ML20071P988
| ML20071P988 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/23/1983 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20071P969 | List: |
| References | |
| LIC-83-050, LIC-83-50, NUDOCS 8306080236 | |
| Download: ML20071P988 (1) | |
Text
_
e 4
Omaha Public Power District 1623 HARNEY a OMAHA, NEBRASKA 68102 e TELEPHONE 536 4000 AREA CODE 402 February 23, 1983 LIC-83-050 Ps r g,r..r: 1,...F
'li o Mr. W.
C. Seidle, Chief 2
'i. :
w rd '
Reactor Project Branch 2 L
i !!
U. S. Nuclear Regulatory Commission FEB 281983 i ll i
llegion IV ELJ/Lgj 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Reference:
Docket No. 50-285
Dear Mr. Seidle:
IE Inspection Report 82-21 The subject Inspection Report identified a concern regarding the Fort Calhoun Station sampling and analytical programs.
Speci-fically, the inspectors had performed several confirmatory measurements on gaseous samples and noted disagreements between Omaha Public Power District's and their analysis results.
Accordingly, the subject report asked the District to evaluate this concern and provide you a summary of corrective actions to be taken.
As a result of the inspector's findings, the District conducted an evaluation of the Fort Calhoun Station sampling techniques and procedures.
The methods used by the District for sample pre-paration were consistent with those used by the inspector.
Accord-ingly, the District believes the large number of disagreements between District and inspector analytical results was caused by differences in instrument calibrations.
Therefore, the District implemented a program to cross-calibrate the Canberra and TN-ll gamma spectrometer systems using NBS traceable standards.
This calibration program is expected to be completed by April 3, 1983 and should significantly improve the accuracy of the Fort Calhoun Station's analytical program.
Sincerely, an x (6W emo NNE W.
C.' Jones o8 Division Manager Q@
Production Operations o
WCJ/TLP:jmm 4ni cc:
LeBoeuf, Lamb, Leiby & MacRae gg so 1333 New Hampshire Avenue, N.W.
$4 Washington, D.
C.
20036 ox MQ m a.C Mr. L. A. Yandell, NRC Senior Resident Inspector