Responds to SALP Repts 50-445/94-99 & 50-446/94-99 Re Cpses,Maintenance & Plant Support
ML20072A287
Person / Time
Site: Comanche Peak  
Issue date: 08/05/1994
From: Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-94213, NUDOCS 9408120203
Download: ML20072A287 (17)


Text

. '

M==

2 Log

  1. TXX-94213 r

C File # 10130 Ref.

  1. 2.201 TUELECTRIC August 5, 1994 Wmiam J. Cahm, Jr.

Grny Vice hesident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 RESPONSE TO NRC SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) REPORT 50-445/94-99; 50-446/94-99 Gentlemen:

Via your letter of June 27, 1994 you transmitted the results of your SALP for CPSES Units 1 and 2.

The SALP report was your assessment of our regulatory performance for the SALP period beginning May 30, 1993 through May 28, 1994.

Subsequently on July 28, 1994 a meeting was conducted between the NRC staff and CPSES staff in which the results of your SALP assessment were discussed. At that meeting and via your June 27, 1994 letter you asked that any written comments TU Electric may wish to provide on the NRC SALP assessment be submitted within 30 days of the SALP meeting.

This letter transmits TV Electric's written response to the letter and supplements our oral responses provided at the meeting of July 28, 1994.

Your assessment of CPSES indicated superior performance in the areas of Engineering and Plant Support while the Maintenance and Plant Operations areas were evaluated as having good performance. We appreciated your recognition of CPSES's high level of performance. We also appreciated the open and candid discussion of our performance that occurred at the meeting on July 28, 1994. We found both the report and the meeting discussion to be quite helpful. As we stated in the meeting we intend to use the constructive criticisms provided in both forums to supplement our own self assessment program in our efforts to achieve excellence.

We believe that the additional comments we provided at the SALP meeting were adequate with respect to the functional areas of Engineering, Plant Support, and Plant Operations. Consistent with our comments at the SALP meetings we do wish to provide written comments on the Maintenance functional area and they are provided as Attachment 1.

9408120203"940805 PDR ADOCK 05000445 P. O. Box 1002 Glen Rose, Texas 76043-1002 I

C PDR v

l 1

I l

^

TXX-94213 Page 2 of 2 l

in conclusion we wish to reaffirm our commitment to continued improvement at i

CPSES. We recognize our need for continued diligence in pursuing that improvement and appreciate your candid assessment and verbal comments.

We I

do request that you consider our comments in any reassessment of the SALP functional area of Maintenance and trust that you will find our comments helpful.

Sincerely, William J. Cahill, Jr.

By:

9561 M."D.' Walker Regulatory Affairs Manager i

RDW'.cic Attachment i

Enclosure cc: Mr. L. J. Callan, Region IV Ms. Melanie Miller, Region IV Resider.t Inspectors, CPSES Mr. T.

A., Bergman, HRR I

1 l

l Attachment I to TXX-94213 Page 1 of 3 ATTACHMENT 1 l

l COMMENTS ON THE MAINTENANCE FUNCTIONAL AREA As we stated in the meeting of July 28, 1994 (overhead view graph material, ) we believe our performance in the SALP functional area of Maintenance during the last assessment period was at the level of a SALP Category 1 and wish to provide you with additional information for your use in reassessing the SALP functional area of Maintenance for CPSES as we requested at that meeting. We would note that our performance in our opinion has been at a sustained high level in the Maintenance area in that our previous SALP assessment indicated very limited areas for suggested improvements (primarily a suggestion to identify and effect corrective actions to preclude instances of missed surveillances which has been accomplished).

1 During the assessment period a considerable effort was put forth by Maintenance personnel to continue human performance improvements, manage corrective maintenance action backlog, and improve the material condition of the plant. We have had very good results in all of these efforts and we intend to continue to improve in these areas.

General Comments l

Specific organizational initiatives were undertaken during the assessment period. These initiatives were undertaken to enhance our support of safe and reliable plant operations. We believe these initiatives resulted in improved organizational performance, improved work practices, better communications and increased support to operations while reducing overtime costs.

Some of these changes are: the maintenance planners were merged with Work Control to form a centralized group, a move was made to a new facility, the elettricians and mechanics were put on a rotating shift to better support operations and a layer of management was eliminated to achieve a flattened organization resulting in more effective organizational communications.

i Noted Successes and Accomplishments Unit 2 reached commercial ope',ation without a significant increase in the maintenance backlog.

