Personnel for Npp ML20117E3871996-08-0707 August 1996 Comment Supporting Proposed Rule 10CFR26 Re Mod to fitness-for-duty Program Requirements ML20113C6981996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors. Cautions NRC Not to Adopt Rules That Are Too Restrictive & Could Lead to Premature Decommissioning ML20117P1261996-06-24024 June 1996 Comment on Proposed Rule 10CFR50, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors. Urges NRC to Approach Rulemaking Re Decommissioning Costs in Manner That Will Facilitate Federal Legislative Solution ML20095A8461995-11-28028 November 1995 Comment on Petition for Rulemaking PRM-50-62 Re Proposed Changes to 10CFR50.54.Util Endorses Industry Petition & Response Provided by NEI ML17311B2931995-11-27027 November 1995 Comment Opposing Draft NUREG/CR-6354, Performance Testing of Electronic Personnel Dosimeters. ML17311B1601995-08-31031 August 1995 Comment Opposing Review of Revised NRC SALP ML20087H7241995-08-16016 August 1995 Comment Opposing Proposed Rule 10CFR2 Re Comment on Revision of NRC Enforcement Policy ML20087H7501995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Std Design Certification for ABWR Design & Std Design Certification for Sys 80+ Design ML20087H7331995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for ABWR Design & Standard Design Certification for Sys 80+ Design.Concurs w/ABB-CE Comments & NEI Recommendations ML17311B0071995-06-27027 June 1995 Comment on Proposed Review of NRC Insp Rept Content,Format & Style. Insp Detail Should Be Brief & Ref Previous Rept by Section or at Min IR Number ML20083N5031995-05-0505 May 1995 Comment on Proposed Rev to 10CFR50,app J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors. Proposed Rev Will Result in Highly Efficient Regulation ML20082P7461995-04-19019 April 1995 Comment Supporting Proposed Rules 10CFR170 & 171 Re Proposed Revs of NRC Fee Schedule for FY95 in Fr ML20082H0971995-04-10010 April 1995 Draft Policy Statement Re Freedom of Employees in Nuclear Industry to Raise Safety Concerns W/O Fear of Retaliation ML20081B5721995-03-0808 March 1995 Motion of Plains Electric Generation & Transmission Cooperative,Inc to Withdraw,W/Prejudice,Petition for Leave to Intervene,Request for Finding of Significant Change & for Antitrust Hearing & Comments.* W/Certificate of Svc ML17311A6691995-02-0202 February 1995 Comment Supporting Draft Rg DG-8014 (Proposed Rev 3 to Rg 8.13, Instruction Concerning Prenatal Radiation Exposure) ML20078H0671995-01-20020 January 1995 Comment Supporting NUMARC Position on Proposed Rules 10CFR20,30,40,50,51,70 & 72 Re Radiological Criteria for Decommissioning of Lands & Structures ML20077M5471995-01-0404 January 1995 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Nuclear Power Reactor Proposed Rule ML17311A2461994-08-25025 August 1994 Comment on Draft Reg Guide (DG-1031), Monitoring Effectiveness of Maint at Npps. Term Maint Preventable Failure Needs to Be Defined & Compared to Term Maint Preventable Functional Failure. ML17310B1911994-04-12012 April 1994 Petition to Intervene of Public Utility Commission of Texas. W/Certificate of Svc ML17310B2041994-04-12012 April 1994 Petition to Intervene of Public Utility Commission of Tx ML20062M4141993-12-27027 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Procurement of Commercial Grade Items ML20056G3351993-08-27027 August 1993 Comment Opposing Proposed Rule 10CFR2 Re Review of 10CFR2.206 Process ML17306B2461993-01-15015 January 1993 Comment Supporting in Part,Draft Reg Guide DG-1020, Monitoring Effectiveness of Maint at Npps. ML17306A9571992-09-0808 September 1992 Comments on Proposed Rev to Staff Technical Position on Radwaste Classification.Supports Rev ML20099E0621992-07-29029 July 1992 Comment Opposing Proposed Rule 10CFR50.63, Loss of All AC Power ML20090F9661992-03-0909 March 1992 Comment Supporting Proposed Rule 10CFR50 & 52 Re Training & Qualification of Nuclear Power Plant Personnel ML17306A4501992-02-0404 February 1992 Comment on Draft Reg Guide Task DG-8007 (Proposed Rev 1 to Reg Guide 8.7) Re Instructions for Recording & Reporting Occupational Radiation Exposure Data 1999-09-28
[Table view] Category:STIPULATIONS/AGREEMENTS
MONTHYEARML20072A3441983-06-0909 June 1983 Stipulation Agreeing to Comply W/Provisions of Proposed Order,Unless & Until Further Mod Requested by Parties.Aslb Should Enter Encl Order Re Discovery Schedule Mod ML20004F6261981-06-0808 June 1981 Stipulation Between Joint Applicants & Intervenor,So That Neither Party Files Objections to or Motions to Compel Re Parties' First Set of Interrogatories.Related Correspondence 1983-06-09
[Table view] |
Text
, . .
