ML20071Q046

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1994 for Point Beach Nuclear Plant,Units 1 & 2
ML20071Q046
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/31/1994
From: Koudelka M, Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-94-0237, PBL-94-237, NUDOCS 9408100327
Download: ML20071Q046 (10)


Text

'

,.1 J..

Wisconsin 1 Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Noctoor Rd, two Ryers. VA 54241 (414) 755 2321 PBL 94-0237 August 5, 1994 Document Control Desk U.

S.

NUCLEAR REGULATORY COteiISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of July, 1994.

Sincerely,

/

G.

J.I field PBNP Manager djs Attachments cc:

L.

L.

Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector

(i; 9408100327 940731 PDR ADOCK 05000266 i

R PDR 1

.4 suhdm of Hivvisi1Dxw Gulkmrther

e '.

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-265 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH JULY -

1994 DATE August 5,1994 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

496 11 491 21 494 2

489 12 493 22 494 3

489 13 493 23 494 4

489 14 492 24 494 5

491 15 490 25 493 6

490 16 489 26 493 7

489 17 491 27 494 8

488 18 489 28 492 i

9 491 19 490 29 490 10 490 20 492 30 486 31 497 i

e DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 DATE August 5, 1994 COMPLETED BY M.

B.

Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 491 MWe net for the report period.

Licensee Event Report 50-266/94-006-00, Incorrect Operability Determination Following Spurious Halon Actuation, was submitted.

Safety-related maintenance included:

1.

A05 4.16 kV safeguards bus switchgear degraded grid voltage relay harmonic analysis.

2.

A06 4.16 kV safeguards bus switchgear degraded grid voltage relay harmonic analysis.

3.

D12-06 power to 1MS-2019 steam to 1P29 auxiliary feedwater pump breaker replacement.

4.

DT-2080 1P29 auxiliary feedwater pump trip valve TTV-2082 drain trap rebuild and cover gasket replacement.

5.

Installation of new G03 emergency diesel generator subpanel and G05 combustion turbine wattmeter.

1 6.

Calibration of new diesel generator project degraded grid i

voltage relays.

7.

N36 NI intermediate range channel resetting of rod stop and high trip setpoints.

8.

1P29 GOV-Z turbine-driven auxiliary feedwater pump governor packing and valve stem replacement.

9.

Reactor trip breaker 52/RTB protective cover replacement.

10.

SW-2869-0 north to west service water header operator l

4-rotor limit switch and thermal overload indication installation.

11.

SW-2870-0 south to west service water header operator 4-rotor limit switch and thermal overload indication installation.

1

.o

\\

12.

SW-2930A-O HX-13A spent fuel pool heat exchanger operator 4-rotor limit switch and thermal overload indication installation.

13.

SW-2930B-O HX-138 spent fuel pool heat exchanger operator 4-rotor limit switch and thermal overload indication installation.

)

4 OPERATING DATA REPORT DOCKET No. 50-301 DATE:

08/05/94 COMPLETED BY:

M.

B.

Koudelka TELEPHONE:

414 755-6480 OPERATING STATUS 1.

UNIT NT.ME:

POINT BEACH NUCLEAR PLANT - UhiT 2 NOTES 2.

REPORTING PERIOD: July - 1994 3.

LICENSED THERMAL POWER (MWT):

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8 5.

DESIGN ELSCTRICAL RATING (NET MWE):

497.0 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.0 7.

MAXIMUM UEPENDABLE CAPACITY (NET MWE):

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA

10. REASONS FOR RESTRICTIONS, (IF ANY)t NA THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744.0 5,087.0 192,840.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,087.0 169,287.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON 'JNE 744.0 5,087.0 166,953.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,126,859 7,537,407 240,008,591
17. GROSS ELECTRICAL ENERGY GENERATED 378,330 2,587,390 81,611,650
18. NET ELECTRICAL ENERGY GENERATED (MWH) 361,434 2,474,945 77,805,585
19. UNIT SERVICE FACTCn 100.0%

100.0%

86.6%

20. UNIT AVAILABILITY FACTOR 100.0%

100.0%

86.7%

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.2%

100.3%

82.6%

22. UNIT CAPACITY FACTOR (USING DER NET) 97.7%

97.9%

81.2%

23. UNIT FORCED OUTAGE RATE 0.0%

0.0%

1.0%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF FACH):

Refueling Outage, 09/24/94, 36 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

+.