Maintenance staffing was enhanced with the hiring of permanent utility l

l employees to support the operation of a two-unit plant. Additionally, training was accomplished to support qualification of personnel to support both units.

l l

The surveillance program was further enhanced with the consolidation of the planners which led to one group tracking and scheduling the surveillances i

j for maintenance. The success of this enhancement is evidenced by no missed l

surveillance activities by maintenance.

l

I t

i

-Attachment 1 to TXX-94213 i

Page 2 of 3 Maintenance was instrumental in the reduction of Radwaste through:

o minimized use of_ plastic sheeting, j

o re-use of protective floor coverings and drop clothes when possible.

0 good use of " hot" tool room supplies, o

use of washable tool bags, and i

o good radwaste contamination control practices and measures l

Training for supervisors was completed in supervisory methods and j

observation training.

j Maintenance exhibited a consistently high quality level for the work 4

performed.

i The MOV testing program in accordance with NRC Generic Letter 89-10 i

continues to be a major strength.

{

i In the area of material condition, marked improvements have occurred due to strong management and personnel involvement.

Improperly alarming annunciator list was brought to a low level and painting projects have been completed throughout the plant.

During 1RF03, 27 design modifications and 136 minor modifications were implemented. These included the installation of the new plant computer system, RM-11 Radiation Monitoring system upgrade, and eliminating the

'j potential for MOV hot shorts.

j i

In addition, temperature problems with the 1A main feed pump were corrected,

)

implementation of leak reduction programs have increased plant efficiency and modification of the crossover drain system increased the performance of

-the High Pressure Drain system.

The decision was made to have a Unit 2 mid-cycle outage to repair steam leaks and perform otner maintenance items while ensuring efficiency from the unit during the remainder of the initial fuel cycle.

On site, the Zone Accountability Program (ZAP) area coordinators have been assigned specific areas. These coordinators lead teams which are responsible for the physical condition of their area.

Site areas have been cleaned up as the construction has finished. Examples include the removal of temporary buildings and new landscaping.

l

\\

, to TXX-94213 Page 3 of 3 Several Maintenance groups have joined in the Texas " Adopt-A-Highway" i

program adjacent to the plant.

Numerous remodeling projects were completed (such as the MSC, administration building,etc.).

Benchmark of CPSES Performance compared to other SALP Cateaory 1 and 2 Performers TU Electric compared our maintenance performance to 30 plants achieving a recent SALP rating of 1 (nine plants) or 2 (21 plants) in the functional area of maintenance.

Our review indicates that CPSES exceeds the performance of the plants rated Category 2 in quality of procedures or work instructions, surveillance performance, M&TE control, correction of SALP identified issues and personnel error reduction. Our review of the SALP Category 1 plants indicate to us that our performance was more consistent with this group in that commonalties exist with respect to strong planning and scheduling, a comprehensive check valve program, comprehensive surveillance program and comprehensive material condition program.

Additionally, the Category 1 plants experienced procedure compliance findings on a scale equivalent to or broader than CPSES in the maintenance area.

As the enclosed slides used at the July 28, 1994 meeting indicate, TU i

Electric believes our record with respect to corrective maintenance backlog, personnel error rate, and safety system performance has been consistent with SALP Category 1 performance throughout the SALP assessment period.

i i

)

i

_ =- -

V Al \\ __ _l\\ A N C _.

=

\\1 T A-~ VES GOAL:

0 EN-ANCE 3ER 0RVA\\CE

~~

AC-~ 0 N

- REORGA\\ ZED & V ERGED W~~- WOR ( C0\\TR0_

V 0VED ~~0 A N EW AC L ~~Y 3U~~ E _ ECT. & V EC

. O N T-E SAlV E S T AS 03 E RAT 0 \\ S

- E _ V N K E J O \\ E _AY E R 0 V A\\ AG E V E \\~~

R ESU _~~ :

-ORGAN ZK Oh V 3 ROVED 3ER 0RVA\\CE

-IVl3 ROVE 3 COVIV U \\ICK 10N S

- REDUCED OVE RT M E

_ = -

MA N-ENANCE SA_P 2 E-C0lVPARISO\\

C3SES val \\~~E\\A\\CE 3ER 0RVA\\CE A33EAREJ-O EXCEEJ

-E 3ER 0RVA\\CE Or SFES JESCR 3EJ \\ 2:. RE30T S REV EWE 3.