CCCKETED LG3C UNITED STATES OF AMERICA
~ " " '
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
ARIZONA PUBLIC SERVICE COMPANY, ) Docket Nos. STN 50-529 et al. -
) STN 50-530
)
(Palo Verde Nuclear Generatingi )
- Station, Units 2 and 3) )
)
STIPULATlgN
~
IT IS HEREBY STIPULATED by and between counsel for WEST VALLEY AGRICULTURAL PROTECTION COUNCIL, INC. (hereinafter " West Valley") and counsel for ARIZONA PUBLIC SERVICE COMPANY, et al.
(hereinafter " Joint Applicants") that the attached Order respecting modification of the discovery schedule may be entered if the Board finds the proposed Order to be acceptable.
IT IS FURTHER STIPULATED that the parties to this pro-ceeding shall retain the right to seek modification of the attached Order at some subsequent date should counsel for one of the parties determine that provisions of the Discovery Order, as modified, have become unacceptable.
IT IS FURTHER STIPULATED that unless and until further modification of the attached Order is sought by one or more of the 8306100078 830609 PDR ADOCK 05000529 G PDR
parties, the parties will endeavor to comply with the provisions of the Order should the Board choose to adopt its provisions.
DATED this day of May, 1983.
KENNETH BERLIN D ,>;? -f y ' .* v 2550 M Street, N.W.
Suite 500 Washington , D.C. 20037 Counsel for WEST VALLEY AGRICULTURAL PROTECTION COUNCIL,,INC.
SNELL & WILMER Bv /~ _ /
Arthur C."Gehr #
[
Warren E. Platt Charles A. Bischoff Vaughn A. Crawford 3100 Valley Bank Center Phoenix, Arizona 85073 Counsel for JOINT APPLICANTS l
l i
$N=Y g3 31-9 Pi2:07
..:~,.-~
UNITED STATES OF AMERICA a~
NUCLEAR REGULATORY COMMISSION BEFORE THE AT MIC SAFETY AND LICENSING BOARD In the Matter of )
)
ARIZONA PUBLIC SERVICE COMPANY, ) Docket Nos. STN 50-529 et al. ) STN 50-530
) ,
(Palo Verde Nuclear Generating )
Station, Units 2 and 3) )
)
EEEEE Upon stipulation of counsel, and good cause appearing therefor, IT IS ORDERED that the Order governing discover'y in this proceeding be modified as follows:
f A. The provisions respecting depositions shall now provide:
Depositions
(
Except as provided for in the CROP STUDY DISCOVERY schedule, IT IS ORDERED:
- 1. That the period during which depositions may be taken shall begin on August 29, 1983 and extend through December 16, 1983. Depositions noticed by the parties shall proceed on the following schedule until each party has completed such depositions as are desired by that party.
l l
a) August 29 through September 2 Depositions noticed by West Valley +
b) September 5 through September 9 Depositions noticed by Joint Applicants c) September 19 through September 23 Depositions noticed by West Valley d) September 26 through September 30 Depositions noticed by Joint Applicants e) October 10 through October 14 Depositions noticed by West Valley f) October 17 through October 21 Depositions noticed by Joint Applicants g) October 31 through November 4 Depositions noticed by West Valley
.h ) November 7 through November 11 Depositions noticed by Joint Applicants
- 1) November 21 through November 25 Depositions noticed by West Valley j) November 28 through December 2 Depositions noticed by Joint Applicants k) December 12 through December 16 Depositions noticed by West Valley
- 2. Unchanged from original Order, t
- 3. It is contemplated that discovery on all matters, other than the crop study to be conducted under the guidance of the University of Arizona (the " Crop Study"), shall be completed by December 16, 1983.
.4. Unchanged
- 5. Unchanged B. The provisions respecting post-November 7, 1983 discovery shall now provide:
l
?$M
- .tr_ .
'~
- l- Crop Study Discovery
..=,
--' ' " 1. The discovery concerning the Crop Study, which is 5 expected to be completed on or about December 15, 1983, will begin on December 20, 1983.
- 2. Joint Applicants agree to produce to the other parties on December 20, 1983 the Crop Study and all related documents, including all draf ts, preliminary studies, memoranda and corres-pondence relating to or in any way referring to the Crop Study.
- 3. If the Joint Applicants do not complete the Crop Study by December 15, 1983 and produce the applicable documents on December 20, 1983, the remaining schedule set forth in this Order shall be delayed by the amount of delay incurred because of the Joint Applicants' delay in completing the Crop Study.
- 4. Discovery portaining to the Crop Study shall be completed by February 20, 1984 or within two months after the document production required in paragraph 2 is completed, which-ever occurs first.
l C. The provicions respecting pre-trial preparation shall now provide:
[r.3-TrialPreparation
- 1. The parties sball pre-file testimony together with a list of exhibits no later than March 1, 1984.
- 2. The evidentiary hearing shall begin on April 2, 1984.
l l
l
, ~4-
/
- 3. If the Crop Study is not completed by December 15, 1983, the parties shall pre-trial testimony together with a list of exhibits no later than nine (9) days after discovery concludes, and the evidentiary hearing shall begin one month later.
FOR THE ATOMIC SAFETY AND LICENSING BOARD Robert M. Lazo, Chairman Administrative Judge 4