ML20071Q699
| ML20071Q699 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/02/1983 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20071Q681 | List: |
| References | |
| NUDOCS 8306090226 | |
| Download: ML20071Q699 (2) | |
Text
.
PBAPS LIMITING CONDITIONS FOR OPERATIONS SURVEILLANCE REQUIREMENTS C. When it is determined that a channel has failed in the unsafe condition, the other RPS channels that monitor the same variable shal'1 be functionally tested immediately before the trip system containing the failure is tripped.
The trip system containing the unsafe failure may be placed in the untripped condition during the period in which surveillance testing is being performed on the other RPS channels.
The trip system may be in the untripped position for no more that eight hours per functional trip period for this testing.
D.
Reactor Protection System Power Supply Power Supply 1** Reactor Protection System 1.**The following RPS power Power Supply:
supply (,MG set) protective devices shall be functionally tested at least once every One trip train
inoperative condition for a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If this condition cannot be satisfied, Acceptable or if both trip trains are Device Setting inoperative, the RPS bus shall be transferred to th'e alternate Undervoltage 108 1 2 Volts source or de-energized within Overvoltage 132 1 2 Volts 30 minutes.
Underfrequency 57 Hz i.2 Hz Underfrequency Time Delay 6 sec + 1 sec 0306090226 830602 PDR ADOCK 05000277 PDR p
=
PBAPS LIMITING CONDITIONS FOR OPERATIONS SURVEILLANCE REQUIREMENTS 2** One trip train
- of the RPS 2** The following RPS alternate alternate power supply may power supply protective be in the bypassed or devices shall be functionally inoperative condition for tested at least once every six a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If this months and calibrated once condition cannot be satisfied, each refueling outage.
or if both trip trains are inoperative, the RPS bus'shall be transferred to the RPS MG Acceptable set or de-energized within Device Setting 30 minutes.
Undervoltage 108 1 2 Volts Overvoltage 132 1 2 Volts Underfrequency 57 Hz t.2 Hz l
l l
A trip train consists of one breaker, one undervoltage relay, one overvoltage relay, one underfrequency relay, one time delay relay (MG set only), and the associated logic.
Effective upon installation of the protective trip devices.
- 36a -
._.