1 V Al\\TE\\ ANCE

- AJ NO WEA(\\ ESSES IDEN-~

EJ \\ ~~- E 20_ _0W \\ G AR EAS :

- QL Ai_ITY 0 3ROCEDURES 0R WOR ( \\S-RUC~~10\\S VISSEJ SURVEIL _ANCES

- V&~E COUR0_ PR03_EVS RECURR NG SALP EVALUA~~ 0N EVS 3ERSONN E_ ERROR 3ROGRAM

_=

MA h-Eh ANCE SA_31

=

COMPAR S0h

-C3SES V A \\TEh A\\CE 3ER 0RVIA\\CE COV 3ARED TO 9 S ~ES W- -I SAL 31 V A \\~~E N A\\ C E RK N GS S-RO\\G VIAL \\ TEN Al\\CE 3LAh N \\G A\\ J SC-EJUL NG

- C-EC( VA_VE SU RVE L _AN C E 3 ROG RAV A S-R E \\ G-VK ER A_ CON J 05 02

-E 3 _AN EXC E

_ _ E N K- ~~- E E \\ J 0

- E EVALLK 0 \\

3E R 0)

-_ = -

MA \\~~ENANCE SALP 1 COMPARISON

- SA ETY SYSTE V S 3 E R 0 R V A \\ C E RE V A \\ \\ G S~~ RO \\ G

- VA \\~ENANCE Al\\ J SURVE __A\\CE 3ROGRAVS C0\\~~ NUEJ

~~0 3 E S~~RO N G O N _Y SO _A~~ED EXA V 3 _ES Or 3ROCEDURA_ AJ-ERENCE 3 ROB _E V S

CORRECT VE Mall \\T. 3AC(_0G n

CO V 3AR SC \\ ~~0 SA_P :. S ~~ES 2,500 2,000 CO V A\\ C-1E

,,000 5

PEA(

$ 1,500 N

y 1,000 900 905 750

~

609 O

500 437 475 O

315 320 165 0

SALP 1 SITES

Ym.

~~0- AL E R RO R RK E uj1.8 I

z 1.6 FINAL COMPLETION

& STARTUP OF S 1.4 UNIT 2 ct O

v-e 1.2 W

1 q

W x

% 0.8 O&

W 0.6 1992 l

1993 l

1994


____---------------------.-.--,-------__-__----_--------_u s

a-

_ _ =

SA E_~Y SYS__

lV

=

~

3ER 0RVIAl\\CE HIGH PRESSURE SAFETY INJECTION AUX. FEEDWATER 2.5 3

w INPO GOAL LESS THAN 29' INPO GOAL LESS THAN 2.5%

a3 2.5

[

UNIT 1 h 1.5 _ NI 1 j 2

g f

UNIT 2 a

UNIT 2

$ 1.5 2

1 g

[

F 1

0.5 b

  1. 0.5 c

0 0

1993 1994 1993 1994 DATE DATE

_=

SA_ ___Y SYSTE M

=

=

3ER 0RVIA\\CE m.

m.

EMERGENCY AC POWER SYSTEMS EMERGENCY AC POWER SYSTEMS UNIT 1 UNIT 2 3

10 m 2'5

_ STATION GOAL LESS THAN 2.5%

w

\\

@8 5

\\

5 a2 TRAIN A R

$ 1.5

$4 STATION GOAL p

1 F

LESS THAN 2.5%

g 1

O O

2 g 0.5 g

A 0

0 1993 1994 1993 1994 DATE DATE

_==

SJCCESSES

_=

S P 30 T 0 U N ~~ 2 R EAC- \\ G CO V V E RC A_03 E RA-~ 05 2 U N ~~ S-A

\\ G A\\ J ~~RA N l\\ G SURVE __A\\CE PERFORVA\\CE

\\STL V E\\~~A_ \\ RADWAS-E REDUCT 0\\

SU3ERV SOR JEVE_03ME\\T

- QA ACCOU\\TA3_ITY G E\\ E R C _E TE R 89-10 V 0V ~~ES-~ \\G 3ROG RAV 1

_=.

VK ERIA CON J ~~ 0\\

V ATE R A_ CON J - 105 S G N CAN-LY V 3 ROVE J 3A \\T N G

- AN \\ U \\ ClK ORS

- V0J CK 0\\S

- COV 3 UTER RE3 _ ACE V E \\T

- RV-11 RAD ATION V O \\ f O R \\ G

- V 0V ~ S - O R-S

=

2:

VIK HIAL COND T101\\

- V A \\

E ED 3U V 3 3E RFO R V Al\\ C E EA( RE JUC-~ 0\\

3 ~~UR3 \\ E JRAl\\ 3ER 0RVA\\CE

- U N ~~ 2 V J CYCLE OU~~AG E

=.

--i P_ ANT C_EAN_ \\ ESS

~

- ZA3 3ROGRAV

- SITE R EC _AVIAT 0 N

-lG-WAY C _ EA\\ U 3

-0USE(EE3 \\G V 3ROVEV E\\~~S

-