ML20071Q096

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1982
ML20071Q096
Person / Time
Site: Kewaunee 
Issue date: 11/01/1982
From: Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
Shared Package
ML20071Q076 List:
References
NUDOCS 8212290216
Download: ML20071Q096 (4)


Text

,

DOCKET 50-305 KEW AUNEE NUCLEAR POWER PLA NT

SUMMARY

OF OPERATING EXPERIENCE October, 1982 OPER ATIONS:

On October 10, unit generation was-reduced to 75%

for the nonthly Turbl6e Stop Valve Test.

M AINT EN A NCE:

Replaced a defective Radiation Monitor paper drive motor.

Replaced a defective Radiation Monitor detector.

Replaced a broken diesel stack temperature switch.

Replaced a Control Room A/C fan motor.

Rebuilt a Charging Pump.

8212290216 821109 PDR ADOCK 05000305 R

PDR

AVER AGE DAILY UN IT POV ER LEVEL DOC KET NO-50-305 UNIT-KEWAUNEE COMPLETED DY-G.

H.

RUITER TELEPHONE-414-388-2560 X225 j

REPOET MONTH OCTOPER, 1982 AVERAGE DAILY DAY POWER LEVEL (MW E-N ET) 1 508 2

512 3

500 4

503 5

508, 6

512' 7

508 8

508 9

512 10 471 11 487 12 503 13 499 14 512 15 508 16 512 17 508 18 508 19 512 20 508 21 508 22 512 23 508 24 508 25 508 26 512

~

27 512 l

28 508 29 512 30 512 31 506 1

4 A

4 9 6.

UN IT SHUTDOW WS A ND POV ER REDDCTIONS m

DOCKET NO: 50-305 UNIT NAME: Kewaunee DATE: November 1, 1982 m

COMPLETED BY:

G.

H.

Puiter TEL EPl!ON E: 41 f4-38 8-2560 r225 6

REPORT MONTH - OCTOBER, 1982 9

9 1

NO.

I DATE ITYPE IDURATIONIREASONIMETHODI LER NDMBER ISYS I COPPONENT l COMMENTS I

I F

+

l l

l l

l l

1 1

I I

I I

I I

I i

i i

9 I

I i

l l

l 1

1 I

I No shutdowns or load reductions during i i

I i

i i

I I

I i

1 October.

I I

I I

I I

I I

I I

I I

9 I

I i

1 1

I I

I I

I I

I I

1 l

l I

I I

I I

I I

I I

I I

I I

I I

I l

9 I

I I

I I

I i

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

1 I

i 1

9 1

1 I

I I

I I

l i

I

(

l l

I I

I I

I I

I I

i 1

1 I

I i

i 1

l I

I i

1 I

9 I

I I

i i

I I

I I

I i

1 I

I I

I i

i I

I I

I I

I I

I I

I I

I I

I 1

9 I

I I

i 1

I I

I I

I I

I I

I I

I I

I I

I i

i I

e I

I I

i I

i I

i 1

I 9

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

l 9

I I

I I

i 1

I i

l 1

I i

I i

i l

I I

i I

I 1

I i

i I

I I

i I

I I

I 9

I I

I I

I I

I I

I I

I i

1 1

I I

I I

I I

i

  • 1 1

1 I

I I

I I

I I

I I

9 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

.I I

.I I.

I.

I.

I.

I i

1 1

9 TYPE RE ASON METHOD SYSTEN & CdMPONENT CODES F: Forced A-Equipment Failure (Explain) 1-Manual From NnPEG-0161 S: S ch ed::l ed B-Maintenance or Test 2-Manus 1 Scras

~\\

C-Refueling 3-Automatic Scras D-Regulatory Restriction 4-Continuations E-Operator Training & License Examination 5-Load Peductions

^

F-Ad ministra t i ve 9-Other G-Operat ional Error (Explain)

^

H-Other (Explain) 2

?

a

.a.

a

-g OPER ATIN G D ATA REPO RT DOCKET No-50-305 COMPLETED BY-G.

H.

RUITER O PER AT ING STATUS TELEPH3NE-414-388-2560 I225 1 UNIT NAME KEWAUNEE 2 REPORTING PERIOD OCTOBER, 1982

  • NOTES 3 LICENSED THERMAL POW ER (MWT) 1650 As of the end of this reporting period
  • the unit has been continuously on line 4 NAMEPLATE RATING (GROSS MWE) 560 f or 16 0 corsecutive days.

5 DESIGN ELECTRICAL RATINC (NET MWE) 535

-3 6 MAXIM 1M DEPENDABLE CAPACITY (GROSS MWE) 538 7 MAEIMUM DEPENDABLE CAPACITY (NET MW E) 511 8 IF C!l ANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPOPT, GIVE REASONS Updated M DC ( Ne t) and MDC (Gross) based on capacity test for the forth quarter performed on October 27, 1982.

9 POW ER LEVEL TO bHICH RESTRICTED, IF ANY (NET MWE) None 13 R E ASONS FOR RES13ICTIONS, IF ANY 9

THIS MONTH YR-TO-DATE CpMULATIVE s

11 HOURS IN REPORTING PERIOD 745 7296 73441 9

12 NUMSER OF HOURS REACTOR WAS CRITICAL 745.0 6296.4 62298.3 13 REACTOR R ES ER V E S!!UT DOU M HOURS 0.0 0.0

.- 2330.5 s

14 HOURS GENERATOR ON-LINE 745.0 6239.5 61046.3 15 UhIT RESERVE SU1DOWN HOURS 0.0

0. 0 10.0 16 GROSS THERM AL ENERGY G2NERATED (MWH) 1214805 10037309 94844243 17 GROSS ELECTRICAL EN ERGY GENERATED (MWH) 396400 3278200 31230600 l

18 NET ELECTRIC AL EN ER GY GEN ER ATED (MWH) 377319 3123066 29723343 1

19 UNIT SERVICE FACTOR 100.0 85.5 83.1 100.0 85.5 83.1 20 UNIT AVAILABILITY FACf0R 21 UNIT CAPACITY FACTOR (USING MDC NET) 99.1 83.2 77.5 22 UNIT CAPACITY FACTOR (USING DER N ET) 94.7 80.0 75.6 23 UNIT FORCED OUTAGE R ATE 0.0 0.1

4. 4 24 SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, D AT E, AND DURATION OF E AClf) befueling shutdown of 8-veek duration scheduled to start March 20, 1983.

25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIM ATED DATE OF STARTUP - N/A n

me g