POINT BEACH NUCLEAR PLANT Decket No.

50-301 Unit Name Point Beach. Unit 2 UNIT S11UTDOWNS AND POWER REDUCTIONS Date Aucust 5.1904 7.

Completed By M. B. Koudelka REPORT MONTH JULY - 1994 Telephone No.

414/755-6480 Method of Shutting Duntion Down Ucensee Event System Cornponent Cause and Conective Action W.

Date Type' (Houn)

Reason' p,,c,y Repost No.

Code' Code' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA

'F: Forced 2Peason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of i

E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load F - Admirdstrative 6 - Other (explain)

' Exhibit 1 - Same Source G - Operational Error (explain) 11 - Other (explain)

PBF4028b (03 90)

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH JULY -

1994 DATF.

August 5,1994 COMoLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

490 11 487 21 489 2

485 12 487 22 489 3

485 13 487 23 492 4

486 14 486 24 491 5

487 15 484 25 490 6

486 16 484 26 489 7

485 17 484 27 491 8

485 18 484 28 489 9

488 19 485 29 486 10 487 20 486 30 487 31 449

...x.

c

~

DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE July 5, 1994 COMPLETED BY M.

B.

Koudelka TELEPHONE 414/755-6480 Unit 2 operated at an average of 486 MWe net for the report period with no significant load reductions.

Licensee Event Report 50-301/94-001-01, Potential Feedwater Flow i

Measurement Inaccuracies, was submitted.

Safety-related maintenance included:

1.

A05 4.16 kV safeguards bus switchgear degraded grid voltage relay calibration and harmonic analysis.

2.

A06 4.16 kV safeguards bus switchgear degraded grid voltage relay harmonic analysis.

3.

FIS-650 PISA &B safety injection pump seal water heat exchanger shell side outlet flow indicator replacement.

4.

P2A charging pump seals replacement.

5.

SI-839D "B" safety injection cold leg to safety injection test line isolatiori valve spring adjustment.

c '.

OPERATING DATA REPORT DOCKET NO. 50-266

'Ci DATE: 49/G5/94 COMPLETED BY:

M.

B.

Koudelka TELEPHONE:

414 755-6480 OPERATING STATUS

1. UNIT NAME:

POINT BEACH NUCLEAR PLANT - UNIT 1

. NOTES

2. REPORTING PERIOD: July - 1994 3.

LICENSED THERMAL POWER (MWT):

1518.5 4.

NAMEPLATE RATING (GROSS MWE):

523.8 5.

DESIGN ELECTRICAL RATING (NET MWE):

497.0 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.0.

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

485.0 8.

IF OHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA s

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

NA

10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 5,087.0 208,055.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,461.6 173,180.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 744.0 4,413.1 170,053.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,129,764 6,523,287 240,005,057
17. GROSS ELECTRICAL ENERGY GENERATED 382,340 2,207,930 81,062,060
18. NET ELECTRICAL ENERGY GENERATED (MWH) 365,660 2,109,828 77,265,418
19. UNIT SERVICE FACTOR 100.0%

86.8%

81.7%

20. UNIT AVAILABILITY FACTOR 100.0%

86.8%

82.1%

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3%

85.5%

76.2%

22. UNIT CAPACITY FACTOR (USING DER NET) 98.9%

83.5%

74.7%

23. UNIT FORCED OUTAGE RATE O.0%

0.0%

1.6%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED *AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

'A

POINT BEACH NUCLEAR PLANT Decket No.

50-266 Unit Name Point Becch. Unit 1

- UNIT SIIUTDOWNS AND POWER REDUCTIONS Date Aucust 5.1994 Completed By M. B. Koudelka -

REPORT MONTil JULY - 1994 Telephone No 414/755-6480 _

Method of Shutting Duranon Down Ucensee Event System Component Cause and Corrective Action W.

Date Ty pe' Olours)

Reason' React <d Report No.

Code' Cafe' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA l

i

'F: Forced 2 Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)

' Exhibit 1 - Same Source G - Operational Error (explain) 11 - Other (explain)

PBF-CD28b f